Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.4 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹17.2 L+₹73,797.20 (4.49%)Rejected-Finance | 2 | Rejected-Finance L2 Quoted |
Tender Value
Refer Docs
EMD Value
₹16,700
Closing Date
27 Mar 2026, 2:00 pmClosed
SE/CEDC/South-I
SE/CEDC/S-I, K.K.Nagar
et 53
2026_EB_673366_3
ET-53
Limited
Civil Works
Works
K.K.Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,700
16 Sept 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
27 Mar 2026
24 Mar 2026
Labour charges for chipping the spalled concrete of the beams,columns,ceiling removing loosely adhering particles using wire brush,cleaning the reinforcement and apply rust converter including cost of all materials labour lead lift etc. complete.
Drilling holes in RCC slab/beam. column for anchoring 8 to 16 mm dia TMT bar to the required depth (min 50mm) & cleaning the holes with water, mixing the base and hardener of epoxy resin lock fix range & placing the reinforcement to the holes & plug with same including cost of all materials labour lead lift etc. complete.
Supplying and providing reinforcement in TMT/MS bar for columns/beam/slab including cost of materials cutting bending welding in position as directed by the Engineers at site etc. complete
Providing micro-concrete by using RENDROC-RG of 25 mm to 75mm with a slurry tight form work. Initially the area of reinforcement are to be treated with NITOZINC primer @ 1 litre.4.50 m2 and over that apply NITOBOND-EP @ 1litre /2m2 to the whole area. For the thickness above 25mm and 6-10mm graded HBUS jelly in ratio 1;0.75 (Rendroc-RG: HBUS jelly) along with micro concrete. For curing purpose add curing compound CONCURE-WB @1litre/4m2.Finally after desuttering apply two coats of DEK GUARD-S @ 3 m2/litre/coat over one coat of DEKGUARD primer @ 2.5m2/litre for protection and decorative finish coat. The rate inclusive cost of all materials labour lead lift labour transport etc. complete.
For thickness above 50 mm & up to 75 mm with column
Applying modified mortar in cm 1;3 to the damaged slab/beam to a thickness from 20 mm and up to 50 mm thick mixed with SBR LATEX or equivalent @ 1 litre/4.50m2 and concure WB @ 1 litre/4m2 after applying NITOBOND-EP @ 1 litre/2m2 area with chicken mesh as directed by Engineers at site including cost of all materials labour lead lift etc complete.
Thickness above 20 mm & up to 50 mm beam area
Plastering with cm 1;3 20mm thick mixed with conplast X 421 1 C @ 150 ml/bag of cement including cost of all materials labour lead lift etc. complete.
White washing three coats with freshly burnt shell lime at all levels in all floors, including cost of all materials, leads, lifts, labour, scaffolding, brush, curing etc. complete as per standard specification and as directed.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Painting the walls with TWO coats of first quality plastic emulsion paint of approved colour over a primer coat includiing through scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specificaion and as directed by the Department officer.
Labour charges for chipping the spalled concrete of the beams,columns,ceiling removing loosely adhering particles using wire brush,cleaning the reinforcement and apply rust converter including cost of all materials labour lead lift etc. complete.
Drilling holes in RCC slab/beam. column for anchoring 8 to 16 mm dia TMT bar to the required depth (min 50mm) & cleaning the holes with water, mixing the base and hardener of epoxy resin lock fix range & placing the reinforcement to the holes & plug with same including cost of all materials labour lead lift etc. complete.
Supplying and providing reinforcement in TMT/MS bar for columns/beam/slab including cost of materials cutting bending welding in position as directed by the Engineers at site etc. complete
Providing micro-concrete by using RENDROC-RG of 25 mm to 75mm with a slurry tight form work. Initially the area of reinforcement are to be treated with NITOZINC primer @ 1 litre.4.50 m2 and over that apply NITOBOND-EP @ 1litre /2m2 to the whole area. For the thickness above 25mm and 6-10mm graded HBUS jelly in ratio 1;0.75 (Rendroc-RG: HBUS jelly) along with micro concrete. For curing purpose add curing compound CONCURE-WB @1litre/4m2.Finally after desuttering apply two coats of DEK GUARD-S @ 3 m2/litre/coat over one coat of DEKGUARD primer @ 2.5m2/litre for protection and decorative finish coat. The rate inclusive cost of all materials labour lead lift labour transport etc. complete.
For thickness above 50 mm & up to 75 mm with column
Applying modified mortar in cm 1;3 to the damaged slab/beam to a thickness from 20 mm and up to 50 mm thick mixed with SBR LATEX or equivalent @ 1 litre/4.50m2 and concure WB @ 1 litre/4m2 after applying NITOBOND-EP @ 1 litre/2m2 area with chicken mesh as directed by Engineers at site including cost of all materials labour lead lift etc complete.
Thickness above 20 mm & up to 50 mm beam area
Plastering with cm 1;3 20mm thick mixed with conplast X 421 1 C @ 150 ml/bag of cement including cost of all materials labour lead lift etc. complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Dismantling of damaged sunshade in central office building and clearing away from site to a distance of 20kms , including cost of labour, lead, lift, all T&P's, Transport, etc., complete and as directed by the Engineer at site.
Removing and re fixing the water and sewer line after attended the repair work in wall the rate including cost of all materials lead lift labour etc complete
water line
sewer line
chipping the damaged damaged plastered area in central office building and clearing away from site to a distance of 20kms , including cost of labour, lead, lift, all T&P's, Transport, etc., complete and as directed by the Engineer at site.
Plastering with cm 1;3 20mm thick mixed with conplast X 421 1 C @ 150 ml/bag of cement including cost of all materials such as weld mesh and cleaning with rust cleaner labour lead lift etc. complete.
Supplying fixing of structural steel/hollow sections as directed by engineers at site for roof truss works including cost of all materials labour, lead, painting, lift etc.,complete.
Painting the walls with TWO coats of first quality plastic emulsion paint of approved colour over a primer coat includiing through scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specificaion and as directed by the Department officer.
GST for bidders within TamilNadu
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Schedule-53.xls
Additional Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .