| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC won in transparent lottery |
| 2 | L1₹2.4 CrRejected-Finance | ₹2.4 Cr | L1 | Rejected-Finance lose in transparent lottery |
| 3 | L1₹2.4 CrRejected-Finance GUDVELA | ₹2.4 Cr | L1 | Rejected-Finance lose in transparent lottery |
| 4 | L1₹2.4 CrRejected-Finance AGALPUR BLOCK IN THE DISTRICT OF BALANGIR | ₹2.4 Cr | L1 | Rejected-Finance lose in transparent lottery |
| 5 | L1₹2.4 CrRejected-Finance AT TULUSINAGAR PO PS BALANGIRI DIST BALANGIRI PIN 767001 | BALANGIR | ODISHA | 767001 | ₹2.4 Cr | L1 | Rejected-Finance lose in transparent lottery |
Tender Value
₹2.4 Cr
EMD Value
₹2.4 L
Closing Date
29 May 2026, 5:30 pmClosed
Chief Construction Engineer
Office of the CCE, LSP, Laltikra, Balangir.
Construction of cement concrete precast interlocking paver block road and cement concrete drain for main road and branch road at RR Colony of LSIP at Uchhabahal , Balangir
2026_CEEBO_129219_3
03/2026-27 of CCE LSP Balangir
Open Tender
Civil Works - Roads
Percentage
213 days
Uchhabahal
Tender Cost, EMD, PAN, Valid RC, Valid GSTIN, Affidavit, No Relation Certificate, undertakings and any other document as per DTCN.
3 documents required · 3 mandatory
₹10,000
₹2.4 L
Yes
Office of the CCE, LSP, Laltikra, Balangir.
9 Jul 2026
15 May 2026
30 May 2026
15 May 2026
29 May 2026
15 May 2026
15 May 2026 - 22 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in hard or gravelly soil, stiff black cotton soil & stoney earth mixed with boulder including dressing, levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, delifts, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 1,282.71 | Cum | 276.9 | ₹3,55,182.4 |
| 2 | Filling foundation, plinth and below interlocking paverblock with sand of approved quality,watered and rammed including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 929.56 | cum | 837.4 | ₹7,78,413.54 |
| 3 | Providing, laying, spreading and compacting grade II stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density as per Technical Specification Clause 405, cost & conveyance of all materials, royalty of all material, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 439.39 | cum | 3,082.51 | ₹13,54,424.07 |
| 4 | Providing, laying, spreading and compacting grade III stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density as per Technical Specification Clause 405, cost & conveyance of all materials, fitting and fixing of materials, royalty of all materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 439.39 | cum | 3,174.8 | ₹13,94,975.37 |
| 5 | Supplying and fixing of 80 mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by block making machine with propoer compaction and laid in required pattern as per drawing and technical specification confirming to IRC SP-63:2018 including cost & conveyance of all materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 5,858.49 | sqm | 608.4 | ₹35,64,305.32 |
| 6 | Plain Cement Concrete M15 grade with 40 mm & downgraded size black hard granite crusher broken aggregates free from weathered skin surface, dust and any other deleterious materials including machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries, cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 213.79 | cum | 5,185.7 | ₹11,08,650.8 |
| 7 | Reinforced Cement Concrete M20 grade with 20 mm & downgraded size black hard granite crusher broken aggregates free from weathered skin surface, dust and any other deleterious materials including machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries, cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 1,179.8 | Cum | 5,909.4 | ₹69,71,910.12 |
| 8 | Supply, fitting, fixing, straightening, bending, binding and placing in position of uncoated HYSD bar reinforcement complete including cost & conveyance of all materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 707.88 | qntl | 8,651.4 | ₹61,24,153.03 |
| 9 | Rigid smooth centering and shuttering for R.C.C works including false works and dismentalling there after casting including cost & conveyance of all materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 7,243.65 | sqm | 249.1 | ₹18,04,393.21 |
| 10 | Back filling of excavated earth earth including watering ramming, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 427.57 | Cum | 184.6 | ₹78,929.42 |
stage.html
html • 0.41 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
UchhabahalDTCN.pdf
Tender Documents • 2.00 MB
BOQ_591037.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .