| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-AOC GRAM PO DUDHI SONBHADRA U P | ₹22.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.9 LRejected-AOC GRAM JAMUNIPUR COLONY BIDA BHADOHI DISTRICT BHADOHI | ₹22.9 L | L2 | Rejected-AOC L2 |
| 3 | L3₹23.6 LRejected-AOC | ₹23.6 L | L3 | Rejected-AOC L3 |
| 4 | L4₹23.9 LRejected-AOC 0 KAMLA SINGH BALUA SARAI CHANDAULI SARAI CHANDAULI UTTAR PRADESH 232109 | CHANDAULI | UTTAR PRADESH | 232109 | ₹23.9 L | L4 | Rejected-AOC L4 |
| 5 | L5₹24.0 LRejected-AOC | ₹24.0 L | L5 | Rejected-AOC L5 |
| Rank | Bidder | Total Amount |
|---|---|---|
| L1 | PANKAJ KUMAR GUPTA Bid ID 5728352 | ₹22,66,524.14 |
| L2 | RAM PYRE SINGH Bid ID 5729462 | ₹22,85,896.42 |
| L6 | a.k. construction Bid ID 5726733 | ₹26,18,332.23 |
| L5 | PANDEY ENTERPRISES Bid ID 5729313 | ₹23,98,158.09 |
| L4 | M/S KRISHNA ENTERPRISES Bid ID 5729607 | ₹23,87,345.48 |
| L3 | MANJU Bid ID 5728211 | ₹23,55,426.39 |
| Sl No | Description | Qty | Unit | PANKAJ KUMAR GUPTA L1 | RAM PYRE SINGH L2 | a.k. construction L6 | PANDEY ENTERPRISES L5 | M/S KRISHNA ENTERPRISES L4 | MANJU L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation of foundation in ordinary soil/sandy loam, clay or sand including lift upto 1.5 meter and lead upto 30 meter and including filling, watering, ramming of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches. | 57.02 | M3 | 118 ₹6,728.83 | 104 ₹5,930.5 | 118 ₹6,728.83 | 107.68 ₹6,140.34 | 108 ₹6,158.59 | 110 ₹6,272.64 |
| 2.00 | Laying C.C.(1:3:6) with cement, coarse sand and stone sand 20 to 40 mm including cost of all materials, labour, T&P etc. Required for proper completion of work. | 19.95 | M3 | 5,650 ₹1,12,734.45 | 4,990 ₹99,565.47 | 5,670 ₹1,13,133.51 | 5,146.44 ₹1,02,686.92 | 5,175.65 ₹1,03,269.74 | 4,500 ₹89,788.5 |
| 3.00 | First class brick work in foundation and superstructure cement mortar 1:6including cost of all materials, labour T&P etc. Required for proper completion of work. | 62.99 | M3 | 7,000 ₹4,40,965 | 6,630 ₹4,17,656.85 | 7,542 ₹4,75,108.29 | 6,826.41 ₹4,30,029.7 | 6,864.88 ₹4,32,453.12 | 7,000 ₹4,40,965 |
| 4.00 | 25 mm thick DPC (1:2:4) with OPC-43 grade cement, Kanhar river sand including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work. | 25.52 | M2 | 200 ₹5,104.6 | 230 ₹5,870.29 | 244 ₹6,227.61 | 220.89 ₹5,637.78 | 222.04 ₹5,667.13 | 200 ₹5,104.6 |
| 5.00 | Painting on D.P.C. with two coats of airblown bitumen 85/50 or @ 1.7 Kg./sqm. Approx. including coast of fuel if any. | 25.52 | M2 | 100 ₹2,552.3 | 90 ₹2,297.07 | 102 ₹2,603.35 | 92.93 ₹2,371.85 | 93 ₹2,373.64 | 100 ₹2,552.3 |
| 6.00 | Centering and shuttering for R.C.C. work including cost of all materials, Labour ,T&P etc. complete. | 584.43 | M2 | 150 ₹87,664.2 | 365 ₹2,13,316.22 | 419 ₹2,44,875.33 | 380.04 ₹2,22,106.02 | 382 ₹2,23,251.5 | 265 ₹1,54,873.42 |
| 7.00 | Providing and Laying R.C.C.work M-20(1:1.5:3) with cement, coarse sand,FM not less than 2.0 and crushed hard stone grit 10 to 20 mm size including cost of all material, lead , lift, T&P etc. Required for proper completion of work. | 78.1 | M3 | 7,800 ₹6,09,172.2 | 6,855 ₹5,35,368.65 | 7,800 ₹6,09,172.2 | 7,060.2 ₹5,51,394.56 | 7,099.81 ₹5,54,488.06 | 7,500 ₹5,85,742.5 |
| 8.00 | Cutting, bending, binding and placing reinforcement including cost of all materials, Labour T&P etc. Required for proper completion of work | 9.2 | MT | 55,000 ₹5,05,780 | 61,700 ₹5,67,393.2 | 70,200 ₹6,45,559.2 | 63,557.46 ₹5,84,474.4 | 63,915.6 ₹5,87,767.86 | 66,000 ₹6,06,936 |
| 9.00 | S/F Fabrication of mild steel/ iron work in grill gate, railing Door and window frame including cutting drilling Welding/Riveting hinges where necessary and fixing in position including cost of all materials, Labour, T&P etc. with one coat of red oxide primer complete in all respects. | 498.51 | Kg | 103 ₹51,346.12 | 90 ₹44,865.54 | 105 ₹52,343.13 | 76.9 ₹38,335.11 | 96.46 ₹48,085.89 | 103 ₹51,346.12 |
| 10.00 | Fabrication and fixing in position steel doors, shutter made of 30 x 30 x 5 mm. angle iron frame with 18 SWG M.S. sheet, L-drop, tower bolt hinges etc. with cost of all materials, T&P and one coat of red oxide primer. | 730.08 | Kg | 105 ₹76,658.4 | 90 ₹65,707.2 | 106 ₹77,388.48 | 77.8 ₹56,800.22 | 98.28 ₹71,752.26 | 105 ₹76,658.4 |
Tender Value
Refer Docs
EMD Value
₹53,000
Closing Date
8 Dec 2025, 3:00 pmClosed
EXECUTIVE ENGINEER
EE KCD-2 PIPRI SONBHADRA UP
Construction of 3 No extra room for primary school at F Block Rehabilation colony Amwar.
2025_UPIDC_1094578_1
08/EE/2025-26/LOT_2
Open Tender
Civil Works
90 days
Amwar Duddhi Sonbhadra
Please refer tender documents
2 documents required · 2 mandatory
₹1,180
₹53,000
29 Dec 2025
28 Nov 2025
8 Dec 2025
28 Nov 2025
8 Dec 2025
28 Nov 2025
Amount
Excavation of foundation in ordinary soil/sandy loam, clay or sand including lift upto 1.5 meter and lead upto 30 meter and including filling, watering, ramming of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches.
Laying C.C.(1:3:6) with cement, coarse sand and stone sand 20 to 40 mm including cost of all materials, labour, T&P etc. Required for proper completion of work.
First class brick work in foundation and superstructure cement mortar 1:6including cost of all materials, labour T&P etc. Required for proper completion of work.
25 mm thick DPC (1:2:4) with OPC-43 grade cement, Kanhar river sand including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work.
Painting on D.P.C. with two coats of airblown bitumen 85/50 or @ 1.7 Kg./sqm. Approx. including coast of fuel if any.
Centering and shuttering for R.C.C. work including cost of all materials, Labour ,T&P etc. complete.
Providing and Laying R.C.C.work M-20(1:1.5:3) with cement, coarse sand,FM not less than 2.0 and crushed hard stone grit 10 to 20 mm size including cost of all material, lead , lift, T&P etc. Required for proper completion of work.
Cutting, bending, binding and placing reinforcement including cost of all materials, Labour T&P etc. Required for proper completion of work
S/F Fabrication of mild steel/ iron work in grill gate, railing Door and window frame including cutting drilling Welding/Riveting hinges where necessary and fixing in position including cost of all materials, Labour, T&P etc. with one coat of red oxide primer complete in all respects.
Fabrication and fixing in position steel doors, shutter made of 30 x 30 x 5 mm. angle iron frame with 18 SWG M.S. sheet, L-drop, tower bolt hinges etc. with cost of all materials, T&P and one coat of red oxide primer.
Earthwork in filling in Room and outside for preparation of subgrade from borrow area with all leads and lifts with all taxes, labour cess and royalty from borrow area for proper completion of work
25 mm thick C.C.(1:2:4) flooring with cement, coarse sand, and stone ballast 4.75 to 10 mm including cost of all materials, labour, T&P etc. required for proper materials, labour, T&P etc. required for proper completion of work.
12 mm thick cement plaster in 1:4 C.M. on brick work including cost of all materials, labour,T&P etc.
White washing (three) coat on new surface including cost of all materials, labour, T&P etc. required for proper completion of work.
Painting two coat of of synthetic enamel paint on new surface superior quality such as luxol higloss apcolite superlac including cost of all materials, labour,T&P Etc. Required for proper completion of work.
Wiring point for light with 1 sq mm F R Pvc insulated multistrand single core copper conductor cable in 2 mm thick PVC conduit pipe concealed in the wall complete with 1.5 sq mm earth wired drawn inside the conduite and piano type switch ceiling rose on 3 mm thick phenolic laminited back light sheet etc complete in all respect.
Wiring point for fan with 1 sq mm F R Pvc insulated multistrand single core copper conductor cable in 2 mm thick PVC conduit pipe concealed in the wall complete with 1.5 sq mm earth wired drawn inside the conduite and piano type switch ceiling rose on 3 mm thick phenolic laminited back light sheet etc complete in all respect.
Supplying and fixing surface / flush mounting 4 way SPN distribution board without MCB complete in all respect and as directed site.
Supplying and fixing of 6/10/16/20/25/32 Amp MCB (10 KA )
Supplying and Laying of Aluminium twin insulated cable 1100 V.
S/F of hexagonal fan box with hexagonal side of approx. 80mm. in length fabricated from 16 SWGMS sheet incorporting 10mm. dia M.S. round has duly bent for supporting fan hanger duly painted with red oxide and screw arrangement with wiring conduct laid in the R.C.C. roof before concreting along with supply of all material, labour T&P etc. for proper completion.
RAM PYRE SINGH (BID ID -5729462)
MANJU (BID ID -5728211)
M/S KRISHNA ENTERPRISES (BID ID -5729607)
PANDEY ENTERPRISES (BID ID -5729313)
a.k. construction (BID ID -5726733)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
TenderLot2.pdf
Tender Documents • 0.92 MB
BOQ_2012855.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid