| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.6 LAccepted-AOC 11 82 GROUND FLOOR BLOCK 11 KALYANPURI EAST DELHI DELHI 110091 | EAST DELHI | DELHI | 110091 | ₹32.6 L Quoted ₹33.3 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹37.1 L+₹3.8 L (11.6%)Rejected-Finance | ₹37.1 L+₹3.8 L (11.6%) | L2 | Rejected-Finance HIGHER BIDDER |
| 3 | L3₹39.1 L+₹5.9 L (17.6%)Rejected-Finance S NO 279 1 1A PLOT NO 113 KUTWAL COLONY SASTHE WASTI LOHEGAON PUNE 411 047 | PUNE | MAHARASHTRA | 411047 | ₹39.1 L+₹5.9 L (17.6%) | L3 | Rejected-Finance HIGHER BIDDER |
| 4 | L4₹39.4 L+₹6.1 L (18.4%)Rejected-Finance | ₹39.4 L+₹6.1 L (18.4%) | L4 | Rejected-Finance HIGHER BIDDER |
| 5 | L5₹41.4 L+₹8.1 L (24.4%)Rejected-Finance | ₹41.4 L+₹8.1 L (24.4%) | L5 | Rejected-Finance HIGHER BIDDER |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
7 Oct 2022, 6:00 pmClosed
SHRI BIJENDRA SHARMA IDSE EE
GARRISON ENGINEER (NW) VASCO Opposite KV No.2, School, Shantinagar, Vasco-Da-Gama, Goa-403802
8473/22/E8
2022_MES_550473_1
8473/22/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
VASCO
Class D Category b ii
9 documents required · 9 mandatory
₹500
Yes
GE NW VASCO
₹90,000
Yes
17 Nov 2022
7 Sept 2022
10 Oct 2022
7 Sept 2022
7 Oct 2022
20 Sept 2022
8 Sept 2022 - 20 Sept 2022
Amount
Material and Labour for filteration and dehydration of transformer oil by dehydration machine to achieve the die-electric strength/ insulation value upto 65 KV/40KV (RMS) at standard gap of electrodes 2.5 mm for one minute in various capacity of transformers 33/11KV and 11/0.433KV including insulation testing of oil with help of suitable equipments before and after dehydration including BDV Test compete all as specified and directed.
Note:- (i) Contractor will have to arrange the dehydration machine and transformer oil dielectric strength testing equipment as mentioned and same shall be deemed to be included in the item rate quoted. (ii) Test result of transformer oil before and after dehydartion is required to submit by contractor duly signed by all concerned. (iii) The contractor shall ensure that the conservator tanks are full to its level before commencement of dehydration process. (iv) Additional quantity of transformer oil if any required for making the oil level upto the requirement in transformer shall be measured and paid separately as supply and filling but its cost of heating shall be deemed to be included in the rate quoted for above item.
Material and Labour for EHV grade insulating tranformer oil and all as specified and directed by Engr-in-Charge. Make: Power oil or equivalent
Material and Labour for testing and calibration of 11KV VCBs indoor/ outdoor type alongwith control panel and control wiring, protection system and relays system (relay to tripping coil auxiliary switch male and female housing cut outs etc) , checking of quality of vacuum interrupter, insulation resistances, static contact resistance, Testing ( IR value, Ratio test, Polarity test) and connection verification of 11 KV Current transformer( Set of three) by PRIMARY INJECTION KIT ,and Testing and calibration of relay( set of two Over current and one earth fault) by SECONDARY INJECTION KIT including all other functional tests of the VCB, C&R panel and CTs, PTs. complete all as specefied and directed.
Disconnecting, opening of VCB of any description and any make of rating 11 KV 400/800 Amps capacity for servicing / overhauling, taking out and removing unserviceable / defective parts including cleaning & servicing, greasing, oiling of the parts etc and replacement of unserviceable parts with new one, reassembling the VCB after overhauling/ servicing and its testing complete all a specified and directed. Note: (i) Replacement of unserviceable parts shall be measured and paid for separately under appropriate item of Sch 'A' as supply only but fixing charges of the parts replaced /repaired is deemed to be included in these item. (ii) Servicing shall be got carried out by the authorised rep of the VCB manufacturer and the service engineer will submit a service report for each VCB. (iii) Any item not included in CA and required for successful operation of the panel will be provided by the contractor & same shall deemed to be included rate quoted.
Supply only following items/spare parts suitable for 11KV VCB, 400/800 Amps capacity of any make dismantled / fixed under Sch 'A' item No: 04 here-in-before complete all as specified and directed.
vacuum circuit breaker main mechanism assembly complete with all accessories all as specified and directed by Engr-in-Charge
Vacuum Interrupter type WL-33379 suitable for 11 KV VCB Panel complete all as specefied and directed.
Isolating contact assembly 400/800 Amps suitable for 11 KV VCB Panel complete all as specefied and directed.
Tripping Coil assembly 30 Volts DC suitable for 11 KV VCB Panel complete all as specefied and directed.
Close Coil Coil assembly 30 Volts DC suitable for 11 KV VCB Panel complete all as specefied and directed.
Motor & Gear assembly 110V AC and 220 AC for 11 KV VCB Panel complete all as specefied and directed.
TNC switch for 11 KV VCB Panel complete all as specefied and directed.
Indication lamp LED type suitable for 230 Volts AC 50Hz and 110/30 Volts DC supply.
Supply install ,testing and commissioning of Micro processor base relay (02 O/C + 01 EF) for 11 KV VCB panel , rating 5 Amps, Auxiliary supply 20-110 Volt DC complete all as specified and directed. Note:- (i) Necessary addition/ alteration to existing VCB front panel such as cutting/welding of front size of panel board/position if required including necessary modification of wiring shall be carried out at site by the contractor without any extra cost. (ii) The digital relay shall have following protections (a) Phase over current protection (b) earth fault protection (d) Over voltage (e) Breaker failure indication (f) Auxiliary power supply 24-110 V DC
Disconnecting and taking down unserviceable current transformer of any description and in any position and supply, installation, commisioning and testing of cast resin type 11KV current transformer having ratio 100+50/5+5A as per IS: 2705 having protection core class 5P10, burden of 15VA and metering core class CL1.0 and burden of 15VA, breaking capacity of 13.1 KV for 1.0 second all as specified and directed. Make: CG/Kappa/Jyoti/Alstom
Disconnecting and taking down unserviceable voltage transformer of any description and in any position and supply, installation, commisioning and testing for 11KV single phase indoor oil cooled PT of ratio 11KV/RT 3/10V/RT 3/110/RT 3 class 0.5-3, burden 100VA, insulation level 35/75 KV, voltage factor 1.2 cont and 1.9 for 30 sec, conforming to IS-3156 complete all as specified and directed. Make: CG/Kappa/Jyoti/Alstom
Supply install, testing and commissioning of Power pack unit input voltage 180-250 Voltage and out put voltage 24 Volt DC having 4-digit degital Volt & Ampere meter, High resolution D/A, A/D converter, Digital interface as standard function etc. complete all as specified and as directed including taking out US battery bank unit.
Excavation in trenches n.exc 1.5M wide & n.exc 1.5m in depth for laying & removing of cable any sizes and getting out in hard/dense soil all as specified.
All as per Item No.18.00 above but in soft disintegreted rock/ laterite rock
Returning filling in excavated earth work including spreading, levelling, watering and well ramming in layers n.exc 25cm thick in any strata
Removing excavated soil to a distance n.exc 50m, depositing where directed at a level n.exc 1.5M above the starting point
Supply/ Lay dry river sand /m -sand in trenches for cable protection all as directed. Note : Punned thickness only will be measured & Paid
Supply and lay un-reinforced precast concrete cable covers, class HV , type- I with peak, size 300mm x 180mm x 40mm, all as specified and directed.
Supply and Fixing in trench/on wall in repairs GI tubing light grade 100 mm dia for road crossing and cable protection of the following sizes as in repairs :-
Material and Labour for PCC 1:4:8 type D-2 using 40 mm graded stone aggregate including use and waste of form work of concrete for pole and stay foundation.
Material and Labour for PCC 1:3:6 type C-1 using 20 mm graded stone aggregate including use and waste of form work for pole coping/ any description all as directed.
Material and Labour for Electric yard gravelling of 15.0 cm (llose thickness) by broken stone of 40 mm size in and around two pole/ four pole structure/ substation complete all as specified and directed.
Supply & Lay , testing and commissioning XLPE cable , PVC insulated, screened PVC bedded galvanised steel strip or wire armoured electric power cable, heavy duty with aluminium conductor 11000 Volts grade (earthed), 3 core 120 sqmm laid in trenches / floor / duct / fixed on poles / through GI tubing in different locations / areas complete
All as per item No 28.00 here in before but of cable size 3 core 95 sqmm all as directed.
Taking out old but serviceable ACB of capacity 400 to 1200 amps 415 volts AC 50 HZ at various sub station and carry out necessary servicing, gresing to fixed and movable part, cleaning complete internally and testing after reinstallation. (Any demage occures during servicing will be borne by the contractor).
Supply and fix charging motor 110V AC/DC, 220V AC/DC of suitable size for ACB of capacity 400 to 1200 Amps complete all as specified and directed by Engr-in-charge
Supply and fix control relay for charging motor 110V AC/DC, 220V AC/DC of suitable size for ACB of capacity 400 to 1200 Amps complete all as specified and directed by Engr-in-charge
Dismantling old and unsv stay assy complete comprising of stay clamp, stay wire, stay insulator, stay grip, thimble, bow, stay rod 20 mm dia and stay plate etc including breaking of cement concrete complete.
Material and Labour stay assy complete comprising of stay clamp, stay wire, stay insulator, stay grip, thimble, bow, stay rod 20 mm dia and stay plate etc as shown in electrical plate No -01 ( loop insulators, stay clamps, excavations and earth work shall be measured and paid seperately under appropriate items).
Material and Labour for Earthing complete with copper earth plate electrode 600 x 600 x 3.15 mm thick buried directly in ground earth pit not less than 2.25mtr deep below normal ground level with top edge of the plate not less than 1.5 mtr below normal ground level connected to copper strip size 20 x 3 mm thick by mean of nuts/bolts, check nuts and washers of brass as shown in electrical plate No. 5 of SSR part-I including necessary excavation and earth work, GI Pipe 15 mm bore light grade for watering with Funnel, wire mesh and protection to earthing strip shall be provided with GI pipe light grade 32 mm dia up to 7.5 mtr from the earth plate electrode and refilling of soil including adequate quantity of charcoal dust and common salt etc & earth work in any strata, PCC pit chamber in cement mortar 1:3:6 type C-2 with 40 mm thick Precast RCC cover slab 1:2:4 type B with 8 mm dia TMT bar and handle with lifting hooks including testing any type complete all as specified and as directed.
Supply and install 11 KV outdoor type gang operated air break switch triple pole machinically operated mounted on insulator and steel frame, with operating mechanism worked from ground level for current rating upto 200 amps complete all as specified and directed by Engr-in-Charge.(cost of GOD includes cost of GI Pipe required for operation and these rates bases on reputed manufacturer like jaipuria.
Servicing and maintenance of Gang Operated Switch, Drop out fuse assembly triple pole, by applying white petroleum jelly, greasing the operating mechanism, drop out fuse assembly (Set of three); repairing/replacing worn out male contact (moving blade contact), Female contact(Fixed jaw contact), post insulators (Each set), copper jumper, MS jumper carrier, arcing horn, operating pipe of GI 25 mm dia 'B' class, pipe guide, locking arangement, operating lever, fixing of appropriate HT fuse element, nut bolts, etc and making the GOD functional complete all as specified and as directed by Engr - in - Charge.
Material and Labour for cable jointing kit for 11 KV(earthed) grade cable for straight through heat shrinkable type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 50 sq mm to 95 sq mm complete all as specified and directed by Engr-in-charge.
Supply and Fix Cable jointning kit for 11 KV (Earthed) grade cable for Straight through heat shrink type joint complete with jointning material and accessories suitable for 3 core XLPE armoured AL conductor cable of Size 120 to 185 sqmm.
Supply and fix cable jointing kit for 11 KV(Earthed) grade cable outdoor teremination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured AI conductor cable of size 120 .sqmm to 185 sqmm.
Supply and fix cable jointing kit for 11 KV(Earthed) grade cable for out door termination heat shrink type jointing maerial and accessories Complete with jointing suitable for 3 core XLPE armoured Aluminium conductor cable of size 50 to 95 sq mm.
Supply and fix cable jointing kit for 11 KV(Earthed) grade cable indoor teremination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured AI conductor cable of size 120 .sqmm to 185 sqmm.
Supply and fix cable jointing kit for 11 KV(Earthed) grade cable for indoor termination heat shrink type jointing maerial and accessories Complete with jointing suitable for 3 core XLPE armoured Aluminium conductor cable of size 50 to 95 sq mm.
Supplying and laying synthetic Rubber insulated mats 2.5 mm thick for voltage upto 11 kv for electrical purpose as per IS 15652-2006, (superseding IS 5424) suitable for electrical shock safety of sizes 2m x 1m, complete all as specified and directed by Engr-in-Charge
Cutting and trimming of branches n.exc 50 mm dia in size obstructing lumination of street light and touching line
Cleaning around any E/M installations /pole structures including removing all grass and other vegetations with roots complete all as directed and removing the rubbish to a distance not exceeding 50 mtr and depositing where directed.
Material and Labour for cleaning and preparation of steel surfaces of existing dull painting of transformer outdoor type including radiators, cooling ducts, vent pipes, condensor etc and applying two coats of synthetic enameled paint (heat resistant type) according to to IS colour code by spray machine including writing MES /SM No. in capital letters of suitable size on body for capacity upto 200KVA transformer outdoor/indoor complete all as specified and directed
All as per item No: 47.00 but capacity above 315 KVA and upto1000 KVA.
Supply and Laying for Breather unit with superior quality blue colour silica jel and fill up the oil, to maintain the exact value grade for transformer of capacity 200/250 KVA, including taking down unserviceable complete as specified.
All as per item No: 49.00 but capacity above 315 KVA and upto1000 KVA.
Supply and Fixing in repairs HV bushing with insulator, studs nut & washers suitable for 11 KV/433V HV side of transformer 100 KVA to 150 KVA
All as per item No 51 above but 200 KVA to 250 KVA Transformer
All as per item No 51.00 above but 315 to 400/500 KVA Transformer
All as per item No 51.00 above but 500 KVA Transformer
All as per item No 51.00 above but 630 KVA Transformer
All as per item No 51.00 above but 750 KVA Transformer
All as per item No 51.00 above but 1000 KVA Transformer
Supply and Fixing in repairs LV bushing with insulator, studs nut & washers suitable for11 KV/433V LV side of transformer of Capacity 100KVA to 150/250 KVA
All as per item No 58.00 above but 200 KVA to 250 KVA Transformer
All as per item No 58.00 above but 315 to 400/500 KVA Transformer
All as per item No 58.00 above but 500 KVA Transformer
All as per item No 58.00 above but 630 KVA Transformer
All as per item No 58.00 above but 750 KVA Transformer
All as per item No 58.00 above but 1000 KVA Transformer
Servicing and repairng/ carrying out maintenance of 11KV/433V transformer including the following works upto 250 KVA capacity (a) Removing from platform and disconnecting electrical connection from HT and LT side including transporting the transformer to work shop. (b) Dismantling the transformer, drain out transformer oil, lift the cover,coil assembly keep up the assembly in oven upto the preparation of inside chambers by cleaning inside, scraping complete all around old parts of the transformer. (c) Material and Labour for two coats of oil resistance painting internal (inside transformer) over a coat of red oxide primer. (d) Cleaning the core iron sheet laminations asssembly by oil complete,removing the carbon sediments, dust in the coil and core gently without making any damage to coil and core. (e) Re-assembling all dismantled parts including provision of new gasket,nut,bolts,refilling with transformer oil and transporting back to original location including elecric conection testing and commissioning complete. NOTE :- i). Oil filtration,supply of new oil will be measured separately. ii). All petty parts including nut, bolts, gasket minor weldings are deemed to be included the rate quoted iii). The rate for transport and lifting of transformer by crane should be deemed to include in the rate quoted.
All as per item No 65 above but 315 to 500 KVA Transformer
All as per item No 65 above but 630 to 1000 KVA Transformer
Material and Labour for rewinding of transformer of capacity upto 250 KVA,including dismantling, removing the core coil assembly from transformer remove the weak /unserviceable HT coil assembly rewinding with correct gauge super enamelled copper wire including drying,baking etc complete and remove the secondary coil assembly remove the insulation rewind with same coil and re-insulated. Assembling the primary and secondary coil in core, re-assembling the transformer complete refill with transformer oil, install, test and commissioning complete.and all as specified and directed by Engr-in-Charge.
All as per item No 68 above but 315 KVA to 500 KVA Transformer
All as per item No 68 above but 630 KVA to 1000 KVATransformer
Supply and Fixing D.O fuse elements Rating 11/22 KV capacity 05 Amps.
Supply and Fixing D.O fuse elements Rating 11/22 KV capacity 10 Amps.
Supply and Fixing D.O fuse elements Rating 11/22 KV capacity 20 Amps.
Supply and Fixing D.O fuse elements Rating 11/22 KV capacity 30 Amps.
Supply and Fixing D.O fuse element Rating 11/22 KV capacity 40 Amps.
Supply only fibre glass discharge rod 20 feet long suitable for 11/22 KV.
Material and Labour for preparation of old cement coated surface, cleaning the surface of the RCC Pole (HT) above the ground level incl coping area with 2 coats of ACC exterior emulsion paint over a coat of cement primer after preparation of surface and all as specified and directed by Engr-in-Charge
Material and Labour for Painting of 4 pole structure including preparation of old cement coated surface,angles,cross arms & painting of RCC poles with two coats of ACC exterier emulsion paint over a coat of Cement primer and painting of angle, cross arms,and connecting accesories with one coat of red oxide primer and two coats of aluminium paints all as specified and directed by Engr-in-charge.
Material and Labour for Painting of 6 pole structure including preparation of old cement coated surface,angles,cross arms & painting of RCC poles with two coats of ACC exterier emulsion paint over a coat of Cement primer and painting of angle, cross arms,and connecting accesories with one coat of red oxide primer and two coats of aluminium paints all as specified and directed by Engr-in-charge.
Material and Labour for Painting of 8 pole structure including preparation of old cement coated surface,angles,cross arms & painting of RCC poles with two coats of ACC exterier emulsion paint over a coat of Cement primer and painting of angle, cross arms,and connecting accesories with one coat of red oxide primer and two coats of aluminium paints all as specified and directed by Engr-in-charge.
Material and Labour for Loop insulator, Large size, with overall dimensions 90mmx140mm, clearance of hole 25.5 mm suitable for stay assembly complete all as specified and directed by Engr-in-charge
Material and Labour for Post / disc / pin insulator of 11 KV capacity carefully and re-fixing the same in the new cross arms / structure incl replacement of new hardware such as GI spindle, nut, bolt and washers complete all as directed
Danger notice plate of 1.6mm thick mild steel sheet, vitreous enamelled white, with letters, figures and conventional skull and bones in signal red colour and fixed with M.S. clamps, bolts and nuts of approved size, for HT, 25x20cm size
Supply and fixing cable route indicator made out of PCC 1:2:4 of size 20cmx20cmx90cm dully painted with red colour by two coat of enamel paint and writing MES HT cable with white paint on all sides complete all as directed.
Supply and Fixing in repairs lightning arrester expulsion type complete with all fittings transmission class,discarge capacity 65 kilo amps,suitable for 11 KV all as directed
Carry out materials /machineties , labour for fault finding of 11 KV HT under ground cable length 1.5 KM in case of cable fault such as short circuit/burn out/ earth fault etc including carrry out necessary HYPOT test by injecting high voltage upto 50KV complete all as specified and directed.
Material and Labour for earthing complete with GI earth plate 60cm x 60cm x 6mm thick buried directly in ground/ earth pit not less than 2.25M below ground level with top edge of the plate not less than 1.5M below ground level connected to 32x6mm GI Strip by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electric plate No.5 of MES SSR Part I connected to earthing test point, testing complete including necessary earth pit PCC 1: 3: 6 chamber with CI cover refilling of soil etc complete all as directed by Engineer-in-Charge.
Supplying and laying synthetic Rubber insulated mats 2 mm thick for voltage upto 3.3 kv for electrical purpose as per IS 15652-2006, (superseding IS 5424) suitable for electrical shock safety of sizes 2m x 1m, complete all as specified and directed by Engr-in-Charge
Supply and Fixing in repairs HV bushing with insulator, studs nut & washers suitable for 11 KV/433V HV side of transformer 100 KVA to 250 KVA
Material and Labour for Painting of 2 pole structure including preparation of old cement coated surface,angles,cross arms & painting of RCC poles with two coats of ACC exterier emulsion paint over a coat of Cement primer and painting of angle, cross arms,and connecting accesories with one coat of red oxide primer and two coats of aluminium paints all as specified and directed by Engr-in-charge.
Supply only electrical safty helmet HDPE material aerodynemic design all as specified and directed by engr-in-charge.
Supply only Gum Boot black PVC material for safty in rainy season of required size complete
Supply only safty belt for protection for climbing at pole of suitable size complete
Supply only 11 KV HT electrical Hand gloves , shock proof safty all as specified and directed.
Supply only Portable rechageable high brightness LED torch light
Supply and fix in repairs Galvanised Iron cross arms channel, bracing, support, clamps etc fabricated structured steel, sections, including nuts, bolts, washers etc and cutting to required length beat to any shape drilling holes, fixed on poles or jointed by means of elect welding complete incl taking down/dismantling the old items complete in any sub station/installations structure complete all as specified and directed by Engr-in-charge.
Shine Enterprises
Shree Ram Enterprises
E M CONSTROL SYSTEM
S and G Constructions
Prabha Electricals and Communications
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .