Loading…
Loading…
Tender Value
₹85.4 L
EMD Value
₹1.7 L
Closing Date
29 Sept 2026, 6:00 pm2d left
DFO Mahore
DFO office Dharmari
Afforestation work using 7 strand black annealed barbed wire BA GW fencing with square PPC or wooden fence posts at 10 feet spacing including plantation of poly bagged and naked root plants saplings patch sowing plantation of grass slips BUC of 1st y
2026_FD_325721_1
eNIT38of2026-27
Open Tender
Civil Works
Percentage
90 days
Different Locations of Mahore FD
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
0406 Forest
₹1.7 L
23 Sept 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
29 Sept 2026
23 Sept 2026
23 Sept 2026 - 29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fencing (7136 rft, 12.70 Ha):- 99/Ar Clearing jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at aheight of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. | 3,687.38 | Sqm | 12.49 | ₹46,055.38 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil. | 68.24 | cum | 479.3 | ₹32,707.43 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) | 5.05 | cum | 4,826.5 | ₹24,373.83 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size) Crushed | 18.96 | cum | 6,591.25 | ₹1,24,970.1 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 265.43 | Sqm | 286.35 | ₹76,005.88 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 50.55 | Cum | 218.4 | ₹11,040.12 |
| 7 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) | 316.67 | Sqm | 98.75 | ₹31,271.16 |
| 8 | Supply of precast cement conc. poles of size 75mmx75mmx1800mm (including carriage) | 714 | Nos | 270 | ₹1,92,780 |
| 9 | Erecting c.conc. Poles in position | 714 | Nos | 180 | ₹1,28,520 |
| 10 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, , last but one end post and corner post shall be strutted on both sides and end post one side only, provided with 7 horizontal lines of barbed wire weighing 9.38 kg per 100 meters (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire . To be paid as per actual | 15,782.01 | MTR | 12.45 | ₹1,96,486.02 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_1101200.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .