Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.9 LAccepted-AOC 159 NEW BASTI STATION ROAD MURSAN DISTRICT HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | 1 | Accepted-AOC L1 | |
| 2 | 2₹4.0 L+₹17,605.08 (4.56%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹4.2 L+₹32,419.10 (8.39%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹4.2 L+₹33,063.19 (8.56%)Rejected-AOC MAINPURI | UTTAR PRADESH | 205001 | 4 | Rejected-AOC L4 | |
| 5 | 5₹4.3 L+₹42,295.12 (11.0%)Rejected-AOC VILLAGE JAMRAHI POST AHIRWA DISTRICT MAINPURI UTTAR PRADESH | MAINPURI | MAINPURI | UTTAR PRADESH | 5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | DINESH CHANDRA L1 | M/s SAVITRI DEVI CONTRACTOR L6 | M/s Rakesh Kumar Thekedar L3 | Rajendra and Brothers L9 | M/s VINAY KUMAR CONTRACTOR L7 | kashmeera construction L8 | VINOD KUMAR CONTRACTOR AND SUPPLIER L4 | M/d VIPIN KUMAR L5 | DAKSHA CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Silt Clearence trench Diggining including lift up to 1.50 m & lead upto 6.0m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit taxes etc but excluding leveling dressing & compaction by Pocklin/equivalent capacity 60cum/hour ie 2280/60 (Rs. 2280 per hour), with Rough/Partial dressing (especially in case of drains) | 21,469.6 | cum | 17.99 ₹3,86,238.1 Lowest | 20.6 ₹4,42,273.76 | 19.5 ₹4,18,657.2 | 33.21 ₹7,13,005.42 | 21 ₹4,50,861.6 | 26.99 ₹5,79,464.5 | 19.53 ₹4,19,301.29 | 19.96 ₹4,28,533.22 | 18.81 ₹4,03,843.18 |
Tender Value
₹9.0 L
EMD Value
₹18,040
Closing Date
9 Feb 2026, 11:00 amClosed
Executive Engineer DD Etah
Office,Executive Engineer DD Etah
Silt Clearance of Panwah Drain From km. 0.000 to km 20.500
2026_UPIDC_1109765_2
02/EE/2025-26
Open Tender
Civil Works - Others
Item Rate
Etah
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹18,040
28 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
Silt Clearence trench Diggining including lift up to 1.50 m & lead upto 6.0m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit taxes etc but excluding leveling dressing & compaction by Pocklin/equivalent capacity 60cum/hour ie 2280/60 (Rs. 2280 per hour), with Rough/Partial dressing (especially in case of drains)
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
BOQ_2054339.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .