| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹4.2 L−₹58,040 (12.3%)Accepted-Finance | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | SUGANYA ENTERPRISES L1 | SUBBAN ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Scrapping the old RCC wall/ slab thoroughly by hard wire brush and cleaning for applying protective epoxite treatment including cost of wire brush, labour, scaffolding, etc., complete. | 326 | M2 | 4,890 ₹5,770.2 Lowest | 5,868 ₹6,924.24 |
| 2.00 | Providing scaffolding from the top of C.W. forebay and hanging. Scaffolding using 10cm to 13cm dia casurina posts the distance between two rows being 1m Horizontally with cross bracing of 3.2m length and providing platform as required with wooden planks 40mm thick for required spacing and width using coir and nails with all labour charges, consumables, etc., complete. | 172 | M2 | 34,400 ₹40,592 Lowest | 51,600 ₹60,888 |
| 3.00 | Dismantling of RCC and cleaning 1Km away from the site including cost of all labour, lead, lift, T&P, etc., complete. | 1.22 | M3 | 6,710 ₹7,917.8 Lowest | 7,320 ₹8,637.6 |
| 4.00 | Providing RCC 1:1½:3 using OP / PP cement with 6mm chips metal (machine crushed) including cost of all materials, labour, lead, lift, etc., complete. | 1.22 | M3 | 14,640 ₹17,275.2 Lowest | 15,860 ₹18,714.8 |
| 5.00 | Painting one coat of Nitozinc primer (or) equivalent mixed with hardner in the ratio 3:1 after thorough cleaning the rust in the steel plate including cost of all materials, lead, lift, etc., complete. | 0.8 | M2 | 200 ₹236 Lowest | 240 ₹283.2 |
| 6.00 | Providing 10mm thick epoxy screeding using quartz sand and epoxy components of Hindustan ciba geigy/ roto polymer/ cerachem/ fosroc or equivalent make beneath the screeding as directed by the engineer in charge at site including cost of all materials, labours, leads, lifts, scaffolding charges, lighting arrangements, safety appliances etc., complete. | 13.2 | M2 | 31,680 ₹37,382.4 Lowest | 33,000 ₹38,940 |
| 7.00 | Providing two coats of epoxite epoxy seal coat over the screeding surface and wall surface using epoxy compounds of Hindustan ciba geigy/ roto polymer/ cerachem/ fosroc (or) equivalent make as directed by the Engineer in charge at site including cost of all materials, labours, leads, lifts, etc., complete. | 330 | M2 | 2,97,000 ₹3,50,460 Lowest | 3,30,000 ₹3,89,400 |
| 8.00 | Supplying cutting, bending & tying in position secondary reinforcement wherever necessary using GI weld meh of size 75 x 50 mm 10 gauge to existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of materials, labours, lead, lift etc, complete. | 24.48 | M2 | 15,912 ₹18,776.16 Lowest | 17,136 ₹20,220.48 |
| 9.00 | Special Plastering in CM 1:3 10 mm thk. For reinforced items including cost of all materials, labours, lead, lift, curing etc., complete. | 24.48 | M2 | 9,792 ₹11,554.56 Lowest | 12,240 ₹14,443.2 |
Tender Value
Refer Docs
EMD Value
₹3,800
Closing Date
5 Oct 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Providing protective treatment for the RCC structures at 0 mtrs. bottom level in 3 A and B Forebay of CWPH 1
2026_EB_706875_1
CE SE C TTPS Spec.No. 94 26 27
Open Tender
Civil Works - Others
Item Rate
30 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,800
Yes
7 Oct 2026
22 Sept 2026
6 Oct 2026
22 Sept 2026
5 Oct 2026
22 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scrapping the old RCC wall/ slab thoroughly by hard wire brush and cleaning for applying protective epoxite treatment including cost of wire brush, labour, scaffolding, etc., complete. | 326 | M2 | 78.6 | ₹25,623.6 |
| 2 | Providing scaffolding from the top of C.W. forebay and hanging. Scaffolding using 10cm to 13cm dia casurina posts the distance between two rows being 1m Horizontally with cross bracing of 3.2m length and providing platform as required with wooden planks 40mm thick for required spacing and width using coir and nails with all labour charges, consumables, etc., complete. | 172 | M2 | 38.5 | ₹6,622 |
| 3 | Dismantling of RCC and cleaning 1Km away from the site including cost of all labour, lead, lift, T&P, etc., complete. | 1.22 | M3 | 5,155.5 | ₹6,289.71 |
| 4 | Providing RCC 1:1½:3 using OP / PP cement with 6mm chips metal (machine crushed) including cost of all materials, labour, lead, lift, etc., complete. | 1.22 | M3 | 470.9 | ₹574.5 |
| 5 | Painting one coat of Nitozinc primer (or) equivalent mixed with hardner in the ratio 3:1 after thorough cleaning the rust in the steel plate including cost of all materials, lead, lift, etc., complete. | 0.8 | M2 | 9,007.3 | ₹7,205.84 |
| 6 | Providing 10mm thick epoxy screeding using quartz sand and epoxy components of Hindustan ciba geigy/ roto polymer/ cerachem/ fosroc or equivalent make beneath the screeding as directed by the engineer in charge at site including cost of all materials, labours, leads, lifts, scaffolding charges, lighting arrangements, safety appliances etc., complete. | 13.2 | M2 | 90.5 | ₹1,194.6 |
| 7 | Providing two coats of epoxite epoxy seal coat over the screeding surface and wall surface using epoxy compounds of Hindustan ciba geigy/ roto polymer/ cerachem/ fosroc (or) equivalent make as directed by the Engineer in charge at site including cost of all materials, labours, leads, lifts, etc., complete. | 330 | M2 | 5,533.1 | ₹18,25,923 |
| 8 | Supplying cutting, bending & tying in position secondary reinforcement wherever necessary using GI weld meh of size 75 x 50 mm 10 gauge to existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of materials, labours, lead, lift etc, complete. | 24.48 | M2 | 284.1 | ₹6,954.77 |
| 9 | Special Plastering in CM 1:3 10 mm thk. For reinforced items including cost of all materials, labours, lead, lift, curing etc., complete. | 24.48 | M2 | 277 | ₹6,780.96 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_849550.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .