Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ADMITEED |
| 2 | Accepted-Technical R O BOGDANG | Accepted-Technical ADMITEED |
| 3 | Accepted-Technical | Accepted-Technical ADMITEED |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹24.0 L
EMD Value
₹48,060
Closing Date
22 Jun 2026, 4:00 pmClosed
Executive Engineer PWD Rnb division Leh
Office of the Executive Engineer Rnb division Leh
Construction of Poultry farm at Changspa Leh ( Balance work )
2026_PWD_19015_1
E Tender 26 of R and B Division Leh
Open Tender
Civil Works - Others
Percentage
65 days
LEH
Please refer Tender documents.
10 documents required · 10 mandatory
₹240
Office of the Executive Engineer Rnb division Leh
₹48,060
29 Jun 2026
2 Jun 2026
24 Jun 2026
2 Jun 2026
22 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift upto 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.
All kinds of soil. | 57.04 | cum | 278.09 | ₹15,862.25 |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 5.84 | cum | 220.4 | ₹1,287.14 |
| - | Dumping stone including cost of stones in Horozontal on level. | 6 | cum | 953.02 | ₹5,718.12 |
| - | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded
stone aggregate 40 mm nominal size derived from natural sources) | 6 | cum | 5,725.33 | ₹34,351.98 |
| - | Random rubble masonry with hard stone in foundation and plinth including
levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded
stone aggregate 20 mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand) | 25.13 | cum | 5,730.38 | ₹1,44,004.45 |
| - | Random rubble masonry with hard stone laid dry in foundation, plinth &
wallsLaid with bond stone | 6.54 | cum | 4,062.25 | ₹26,567.12 |
| - | Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. above plinth level up to floor five level,
excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size) | 9.04 | cum | 11,102.31 | ₹1,00,364.88 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,175.44 | kg | 109.33 | ₹1,28,510.86 |
| - | Providing & fixing stabilized mud concrete solid blocks (adobe) with 3% cement,
masonry up to floor five level including hoisting and setting in position in cement
mortar 1:6 using approved quality mud with carriage of material complete. | 34.46 | cum | 7,021.21 | ₹2,41,950.9 |
| - | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate) finished
50 mm thick with 20 mm nominal size stone aggregate | 1 | sqm | 564.87 | ₹564.31 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_45365.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .