| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.4 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹56.6 L+₹18,279.85 (0.32%)Rejected-AOC MAHESWARI NAGAR IN WARD NO 38 TAMIL NADU TN | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Annai Abirami Enterprises | POOJA FOUNDATION |
|---|---|---|---|---|---|
| 1.00 | Cutting the BT Road surface including cost of all labour charges etc completed. | 54 | Cum | 50,220 ₹59,259.6 | 50,214.6 ₹59,253.23 Lowest |
| 2.00 | Cutting RCC (Culvert Slab ) surface including all labour charges etc complete | 3 | Cum | 12,930 ₹15,257.4 | 12,924 ₹15,250.32 Lowest |
| 3.00 | Earth work excavation and depositing on bank initial lead of 1.00mand lift of 2m in narrow trenches for laying of pipes for water supply in the following type of soils of sand,silt or othe loose soil ,wey sand or silt not under water light black cotton soil ,sandy loam and ordinary soil etc complete as per standard specification. | 900 | RM | 2,70,000 ₹3,18,600 | 2,66,220 ₹3,14,139.6 Lowest |
| 4.00 | Supply and Delivery of 250mm DI Socket /Spigot Pipes for Class K9 as per is 8329/2000 with ISI marking etc complete as per Standard specifications | 900 | Rm | 36,18,000 ₹42,69,240 | 36,17,460 ₹42,68,602.8 Lowest |
| 5.00Supply and delivery of 250 mm DI D/F & S/S Bends Sluice valveincluding cost and conveyance chargs etc complete | |||||
| 5.01 | 250 Sluice Valve | 1 | Each | 27,680 ₹32,662.4 | 27,675 ₹32,656.5 Lowest |
| 5.02 | Di Specials | 1,200 | Kg | 1,80,000 ₹2,12,400 | 1,78,800 ₹2,10,984 Lowest |
| 6.00Laying, jointing ,testing 250mm C. I / DI pipes 1.00Mt Depth including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10 metres and carting of pipes from any of the Board’s stores to the site of work, lowering into trenches and aligning, etc., complete (Timbering included for Depths 2.50m,3.0m,3.5m,..........upto 8.5m) | |||||
| 6.01 | Laying /Lowering | 900 | Mtr | 43,200 ₹50,976 | 42,930 ₹50,657.4 Lowest |
| 6.02 | Jointing Pipes | 155 | Each | 19,840 ₹23,411.2 | 19,685 ₹23,228.3 Lowest |
Tender Value
₹57 L
EMD Value
₹57,000
Closing Date
16 Jul 2025, 3:00 pmClosed
The Commissioner, Tambaram City Municipal Corporat
No.01,Kalaivani Street ,Rajakilpakkam,Chennai-73
laying of 250mm DI distribution water supply pipe line at Purusothaman Nagar 3rd main road to silapathikaram street in Ward No.36 and 37
2025_DMA_581295_29
003/2025/E1
Open Tender
Civil Works
Works
90 days
Tambaram City Municipal Corporation
laying of 250mm DI distribution water supply pipe line at Purusothaman Nagar 3rd main road to silapathikaram street in Ward No.36 and 37
2 documents required · 2 mandatory
₹0
₹57,000
17 Sept 2025
14 Jul 2025
16 Jul 2025
14 Jul 2025
16 Jul 2025
14 Jul 2025
Cutting the BT Road surface including cost of all labour charges etc completed.
Cutting RCC (Culvert Slab ) surface including all labour charges etc complete
Earth work excavation and depositing on bank initial lead of 1.00mand lift of 2m in narrow trenches for laying of pipes for water supply in the following type of soils of sand,silt or othe loose soil ,wey sand or silt not under water light black cotton soil ,sandy loam and ordinary soil etc complete as per standard specification.
Supply and Delivery of 250mm DI Socket /Spigot Pipes for Class K9 as per is 8329/2000 with ISI marking etc complete as per Standard specifications
Supply and delivery of 250 mm DI D/F & S/S Bends Sluice valveincluding cost and conveyance chargs etc complete
250 Sluice Valve
Di Specials
Laying, jointing ,testing 250mm C. I / DI pipes 1.00Mt Depth including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10 metres and carting of pipes from any of the Board’s stores to the site of work, lowering into trenches and aligning, etc., complete (Timbering included for Depths 2.50m,3.0m,3.5m,..........upto 8.5m)
Laying /Lowering
Jointing Pipes
Jointing Specials D/F
Dewatering using diesel Engine 10HP pumpset including Hire charges,cost of Diesel,Engine oil,pump operator,labour charges,conveyance of pumpset and fuel to site and back,loading,unloading and any other incidental charges etc complete
Refilling with excavated earth other than sand with an initial head load of 10 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification
Relaying of Utility of Water supply and UGSS pipe line works
Barricading work (Where the lines are in narrow widthof municipality area, busy streets like Market, Bus- stand and in the Highways etc.) for laying of pipe lineusing casurina poles at 1.50m center to center (8cm to 10cm dia. and 1.80m height) vertical with horizontalpoles in two rows, painting the vertical poles in the roadfacing sides with ready mix paint, tying the verticaland horizontal poles with coir rope including supplying,delivery and fixing of GI sheet (0.90m x 0.8mm thick)in the horizontal poles and fixing 75mm dia. reflectorsincluding earth work excavation for fixing vertical postsand finally removing and stacking the materials safelyfor further use etc., complete and as directed by TWADBoard officers.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_694689.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .