Tender Value
₹22 L
EMD Value
₹22,000
Closing Date
3 Nov 2023, 3:00 pmClosed
Block Development Officer (VP)
BDO Office, Mecheri Panchayat Union.
Salem District - Mecheri block - Construction of Compund Wall Cremation Shed approach and Borewell at Periya Sathapadi Burial Ground H/O Sathapadi in - Iyothee Thass Pandithar Habitation Development Scheme- 2023-24
2023_RDTN_382335_1
Roc.No.3744/2023/T1
Open Tender
Civil Works
Item Wise
120 days
BDO Office, Mecheri Panchayat Union.
As per tender Document
3 documents required · 3 mandatory
₹0
₹22,000
6 Nov 2023
26 Oct 2023
3 Nov 2023
26 Oct 2023
3 Nov 2023
26 Oct 2023
Amount
Construction Compound Wall Cremation Shed, , Approch road and Bore well at Periya Sathapadi for Burial Ground H/O Sathapadi
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Refilling the basement with excavated earth other than complying the Standard specification
Dry Brick work using country bricks 9"x4 1/2"x3" including cost and conveyance of all materials to site and all labour charges etc complete
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Below Basement
Above Basement
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Upto Basement
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Painting two coats with approved Emulsion over one coat of Priming coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B) ( NEW SURFACE)
Provision for for Chimney Cover Slab
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Below Basement
Above Basement
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Upto Basement
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Painting two coats with approved Emulsion over one coat of Priming coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B) ( NEW SURFACE)
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:3:6mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
below Basement
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
below Basement
Geophysical investigation charges including preparation of Geo Physical survey reports etc., completed.
Drilling of 150MM dia bore well in hard rock area including Cost and Conveyance
For the depth from 0 to 150M
For the depth from 150to155M
Cost & Supply of 150MM Cashing Pipe
Cost & Supply of 50x175 lpm x m -7. 5HP - Submirsible Pumpset
Cost & Supply of7.50 HP Submirsible Panel Board
50MM UPVC Pipe
4.00 Sq.MM. Cable
Erection Charges2.00HP Motor
Provision for Borewll Cover
supply and run of 2 of 4 sqmm (56/0.30) pvc insulated sc unsheated cu.conductor of 1100v 7/20 gi bearer wire Service wire SD 64
Cost & Supply of MS Kiosk
Construction of MS Kisok Pedestal
Earthwork excavation in other than loose soil for laying of following size of PVC pipes
Supply & delivery of PVC / GI pipes as per BIS Standards 63 MM OD6 KSC PVC Pipe
Labour Charges for laying and jointing of PVC Pipes and specials as per IS Standard
Refilling the excaveted earth as per the standard specification 63MM PVC PIPE
Provision for EB Deposit
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
YOGAM AND CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .