Tender Value
₹38.8 L
EMD Value
₹77,500
Closing Date
21 Jun 2021, 2:00 pmClosed
Executive Engineer, O M Kathua
office of the Executive Engineer,O M, Kathua
Shifting of Electrical Utilities coming under the widening of OSK Road on Turnkey basis falling under the jurisdiction of O M Division, Kathua(JPDCL)
2021_PDD_125242_1
KED/08 of 2021-22 Dt.25.05.2021
Open Tender
Electrical Works
Turn-key
60 days
Kathua
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Executive Engineer, O and M Kathua
₹77,500
9 Jul 2021
25 May 2021
22 Jun 2021
25 May 2021
21 Jun 2021
25 May 2021
25 May 2021 - 1 Jun 2021
Amount
Shifting of 02Nos. 25KVA Sub Stations at Sherpur (BSNL) and Padyari Near Brick Kiln(BSNL) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
11 kV Horn Gap Fuse Set 3 Phase 200A
25mm² Single Core Cable,1.1K V Grade, PVC Insulated Stranded Conductor FRLS type
9 Mtr. Long (PCC WL 300Kg)
8 Mtr. Long (PCC WL 200Kg)
11kV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
GI Channel/Angle/Flat of sizes including clamps(Sizes and quantity as per Drawing No.F-2 of REC Construction Standards)
Galvinized Nuts and Bolts.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Bus Bar Insulators
Aluminium Flat
ACSR Weasel Conductor
Shifting Charges of Old Transformer(02Nos.) on new structure including dismantling and carriage of respective dismantled material to Divisional Stores at Kathua(Complete Job) Note: List Of Material to be dismantled is attached as Section-XI of SBD
Shifting of 05Nos. 100KVA Sub Stations at OHT Padyari, GuruNala, Badala, Saktachak and Maichak on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
11 kV Horn Gap Fuse Set 3 Phase 200A
70mm² Single Core Cable,1.1K V Grade, PVC Insulated Stranded Conductor FRLS type
9 Mtr. Long (PCC WL 300Kg)
8 Mtr. Long (PCC WL 200Kg)
11kV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
GI Channel/Angle/Flat of sizes including clamps(Sizes and quantity as per Drawing No.F-2 of REC Construction Standards)
Galvinized Nuts and Bolts.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Bus Bar Insulators
Aluminium Flat
ACSR Weasel Conductor
Shifting Charges of Old Transformer(05Nos.) on new structure including dismantling and carriage of respective dismantled material to Divisional Stores at Kathua.(Complete Job) Note: List Of Material to be dismantled is attached as Section-XI of SBD
Shifting of LT Line 3P4W at i.OHT Padyari to Padyari panchyat Ghar (1.0 Km) ii.Panchayat ghar to sheller Morh (0.4 Km) iii.Sherpur (0.4 Km) iv.Near Maichak & Saktachak (0.6 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
8.0 Mtr PCC Pole(WL 200Kg)
GI U Clamp for Shackle Insulators
30 mm² ACSR Weasel Conductor
16kN Polymer Shackle Insulators
Galvanized Nuts and Bolts.
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Dismantling and carriage of respective dismantled material from above locations to Divisional Stores at Kathua (Complete Job) Note: List Of Material to be dismantled is attached as Section-XI of SBD
Erection of new LT line 3p4w for removal of Road crossing at i.Near Brick kiln Padyari (0.12 Km) ii.Near petrol pump ShellerMorh (0.2 Km) iii.Jakhbar Morh (0.2 Km) iv.Near sherpur (0.3 Km) v. Village Sherpur (0.4 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
8.0 Mtr PCC Pole(WL 200Kg)
GI U Clamp for Shackle Insulators
30 mm² ACSR Weasel Conductor
16kN Polymer Shackle Insulators
Galvanized Nuts and Bolts.
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Shifting of HT line on ACSR Rabbit Conductor From NH-44 to Mai chak ( Industry Saktachak B feeder) (1.5Kms) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9.0Mtr PCC Poles(WL-300Kgs)
GI V Cross Arms with Top Bracket including Clamps
GI Channel X-arm including Clamps and Braces
50 mm² ACSR Rabbit Conductor
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
11kV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Guard Netting
Earthing Complete by GI Pipe 40mm or GI Rod 20mm 2.5 Mtr Long Through GI strip
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Dismantling and carriage of respective dismantled material from above locations to Divisional Stores at Kathua (Complete Job) Note: List Of Material to be dismantled is attached as Section-XI of SBD
Shifting of HT line on ACSR Weasel Conductor From NH-44 to TK paper Mill (Barnoti local Feeder) (0.6Kms) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9.0Mtr PCC Poles(WL-300Kgs)
GI V Cross Arms with Top Bracket including Clamps
GI Channel X-arm including Clamps and Braces
30 mm² ACSR Weasel Conductor
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
11kV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Guard Netting
Earthing Complete by GI Pipe 40mm or GI Rod 20mm 2.5 Mtr Long Through GI strip
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Dismantling and carriage of respective dismantled material from above locations to Divisional Stores at Kathua (Complete Job) Note: List Of Material to be dismantled is attached as Section-XI of SBD
Erection of HT line on ACSR Weasel Conductor From TK paper Mill to Mai Chak( Barnoti Local Feeder) (0.5Kms) for removal of HT Crossings on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9.0Mtr PCC Poles(WL-300Kgs)
GI V Cross Arms with Top Bracket including Clamps
GI Channel X-arm including Clamps and Braces
30 mm² ACSR Weasel Conductor
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
11kV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Guard Netting
Earthing Complete by GI Pipe 40mm or GI Rod 20mm 2.5 Mtr Long Through GI strip
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Dismantling and carriage of respective dismantled material from above locations to Divisional Stores at Kathua (Complete Job) Note: List Of Material to be dismantled is attached as Section-XI of SBD
Erection of road crossing for HT line at i.Saktachak (2 No.) ii.Near Maruti Suzuki agency (1 No.) iii.Near Maichak ( 1 No.) iv.Near BSNL s/stn Sherpur (1 No.) v.Bagachak (1No.) vi. Near Sherpur (1No.) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
11.0Mtr PCC Poles(WL-360Kgs)
50 mm² ACSR Rabbit Conductor
GI Channel X-arm including Clamps and Braces
11kV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Danger Plates with clamps
Anti Climbing Devices
Guard Netting
Galvanized Nuts and Bolts
Earthing Complete by GI Pipe 40mm or GI Rod 20mm 2.5 Mtr Long Through GI strip
Erection of road crossing for LT line at i.Saktachak (1No.) ii.Maichak (1 No.) iii. Sherpur (1No.) iv. Near 66KV line crossing (1 No.) v.Near Petrol Pump (1 No.) vi.Near Sheller Morh (1No.) vii.Near Jakhbar (1No.) viii.Near BSNL Sherpur (1No.) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9.0 Mtr PCC Pole(WL 300Kg)
GI U Clamp for Shackle Insulators
16kN Polymer Shackle Insulators
50 mm² ACSR Rabbit Conductor
Danger Plates with clamps
Anti Climbing Devices
Earthing Complete by GI Pipe 40mm or GI Rod 20mm 2.5 Mtr Long Through GI strip
Galvanized Nuts and Bolts
Shifting of HT line on bare conductor along with LT 3p4w(Near Sherpur) (0.3Kms) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9.0 Mtr PCC Pole(WL 300Kg)
30 mm² ACSR Weasel Conductor
GI Channel X-arm including Clamps and Braces
GI U Clamp for Shackle Insulators
16kN Polymer Shackle Insulators
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Danger Plates with clamps
Anti Climbing Devices
Earthing Complete by GI Pipe 40mm or GI Rod 20mm 2.5 Mtr Long Through GI strip
Dismantling and carriage of respective dismantled material from above locations to Divisional Stores at Kathua (Complete Job) Note: List Of Material to be dismantled is attached as Section-XI of SBD
Shifting of HT line( on cable) along with LT 3p4w from Panchyat Ghar to Brick Kiln Padyari (0.3Kms) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9.0 Mtr ST Pole(410-SP-33)
9.0 Mtr PCC Pole(WL 300Kg)
30 mm² ACSR Weasel Conductor
GI Channel X-arm including Clamps and Braces
GI U Clamp for Shackle Insulators
16kN Polymer Shackle Insulators
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Danger Plates with clamps
Anti Climbing Devices
Earthing Complete by GI Pipe 40mm or GI Rod 20mm 2.5 Mtr Long Through GI strip
Dismantling and carriage of respective dismantled material from above locations to Divisional Stores at Kathua (Complete Job) Note: List Of Material to be dismantled is attached as Section-XI of SBD
M/S BETTER CHOICE AGENCIES
JAI VIJAY INFRASTRUCTURE COMPANY
SUMIT SHARMA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .