| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.6 LAccepted-AOC | ₹62.6 L Quoted ₹62.0 L | L1 | Accepted-AOC Financial bid accepted |
| 2 | L2₹64.8 LRejected-Finance | ₹64.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹71.8 LRejected-Finance | ₹71.8 L | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹92 L
EMD Value
₹6.6 L
Closing Date
15 Jan 2026, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Construction of the road from Bamhori Suhaghi to Majra Vijjan Khirak (opposite Sant Shiromani School)
2026_CEJNS_1104774_1
10268/ 44 C- Jhansi Circle/2025 Date 31.12.2025
Open Tender
Civil Works - Roads
180 days
Jhansi
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,870
₹6.6 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
16 Mar 2026
8 Jan 2026
15 Jan 2026
8 Jan 2026
15 Jan 2026
8 Jan 2026
9 Jan 2026
Construction of embankment with approved material obtained from local pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Construction of sub-grade and earthen shoulder with approved material obtained from local pits with all lifts and leads 2% slaked Lime including its mixing with rotavator complete two layers , spreading grading to required slope and compacted to meet requirement table 300.2 asper technical specification clause 303.1
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Close graded)
Providing, laying, spreading and compacting stone aggregates of specific sizes 45-63mm gauge to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.
Providing, laying, spreading and compacting stone aggregates of specific sizes 22.4-53mm gauge to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Providing and applying primer coat with bitumen emulsion SS-1 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502.
Providing and applying tack coat with Bitumen VG-10 using distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with air compressor as per Technical Specification Clause 503.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508.
Providing and laying seal coat by mechanical means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510.
Brick edging on bolh sides of the road of first class bricks 8 cm (3") wide and 12 cm. 4.5" deep laid with mud mortar lncluding labour and supply of bricks finished to required temptate and proper alignrnent and also including dressing and ramming the excavated earth as directed by Ensineerln-Charge (SI.No. 765)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Sand Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:3:6).
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.
Providing and laying reinforced cement concrete pipe NP-3 for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonary works in head walls and parapits clouse 1106. (350mmdia).
Providing and laying reinforced cement concrete pipe NP-3 for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonary works in head walls and parapits clouse 1106. (1000mm dia).
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
Providing concrete for plain /reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. Nominal mix (1:2:4).
Sign board, Kilometer stone and Hectometer stone
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.75% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (1.50% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2.25% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (3% Construction Cost)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_2038262.xls
BOQ • 0.29 MB
T2.pdf
Tender Documents • 1.10 MB
Download all tender documents and submit your bid