| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | ₹6.6 L | L1 | Accepted-AOC low rate |
| 2 | L2₹6.9 LRejected-Finance | ₹6.9 L | L2 | Rejected-Finance above rate |
| Sl No | Description | Qty | Unit | A P CONSTRUCTIONS L1 | R SABEER ALI L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 27.4 | M3 | 237.5 ₹6,507.50 | 250 ₹6,850 |
| 2.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 6.85 | M3 | 5,536 ₹37,921.60 | 5,814 ₹39,825.90 |
| 3.00 | Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification For side wall | 60 | M2 | 541 ₹32,460 | 568 ₹34,080 |
| 4.00 | for culvert | 51.5 | M2 | 1,246.5 ₹64,194.75 | 1,309 ₹67,413.50 |
| 5.00 | Plain Cement Concrete 1:2:4 mix (One Cement, Two Fine Aggregate and Four Coarse Aggregate) Using 20mm ISS HBG Metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 44.5 | M3 | 6,595 ₹2.9 L | 6,925 ₹3.1 L |
| 6.00 | RCC 1:1 1/2:3 (One cement, one and half sand and Three aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification( TNBP No:30) | 13.25 | M3 | 9,280.5 ₹1.2 L | 9,745 ₹1.3 L |
| 7.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30 | 1,100 | Kgs | 89.88 ₹98,868 | 94 ₹1.0 L |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
13 Mar 2026, 3:00 pmClosed
E O
Pannaipuram Town Panchayat
Restrotion of of Culvert at Mallingeshwarar kovil road
2026_DTP_672691_1
135/2025
Open Tender
Civil Works
180 days
Pannaipuram Town Panchayat
As Per Tender Notice
3 documents required · 3 mandatory
₹0
₹8,000
Yes
8 May 2026
10 Mar 2026
13 Mar 2026
10 Mar 2026
13 Mar 2026
10 Mar 2026
10 Mar 2026 - 13 Mar 2026
Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification.
Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification For side wall
for culvert
Plain Cement Concrete 1:2:4 mix (One Cement, Two Fine Aggregate and Four Coarse Aggregate) Using 20mm ISS HBG Metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
RCC 1:1 1/2:3 (One cement, one and half sand and Three aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification( TNBP No:30)
Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30
Note: 1) The Rate Quoted are excluding the GST, 2) The above item 1 to 10 only taken for Price Bid Evaluation comparision
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.29 MB
BOQ_808436.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid