| 3 | Not Admitted-Fee/PreQual/Technical NO 4 ARANMANAI RAMASAMY KOTHANAR WEST STREET RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
Refer Docs
EMD Value
₹74,000
Closing Date
8 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector( Dev), RDDA,Ramanathapuram
District Rural Development Agency, Ramanathapuram
Rejuvenation of Water Bodies in Package No.MNP-1/AGAMT 2021-22 of Mandapam Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242226_1
R7/5593/2021/dated 05.07.2022 MNP-1
Open Tender
Civil Works
Item Rate
180 days
RDDA
Refer to Tender
6 documents required · 6 mandatory
₹0
₹74,000
District Rural Development Agency, Ramanathapuram
9 Sept 2022
18 Jul 2022
8 Aug 2022
18 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
Amount
Part I: Deepening of Virusadipananthoppu Oorani with construction of bathing ghat and Inlet at Vellariodai habitation in Vellariodai panchayat, Part II: Deepening of Nondisamy kovil Oorani with construction of bathing ghat at Nathakulam habitation in Vellariodai panchayat, Part III:Deepening of Nochiyoorani Tharavai Oorani with construction of bathing ghat and Inlet at Nochiyoorani habitation in Nochiyoorani panchayat, Part IV:Deepening of Vengalathur Oorani with construction of bathing ghat and Inlet at Thennampillaivalasai habitation in Pattinamkathan panchayat,Part V: Deepening of Madathu Oorani with construction of bathing ghat and Inlet at Ramnagar habitation in Pattinamkathan panchayat,Part VI: Deepening of Chetti Oorani with construction of bathing ghat and Inlet at Ramnagar habitation in Pattinamkathan panchayat ,Part VII: Deepening of Nagachi Pillayarkovil Oorani with construction of bathing ghat and Inlet at Keelanagachi habitation in Keelanagachi panchayat,Part VIII: Deepening of Sonanthoppu Oorani with construction of bathing ghat and Inlet at Kenikkaraivalasai habitation in Keelanagachi panchayat,Part IX: Deepening of Maruthankulam Oorani with construction of bathing ghat and Inlet at Valantharavai habitation in Valantharavai panchayat,Part X: Deepening of Valuthur Tharavai Oorani with construction of bathing ghat and Inlet at Valuthur habitation in Valantharavai panchayat,Part XI: Deepening of Arasu Oorani with construction of bathing ghat and Inlet at Udachiyaarvalasai habitation in Valantharavai panchayat
Part I: Deepening of Virusadipananthoppu Oorani with construction of bathing ghat and Inlet at Vellariodai habitation in Vellariodai panchayat
Desilting of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along the tank bund and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Toe Wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Colour wash Painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Part II: Deepening of Nondisamy kovil Oorani with construction of bathing ghat at Nathakulam habitation in Vellariodai panchayat
Desilting of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along the tank bund and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Colour wash Painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Part III:Deepening of Nochiyoorani Tharavai Oorani with construction of bathing ghat and Inlet at Nochiyoorani habitation in Nochiyoorani panchayat
Desilting of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along the tank bund and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Toe Wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Colour wash Painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Part IV:Deepening of Vengalathur Oorani with construction of bathing ghat and Inlet at Thennampillaivalasai habitation in Pattinamkathan panchayat
Desilting of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along the tank bund and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Toe Wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Colour wash Painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Part V: Deepening of Madathu Oorani with construction of bathing ghat and Inlet at Ramnagar habitation in Pattinamkathan panchayat
Desilting of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along the tank bund and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Toe Wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Colour wash Painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Part VI: Deepening of Chetti Oorani with construction of bathing ghat and Inlet at Ramnagar habitation in Pattinamkathan panchayat
Desilting of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along the tank bund and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Toe Wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Colour wash Painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Part VII: Deepening of Nagachi Pillayarkovil Oorani with construction of bathing ghat and Inlet at Keelanagachi habitation in Keelanagachi panchayat
Desilting of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along the tank bund and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Toe Wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Colour wash Painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Part VIII: Deepening of Sonanthoppu Oorani with construction of bathing ghat and Inlet at Kenikkaraivalasai habitation in Keelanagachi panchayat,
Desilting of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along the tank bund and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Toe Wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Colour wash Painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Part IX: Deepening of Maruthankulam Oorani with construction of bathing ghat and Inlet at Valantharavai habitation in Valantharavai panchayat,
Desilting of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along the tank bund and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Colour wash Painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Part X: Deepening of Valuthur Tharavai Oorani with construction of bathing ghat and Inlet at Valuthur habitation in Valantharavai panchayat
Desilting of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along the tank bund and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Toe Wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Colour wash Painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Part XI: Deepening of Arasu Oorani with construction of bathing ghat and Inlet at Udachiyaarvalasai habitation in Valantharavai panchayat
Desilting of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along the tank bund and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Toe Wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour cost
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Colour wash Painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50%
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(Below)
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Nageswari B
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .