| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹16.9 Laccepted-aoc | accepted-aoc |
Tender Value
Refer Docs
EMD Value
₹42,300
Closing Date
18 Feb 2026, 9:30 pmClosed
Directorate of Municipal Administration
AEE VCC
Construction of box culvert and temporary storm water drain from Veer Savarkar Circle to Sardar Vallabhbhai Circle in Vijayapura City and installation of concrete pipes and murrum laying work (Flood Control Work) (General Fund)
DMA/2025-26/OW/WORK_INDENT53231
DMA/2025-26/OW/WORK_INDENT53231
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Vijayapura
5 documents required · 5 mandatory
₹500
₹42,300
18 Feb 2026
11 Feb 2026
17 Feb 2026
Construction of box culvert and temporary storm water drain from Veer Savarkar Circle to Sardar Vallabhbhai Circle in Vijayapura City and installation of concrete pipes and
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Dismantling of Cement Concrete Pavement - Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in volume and stoc...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED)
pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work ...
Providing, lowering, laying, jointing, testing and commissioning of Glazed Stone Ware Pipes of following dia, conforming to IS 651:1992, IS 4127 with latest amendments, including conveying to work s...
Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and ...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nomin...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work. Ref to MoRT&H : IRC - 301
Providing and laying 100mm thick pre-cast cover slabs over Road side drains / utility ducts / Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 55...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-1 53231.doc
Tender Document • 1.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .