| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC VPO DAULATPUR DISTT HISAR 125122 | DAULATPUR | HISAR | HARYANA | 125122 | ₹1.2 Cr | 1 | Accepted-AOC DUE TO LOWER SIDE |
| 2 | 2₹1.3 Cr+₹80,187 (0.64%)Rejected-AOC HISAR PHE CIRCLE HARYANA | ₹1.3 Cr+₹80,187 (0.64%) | 2 | Rejected-AOC DUE TO HIGHER SIDE |
| 3 | 3₹1.6 Cr+₹32.8 L (26.3%)Rejected-AOC NA | NA | NA | 121004 | ₹1.6 Cr+₹32.8 L (26.3%) | 3 | Rejected-AOC DUE TO HIGHER SIDE |
| 4 | 4₹1.9 Cr+₹62.6 L (50.2%)Rejected-AOC CHARKHI DADRI | CHARKI DADRI | HARYANA | 127022 | ₹1.9 Cr+₹62.6 L (50.2%) | 4 | Rejected-AOC DUE TO HIGHER SIDE |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
13 Mar 2023, 11:00 amClosed
BALVINDER NAIN
EE PHE Division No. 2 Hisar
Inlet pipe Channel, Raw Water sump well, 2 No. RCC suction wel , Pump Chamber, Generating Platform, land for pumping station, pumping machinery
2023_HRY_263235_1
2023D216E317 386C 4F13 A0D8 7F161363530D565PUH
Open Tender
Civil Works
Works
180 days
HISAR
3 documents required · 3 mandatory
₹15,000
₹2.8 L
Yes
12 May 2023
7 Mar 2023
13 Mar 2023
7 Mar 2023
13 Mar 2023
7 Mar 2023
Amount
Providing and fixing of Zero Velocity valve IVC/VAG/Kirloskar make of PN 1.6 rating, including, carriage, loading and unloading and fixing, complete in all respect for the satisfaction of the Engineer-in-charge. 300mm
Providing and fixing of Zero Velocity valve IVC/VAG/Kirloskar make of PN 1.6 rating, including, carriage, loading and unloading and fixing, complete in all respect for the satisfaction of the Engineer-in-charge. 250 mm
Provision for flow meter of various sizes complete in all respects. 150 mm
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Operation and Maintenance of Raw water pumping station and rising main complete scope of work mentioned in the DNIT. Disinfection material supplied by the PHED as per schedule IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period
Bidder Name
Amount
RAKESH KUMAR CONTRACTOR(GSTN-06BALPR8992J2ZP)
THE BABA BHUNGER JI COOP LABOUR AND CONSTRUCTION SOCIETY LIMITED(GSTN-06AABAT5936C1ZN)
NASEEB SINGH CONTRACTOR(GSTN-NA)
SURENDER CONT(GSTN-NA)
THE BABA BHUNGER JI COOP LABOUR AND CONSTRUCTION SOCIETY LIMITED
SURENDER CONT
RAKESH KUMAR CONTRACTOR
NASEEB SINGH CONTRACTOR
SURENDER CONT
RAKESH KUMAR CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .