Tender Value
₹10.0 L
EMD Value
₹20,000
Closing Date
14 Sept 2026, 1:00 pmClosed
Director_General_Park_and_Square
5, S N Banerjee Road, Kolkata-700013
IMPROVEMENT AND DEVELOPMENT OF CANAL SIDEGARDEN FROM THE JUNCTION OF DHALAI BRIDGE(ADJACENT TO DATA BABA MAZAAR) UPTO THE WESTERN SIDE OF THE CANAL (MAZDOOR PARA) IN WARD NO 66.
2026_KMC_1040404_1
KMC/DG_PS/VII/66/07/26-27
Open Tender
CIVIL WORKS
Percentage
45 days
Kolkata
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹20,000
16 Sept 2026
3 Sept 2026
16 Sept 2026
5 Sept 2026
14 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 13)Santras. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 4 | EA | 326 | ₹1,304 |
| 2 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 10 | EA | 245 | ₹2,450 |
| 3 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 19) Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) | 80 | SQM | 11 | ₹880 |
| 4 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. | 3.75 | M3 | 447 | ₹1,676.25 |
| 5 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick | 4.73 | M3 | 939 | ₹4,436.78 |
| 6 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.16 | %M3 | 11,927 | ₹1,878.5 |
| 7 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 0.16 | %M3 | 7,754 | ₹1,221.26 |
| 8 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 21 | SQM | 358 | ₹7,518 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion | 3.15 | M3 | 4,572 | ₹14,401.8 |
| 10 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 8. Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth | 13.39 | M3 | 5,306 | ₹71,034.08 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
SPE_CON.pdf
Additional Documents • 0.46 MB
Ten_Doc.pdf
Tender Documents • 1.08 MB
BOQ_2554848.xls
BOQ • 0.30 MB
Ten_and_dec.pdf
Additional Documents • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .