Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Finance | Not Admitted-Finance Others-The rate quoted by Sh. Abdul Rashid is below 25% rate over advertised cost. and hence is rejected as per condition 4 of e-NIT 45 of 2023-24. |
Tender Value
₹2.6 L
EMD Value
₹5,284
Closing Date
24 Aug 2023, 10:00 amClosed
DFO SF DODA
forest complex doda
Afforestation works by means of planting of Naked root plants pit and Trench planting at RDF Co77/Udil (Gurdoor) Pty. Chingam-C Social Forstry Range Kishtwar and Divisiion Doda.
2023_FD_218843_1
45 of 2023-24 dated 26-06-2023
Open Tender
Civil Works
Item Rate
30 days
Gurdoor
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
DFO SF DODA
₹5,284
Yes
25 Sept 2023
27 Jun 2023
25 Aug 2023
27 Jun 2023
24 Aug 2023
27 Jun 2023
Amount
Co77/Udil (Gurdoor) Pty. Chingam-C Social Forstry Range Kishtwar Social Forstry Range Doda and Divisiion Doda by way of following operations:
Planting of Naked Root saplings in staggered pits 45cm x 45cm x 45cm along contours as well as on the flat surface. The rates includes the cost of digging of pits, refilling with clean surface soil, carriage of plants, raising of water harvesting structures, application of insecticide and pesticide, FYM, weeding and hoeing etc.
Trench Plantation:- Planting of Naked Root Plants in Trenches of size 90x45x45 cms (one plant in each trench) and a water harvesting structure around each plant.
Pond Work:- Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil No 1/2 Lenght 7 Breath 7 Height 1 = qty. 24.50
Dry random rubble masonry with hard stone in foundation and plinth: 7.3.2 Without bond stone No 2 Length 7 Breath 0.40+0.60/2 height 1 qty = 7.00 No .2 length 5.40 Breath 0.40+0.60/2 length 1 qty = 5.40 total = 12.10
Carraige of stone at an avg. distance of 1Km HL S. No 1 Itme No. 2 quantitly 12.40 Total = 10.10
Sanjeet Kumar
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .