| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.8 LAccepted-AOC | ₹44.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹45.2 LRejected-Finance | ₹45.2 L | L2 | Rejected-Finance L2 |
| 3 | L3₹47.4 LRejected-Finance | ₹47.4 L | L3 | Rejected-Finance L3 |
| 4 | L4₹48.6 LRejected-Finance | ₹48.6 L | L4 | Rejected-Finance L4 |
| 5 | L5₹49.0 LRejected-Finance | ₹49.0 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | m/s. devendra kumar L1 | S R CONTRACTORS L5 | M/S MOHD ASLAM CONTRACTOR L7 | M/S MOHD. IDRIS CONTRACTOR L4 | M/S VASUDEV CONSTRUCTION L3 | M/S KUNJ BEHARI LAL CONTRACTOR L6 | KHAN TRADERS L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning of thick bushes and thorny jungle with proper disposal without uprooting. | 82.28 | %sqm | 330 ₹27,152.40 | 280 ₹23,038.40 | 380.56 ₹31,312.48 | 250 ₹20,570 | 100 ₹8,228 | 367.36 ₹30,226.05 | 332.2 ₹27,333.42 |
| 2.00 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-incharge up to a distance of 30M. | 906.43 | cum | 75 ₹67,982.25 | 65 ₹58,917.95 | 86.49 ₹78,397.13 | 80 ₹72,514.40 | 30 ₹27,192.90 | 83.49 ₹75,677.84 | 75.5 ₹68,435.46 |
| 3.00 | Providing and laying cement concrete A20M10 (1:3:6) with curing complete, including cost of all material, labour, T&P required for completion of work. | 87.82 | cum | 3,786.48 ₹3.3 L | 4,400 ₹3.9 L | 4,366.58 ₹3.8 L | 4,200 ₹3.7 L | 4,800 ₹4.2 L | 4,215.12 ₹3.7 L | 3,811.73 ₹3.3 L |
| 4.00 | Centering and shuttering for R.C.C./R.B. work including cost of centering and shuttering upto 3.0 M height. | 1,027.54 | sqm | 603 ₹6.2 L | 450 ₹4.6 L | 716.45 ₹7.4 L | 500 ₹5.1 L | 600 ₹6.2 L | 672.09 ₹6.9 L | 607.77 ₹6.2 L |
| 5.00 | Providing and laying RCC A20M-20 (1:1.5:3) with curing complete, including cost of all material, labour, T&P required for completion of work. | 113.51 | cum | 5,094.4 ₹5.8 L | 6,000 ₹6.8 L | 5,874.88 ₹6.7 L | 5,786 ₹6.6 L | 6,000 ₹6.8 L | 5,671.1 ₹6.4 L | 5,128.38 ₹5.8 L |
| 6.00 | Providing & Fixing Steel Reinforcement (Fe 500, TATA/SAIL/JINDAL etc) including cost of steel, bending, binding wire, welding, cutting, placing in position i/c all cost of material, labour, T&P etc. complete. | 7.44 | MT | 55,899 ₹4.2 L | 68,900 ₹5.1 L | 66,334.06 ₹4.9 L | 70,786 ₹5.3 L | 60,000 ₹4.5 L | 62,227.31 ₹4.6 L | 56,272.15 ₹4.2 L |
| 7.00 | First class (M-150) brick work with 1:4 cement mortar using cement and coarse sand including cost of all material, labour T&P etc. complete. | 321.51 | cum | 4,157 ₹13.4 L | 5,080 ₹16.3 L | 4,794.75 ₹15.4 L | 5,000 ₹16.1 L | 5,400 ₹17.4 L | 4,628.44 ₹14.9 L | 4,185.49 ₹13.5 L |
| 8.00 | 12 mm thick plaster with cement and sand in 1:4 over brick work including supply of all materials, labour, tools & plants etc. required for proper completion of the work. | 2,949.49 | sqm | 133 ₹3.9 L | 145 ₹4.3 L | 150.82 ₹4.4 L | 160 ₹4.7 L | 130 ₹3.8 L | 148.32 ₹4.4 L | 134.13 ₹4.0 L |
| 9.00 | Providing & Fixing Steel work in built up tubler( round, square or rectangular hollow tubes etc.) trusses etc. including all cost of material, cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, welding and bolting with special shaped washers etc. Complete of work. | 994.5 | Kg | 140 ₹1.4 L | 100 ₹99,450 | 159.1 ₹1.6 L | 120 ₹1.2 L | 100 ₹99,450 | 156.46 ₹1.6 L | 141.49 ₹1.4 L |
| 10.00 | Finishing wall with weather coat paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, T&P etc. complete. | 2,145.04 | sqm | 73 ₹1.6 L | 70 ₹1.5 L | 83.2 ₹1.8 L | 90 ₹1.9 L | 60 ₹1.3 L | 81.82 ₹1.8 L | 73.99 ₹1.6 L |
Updated dates
Tender Value
₹59.8 L
EMD Value
₹1.2 L
Closing Date
8 Jan 2026, 4:00 pmClosed
SE 1st IWC Meerut
SE Office 1st IWC Meerut
As per the NIT
2025_UPIDC_1101462_3
12/SE-1/2025-26
Open Tender
Civil Works
90 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.2 L
SE Office 1st IWC Meerut
19 Mar 2026
24 Dec 2025
8 Jan 2026
24 Dec 2025
8 Jan 2026
24 Dec 2025
26 Dec 2025
Cleaning of thick bushes and thorny jungle with proper disposal without uprooting.
Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-incharge up to a distance of 30M.
Providing and laying cement concrete A20M10 (1:3:6) with curing complete, including cost of all material, labour, T&P required for completion of work.
Centering and shuttering for R.C.C./R.B. work including cost of centering and shuttering upto 3.0 M height.
Providing and laying RCC A20M-20 (1:1.5:3) with curing complete, including cost of all material, labour, T&P required for completion of work.
Providing & Fixing Steel Reinforcement (Fe 500, TATA/SAIL/JINDAL etc) including cost of steel, bending, binding wire, welding, cutting, placing in position i/c all cost of material, labour, T&P etc. complete.
First class (M-150) brick work with 1:4 cement mortar using cement and coarse sand including cost of all material, labour T&P etc. complete.
12 mm thick plaster with cement and sand in 1:4 over brick work including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
Providing & Fixing Steel work in built up tubler( round, square or rectangular hollow tubes etc.) trusses etc. including all cost of material, cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, welding and bolting with special shaped washers etc. Complete of work.
Finishing wall with weather coat paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, T&P etc. complete.
Providing and applying two coat of approved enamel paint including cost of material, labour, T&P etc. required for proper completion of work.
Earth work in embankment by power transported earth with a lead beyond 200m. and upto 1.00 km. i/c. excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty.
Note : The Quantities written above may increase or decrease as per requirement & site condition
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.86 MB
TDUPLOAD.pdf
Tender Documents • 6.41 MB
BOQ_2030215.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid