Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹14.4 LAccepted-AOC F 42 VAISHNAV APARTMENT HOSHANGABAD ROAD SURENDRA PALACE BHOPAL MADHYA PRADESH 462023 | BHOPAL | MADHYA PRADESH | 462023 | L-1 | Accepted-AOC Lowest bidder for the work. | |
| 2 | L-2₹15.2 L+₹28,566.60 (1.91%)Rejected-Finance | L-2 | Rejected-Finance other than the lowest bidder | |
| 3 | L-3₹15.5 L+₹51,139.60 (3.42%)Rejected-Finance | L-3 | Rejected-Finance other than the lowest bidder |
| Sl No | Description | Qty | Unit | TANUJ CONST. CO. L3 | M/s SHIVRATAN CONSTRUCTION L2 | ELITE WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Disconnecting electrically and mechanically outdoor distribution transformers upto 100 KVA 11KV / 0.44 KV capacity, outdoor /indoor type lowering down from 4/6 pole structure/plinth with electric precaution incl lifting of core assembly by opening of top cover and other items for checking of faults/repair and lowering / refixing the same in its original position after inspection to make it ready for transportation to carry out testing in workshop including transportation of unservicieable transformer workshop ( rate is deemed to be inclusive of transportation , T&P and men power ) and reinstalled after repair at its original position complete all as specified and directed. | 3 | Each Job | 3,000 ₹9,000 Lowest | 3,000 ₹9,000 Lowest | 4,563 ₹13,689 |
| 2.00 | Disconnecting electrically and mechanically outdoor distribution transformers upto 500 KVA 33KV / 11 KV capacity, outdoor /indoor type lowering down from 4/6 pole structure/plinth with electric precaution incl lifting of core assembly by opening of top cover and other items for checking of faults/repair and lowering / refixing the same in its original position after inspection to make it ready for transportation to carry out testing in workshop including transportation of unservicieable transformer workshop ( rate is deemed to be inclusive of transportation , T&P and men power ) and reinstalled after repair at its original position complete all as specified and directed. | 1 | Each Job | 4,000 ₹4,000 Lowest | 4,000 ₹4,000 Lowest | 9,125 ₹9,125 |
| 3.00 | Taking out the unserviceable copper winding from transformer of capacity upto 500 KVA after opening top cover, and carrying out the following repair work complete all as specified and directed :-
(a) Dismantling of all attachment viz breather assembly, conservator, oil temperature gauge, HT/LT bushing etc. and keeping aside for reuse..
(i) Taking out the core with winding assembly.
(ii) Removing of complete winding from core and dismantling the core, cleaning of core laminate sheet and keeping aside for reuse
(iii) Cleaning of complete transformer tank oil fins, removing of sludge, and making the inside surface of tank dry by blowing of hot air as directed and specified.
(iv) Painting of outside surfaces of transformer complete by means of spray machine as directed.
(v) Replacement double paper coated insulation including all requisite insulating materials like packing sleeves, separator, tapes etc. heating, varnishing the core and winding assembly after framing up top and bottom steel structure of transformer all as specified and directed.
(vi) Fixing only HT procelain bushing with studs, nuts, washers 3 Nos. and LT procelain bushing with studs, nuts, and washers 4 Nos. and connection with primary and secondary windings and reconnecting with the main terminals as required and directed.
(vii) Fixing only breather assembly, conservator, oil temperature gauge after proper cleaning, minor repairs etc. as required and directed.
(viii) Replacement of all unserviceable gasket from top cover, HT/LT bushing with new one by using rubberised gasket sheet 4.0mm/6.0mm thick duly pasted with suitable adhesive .
(ix) Replacement of unserviceable bolts with new one and fixing of existing serviceable bolts, nuts, washers of different sizes and tightening properly.
(xi) Repositioning of core and winding assembly inside the tank, assembling complete unit and making the transformer ready for filling oil and subsequent testing as directed.
(xi) Filling/topping up of new transformer oil of required quantities . | 2 | Each Job | 7,000 ₹14,000 | 6,500 ₹13,000 Lowest | 9,125 ₹18,250 |
| 4.00 | Supply only HT coils with super enamelled copper wire /DPC of high quality duly matching with the existing guage and impedance complete all as specified and as directed. | 75 | Kg | 750 ₹56,250 | 550 ₹41,250 Lowest | 895 ₹67,125 |
| 5.00 | Supply only LT coils with super enamelled copper wire strip/DPC of high quality duly matching with the existing guage and impedance. | 75 | Kg | 750 ₹56,250 | 600 ₹45,000 Lowest | 895 ₹67,125 |
| 6.00 | Supply and fill unused mineral insulating oils conforming to IS 335: 2018, Type II Class (Transformer oils), Uninhibited (U), pour point -10⁰C, vacuum filtered in a laboratory, Breakdown voltage of min 70 kV at 2.5 mm gap complete all as specified and as directed. | 790 | Per Litre | 160 ₹1,26,400 | 125 ₹98,750 | 10 ₹7,900 Lowest |
| 7.00 | Filtration, Dehydration, reconditioning of transformer oil by using filtering equipment, vacuum dehydrator etc. to obtain minimum break down voltage of 60 kV and maximum water content of 30 mg/kg as per IS 1866: 2017 and IEC 60422: 2013 complete all as specified and as directed. | 1,200 | Per Litre | 25 ₹30,000 | 9 ₹10,800 | 6.5 ₹7,800 Lowest |
| 8.00 | Supplying and fixing in replacement, Porcelain Transformer bushing on LT (440 Volt) side, including brass stems conical bush and gasket after disconnecting electrically and mechanically for indoor/outdoor transformer of capacity upto500 KVA and re-connecting electrically and mechanically, testing complete all as specified and directed.
Note:- The rates quoted is deemed to be included the cost of necessary labour charges for draining out & re-filling transforer oil, opening of top cover by unscrewing nut, bolts washers and provision of pad type bus bar almuminium of approppiate size /capacities of transformers with nut bolt & washers. | 4 | Each | 750 ₹3,000 Lowest | 900 ₹3,600 | 1,095 ₹4,380 |
| 9.00 | S & F in repairs HT side 36 kV/ 250 A bushing with copper stem including both porcelain parts and metal parts upto 500 KVA distribution transformer with accessories as per IS 3347 Part 5 (section 1 & 2) complete all as specified and as directed. | 3 | Each | 750 ₹2,250 Lowest | 1,100 ₹3,300 | 1,735 ₹5,205 |
| 10.00 | S&F in repairs Core of transformer upto 500KVA transformer made of High grade cold rolled grain orient (CRGO) annealed steel of M4 or superior, having low loss and good graing properties, conform to IS 3024 and IS 649-1983, including core lamination and providing manufacturers test report showing losses in Watt per kg, complete all as specified and directed | 80 | Kg | 300 ₹24,000 | 260 ₹20,800 Lowest | 650 ₹52,000 |
Tender Value
₹17 L
EMD Value
₹34,000
Closing Date
28 Mar 2026, 6:00 pmClosed
Col Pawan Kumar, CWE
Headquarters, Commander Works Engineer, Bhopal, Military Engineer Services, SI Line, Bhopal, Pin Code - 462001 (Madhya Pradesh)
MAINT AND REPAIR EXTERNAL HT SUPPLY WORKS AND CONNECTED WORKS AT TECH AREA CPE ITARSI UNDER GE BHOPAL
2026_MES_752785_2
84180/E8
Open Tender
Civil Works
Item Rate
180 days
Bhopal
AS PER NIT CONDITION
7 documents required · 7 mandatory
₹500
Yes
GE Bhopal
₹34,000
Yes
25 Apr 2026
19 Mar 2026
30 Mar 2026
19 Mar 2026
28 Mar 2026
23 Mar 2026
19 Mar 2026 - 23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Disconnecting electrically and mechanically outdoor distribution transformers upto 100 KVA 11KV / 0.44 KV capacity, outdoor /indoor type lowering down from 4/6 pole structure/plinth with electric precaution incl lifting of core assembly by opening of top cover and other items for checking of faults/repair and lowering / refixing the same in its original position after inspection to make it ready for transportation to carry out testing in workshop including transportation of unservicieable transformer workshop ( rate is deemed to be inclusive of transportation , T&P and men power ) and reinstalled after repair at its original position complete all as specified and directed. | - | Each Job | - | - |
| - | Disconnecting electrically and mechanically outdoor distribution transformers upto 500 KVA 33KV / 11 KV capacity, outdoor /indoor type lowering down from 4/6 pole structure/plinth with electric precaution incl lifting of core assembly by opening of top cover and other items for checking of faults/repair and lowering / refixing the same in its original position after inspection to make it ready for transportation to carry out testing in workshop including transportation of unservicieable transformer workshop ( rate is deemed to be inclusive of transportation , T&P and men power ) and reinstalled after repair at its original position complete all as specified and directed. | - | Each Job | - | - |
| - | Taking out the unserviceable copper winding from transformer of capacity upto 500 KVA after opening top cover, and carrying out the following repair work complete all as specified and directed :-
(a) Dismantling of all attachment viz breather assembly, conservator, oil temperature gauge, HT/LT bushing etc. and keeping aside for reuse..
(i) Taking out the core with winding assembly.
(ii) Removing of complete winding from core and dismantling the core, cleaning of core laminate sheet and keeping aside for reuse
(iii) Cleaning of complete transformer tank oil fins, removing of sludge, and making the inside surface of tank dry by blowing of hot air as directed and specified.
(iv) Painting of outside surfaces of transformer complete by means of spray machine as directed.
(v) Replacement double paper coated insulation including all requisite insulating materials like packing sleeves, separator, tapes etc. heating, varnishing the core and winding assembly after framing up top and bottom steel structure of transformer all as specified and directed.
(vi) Fixing only HT procelain bushing with studs, nuts, washers 3 Nos. and LT procelain bushing with studs, nuts, and washers 4 Nos. and connection with primary and secondary windings and reconnecting with the main terminals as required and directed.
(vii) Fixing only breather assembly, conservator, oil temperature gauge after proper cleaning, minor repairs etc. as required and directed.
(viii) Replacement of all unserviceable gasket from top cover, HT/LT bushing with new one by using rubberised gasket sheet 4.0mm/6.0mm thick duly pasted with suitable adhesive .
(ix) Replacement of unserviceable bolts with new one and fixing of existing serviceable bolts, nuts, washers of different sizes and tightening properly.
(xi) Repositioning of core and winding assembly inside the tank, assembling complete unit and making the transformer ready for filling oil and subsequent testing as directed.
(xi) Filling/topping up of new transformer oil of required quantities . | - | Each Job | - | - |
| - | Supply only HT coils with super enamelled copper wire /DPC of high quality duly matching with the existing guage and impedance complete all as specified and as directed. | - | Kg | - | - |
| - | Supply only LT coils with super enamelled copper wire strip/DPC of high quality duly matching with the existing guage and impedance. | - | Kg | - | - |
| - | Supply and fill unused mineral insulating oils conforming to IS 335: 2018, Type II Class (Transformer oils), Uninhibited (U), pour point -10⁰C, vacuum filtered in a laboratory, Breakdown voltage of min 70 kV at 2.5 mm gap complete all as specified and as directed. | - | Per Litre | - | - |
| - | Filtration, Dehydration, reconditioning of transformer oil by using filtering equipment, vacuum dehydrator etc. to obtain minimum break down voltage of 60 kV and maximum water content of 30 mg/kg as per IS 1866: 2017 and IEC 60422: 2013 complete all as specified and as directed. | - | Per Litre | - | - |
| - | Supplying and fixing in replacement, Porcelain Transformer bushing on LT (440 Volt) side, including brass stems conical bush and gasket after disconnecting electrically and mechanically for indoor/outdoor transformer of capacity upto500 KVA and re-connecting electrically and mechanically, testing complete all as specified and directed.
Note:- The rates quoted is deemed to be included the cost of necessary labour charges for draining out & re-filling transforer oil, opening of top cover by unscrewing nut, bolts washers and provision of pad type bus bar almuminium of approppiate size /capacities of transformers with nut bolt & washers. | - | Each | - | - |
| - | S & F in repairs HT side 36 kV/ 250 A bushing with copper stem including both porcelain parts and metal parts upto 500 KVA distribution transformer with accessories as per IS 3347 Part 5 (section 1 & 2) complete all as specified and as directed. | - | Each | - | - |
| - | S&F in repairs Core of transformer upto 500KVA transformer made of High grade cold rolled grain orient (CRGO) annealed steel of M4 or superior, having low loss and good graing properties, conform to IS 3024 and IS 649-1983, including core lamination and providing manufacturers test report showing losses in Watt per kg, complete all as specified and directed | - | Kg | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_847912.xls
BOQ • 0.30 MB
84180TenderDocuments.pdf
Tender Documents • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .