| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.7 LAccepted-AOC | ₹44.7 L Quoted ₹46.0 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹47.9 L+₹1.9 L (4.05%)Rejected-AOC | ₹47.9 L+₹1.9 L (4.05%) | L2 | Rejected-AOC Being L2 |
| 3 | L3₹48.7 L+₹2.7 L (5.86%)Rejected-AOC TUPKHANA PART 1 PO ARUNACHAL PS SILCHAR DIST CACHAR ASSAM 788025 | CACHAR | ASSAM | 788025 | ₹48.7 L+₹2.7 L (5.86%) | L3 | Rejected-AOC Being L3 |
| 4 | L4₹49.0 L+₹2.9 L (6.38%)Rejected-AOC | ₹49.0 L+₹2.9 L (6.38%) | L4 | Rejected-AOC Being L4 |
| 5 | L5₹49.6 L+₹3.6 L (7.81%)Rejected-AOC MISSION CHARIALI NH 37 A PO KETEKIBARI TEZPUR 784 154 ASSAM | SONITPUR | ASSAM | 784154 | ₹49.6 L+₹3.6 L (7.81%) | L5 | Rejected-AOC Being L5 |
| Sl No | Description | Qty | Unit | M/S TAPAN KUMAR RAY L4 | M/S RAJU ENTERPRISES AND BROS L6 | SURANA CORPORATION L1 | LUIT CONSTRUCTION L5 | M/S R A ENTERPRISE L3 | SHRI YOUNUS KHAN L7 | MAGADH TRADING L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00B & R Division Items | ||||||||||
| 2.00 | Demolition of cement concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. | 6 | Cum | 480 ₹2,880 Lowest | 500 ₹3,000 | 500 ₹3,000 | 700 ₹4,200 | 630 ₹3,780 | 555 ₹3,330 | 600 ₹3,600 |
| 3.00 | Demoliton cement concrete (unreinforced) as roof floors ( other than groung floor ) landing , chajjas and similar work complete all as specified and as directed. | 10.5 | CUM | 450 ₹4,725 Lowest | 480 ₹5,040 | 530 ₹5,565 | 650 ₹6,825 | 520 ₹5,460 | 480 ₹5,040 | 550 ₹5,775 |
| 4.00 | Demolition of brick/stone masonry, built in cement mortar including all quoins, arches, pillars etc but exluding ashlars facings, dressed stone work and pre-cast concrete articles all as directed. | 5 | Cum | 580 ₹2,900 | 600 ₹3,000 | 600 ₹3,000 | 556 ₹2,780 | 550 ₹2,750 Lowest | 600 ₹3,000 | 550 ₹2,750 Lowest |
| 5.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to stores and rubbish off the premises complete all as specified and directed. | 575 | Sqm | 20 ₹11,500 Lowest | 25 ₹14,375 | 25 ₹14,375 | 55 ₹31,625 | 50 ₹28,750 | 25 ₹14,375 | 50 ₹28,750 |
| 6.00 | Taking down Chowkhats or frames not exc. 1.5 sq m each with shutters (without taking off shutters from the frames) complete all as specified and directed. | 70 | Each | 56 ₹3,920 | 50 ₹3,500 Lowest | 50 ₹3,500 Lowest | 65 ₹4,550 | 60 ₹4,200 | 50 ₹3,500 Lowest | 60 ₹4,200 |
| 7.00 | Taking down cement plaster on brick or stone walls etc, including raking out joints, hacking for key scrubing down with water etc complete all as specified and as directed. | 350 | Sqm | 210 ₹73,500 | 200 ₹70,000 | 15 ₹5,250 Lowest | 250 ₹87,500 | 210 ₹73,500 | 200 ₹70,000 | 210 ₹73,500 |
| 8.00 | Taking down Chowkhats or frames exc 1.5 sq. m but n exc 4 sq. m each with shutters (without taking off shutters from the frame) complete all as specified and directed. | 50 | Each | 25 ₹1,250 | 20 ₹1,000 Lowest | 200 ₹10,000 | 34 ₹1,700 | 25 ₹1,250 | 20 ₹1,000 Lowest | 25 ₹1,250 |
| 9.00 | Taking up or down GI tubing and connection 15 mm bore, including cleaning for refixing complete all as specified and directed. | 80 | RM | 32 ₹2,560 | 30 ₹2,400 Lowest | 30 ₹2,400 Lowest | 56 ₹4,480 | 30 ₹2,400 Lowest | 30 ₹2,400 Lowest | 30 ₹2,400 Lowest |
| 10.00 | Taking up or down GI tubing and connection 20 mm bore, including cleaning for refixing complete all as specified and directed. | 90 | RM | 780 ₹70,200 | 750 ₹67,500 | 40 ₹3,600 Lowest | 750 ₹67,500 | 730 ₹65,700 | 750 ₹67,500 | 750 ₹67,500 |
Tender Value
₹44.8 L
EMD Value
₹89,600
Closing Date
18 Jul 2026, 6:00 pmClosed
GE SILCHAR
Office of the GE Silchar Masimpur Cantt
COMPREHENSIVE MAINT OF GROUP A BLDGS OF CIJW SCHOOL VAIRENGTE
2026_MES_773323_1
8161A/E8
Open Tender
Civil Works
Item Rate
270 days
Vairengte
Class D Category a i and other criteria as per NIT and Tender Doc
8 documents required · 8 mandatory
₹500
GE Silchar
₹89,600
Yes
21 Aug 2026
19 Jun 2026
21 Jul 2026
19 Jun 2026
18 Jul 2026
4 Jul 2026
19 Jun 2026 - 29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | B & R Division Items | - | - | - | - |
| 2 | Demolition of cement concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. | 6 | Cum | - | - |
| 3 | Demoliton cement concrete (unreinforced) as roof floors ( other than groung floor ) landing , chajjas and similar work complete all as specified and as directed. | 10.5 | CUM | - | - |
| 4 | Demolition of brick/stone masonry, built in cement mortar including all quoins, arches, pillars etc but exluding ashlars facings, dressed stone work and pre-cast concrete articles all as directed. | 5 | Cum | - | - |
| 5 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to stores and rubbish off the premises complete all as specified and directed. | 575 | Sqm | - | - |
| 6 | Taking down Chowkhats or frames not exc. 1.5 sq m each with shutters (without taking off shutters from the frames) complete all as specified and directed. | 70 | Each | - | - |
| 7 | Taking down cement plaster on brick or stone walls etc, including raking out joints, hacking for key scrubing down with water etc complete all as specified and as directed. | 350 | Sqm | - | - |
| 8 | Taking down Chowkhats or frames exc 1.5 sq. m but n exc 4 sq. m each with shutters (without taking off shutters from the frame) complete all as specified and directed. | 50 | Each | - | - |
| 9 | Taking up or down GI tubing and connection 15 mm bore, including cleaning for refixing complete all as specified and directed. | 80 | RM | - | - |
| 10 | Taking up or down GI tubing and connection 20 mm bore, including cleaning for refixing complete all as specified and directed. | 90 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
8161A-TP.pdf
Tender Documents • 0.58 MB
8161A-SchofCreditformat.pdf
Additional Documents • 0.05 MB
BOQ_865915.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .