Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.8 LAdmitted-Finance | +2.89% | ₹13.8 L | L1 | Admitted-Finance |
| 2 | L2₹13.8 L+₹5,080.52 (0.37%)Admitted-Finance | +3.27% | ₹13.8 L+₹5,080.52 (0.37%) | L2 | Admitted-Finance |
| 3 | L3₹13.8 L+₹8,021.87 (0.58%)Admitted-Finance | +3.49% | ₹13.8 L+₹8,021.87 (0.58%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Documents are not satisfactory. |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Documents are not satisfactory. |
Tender Value
Refer Docs
EMD Value
₹26,740
Closing Date
17 Aug 2026, 5:00 pmClosed
Executive Engineer, Siliguri Division, Housing Dte
Office of the Executive Engineer, Siliguri Division, Housing Dte., M 6 building, Tenzing Norgey Road, Pradhan Nagar, Siliguri, Pin 734003, Darjeeling.
Construction of Boundary wall at R.H.E. Kurseong, Darjeeling in the district of Darjeeling. Length 150 meter under Siliguri Sub-Division, Housing Directorate.
2026_HSD_1035291_1
WBHOUSING_EE_SILIGURI_eNIT-02
Open Tender
CIVIL WORKS
Percentage
45 days
R.H.E. Kurseong.
Please refer Tender documents.
8 documents required · 8 mandatory
₹26,740
8 Sept 2026
30 Jul 2026
20 Aug 2026
2 Aug 2026
17 Aug 2026
2 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . | |||||
| 1.01 | (a) Depth of excavation not exceeding 1.500 mm. | - | Cu.M. | - | - |
| 2 | Supplying and laying Polythene Sheet (150gm / sq.m.) overdamp proof course or below flooring or roof terracing or infoundation or in foundation trenches. | 1 | Sq.M. | 28.8 | ₹28.77 |
| 3Cement concrete with 30 mm. down graded shingles excluding shuttering.N.B. VarietyIn ground floor . | |||||
| 3.01 | (a) 1:3:6 proportion. | 1 | Cu.M | 5,372.52 | ₹5,367.15 |
| 4 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | - | Sq.M. | 1,028.84 | - |
| 5Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. | |||||
| 5.01 | (a) River bazree. | 1 | Cu.M | 6,950.3 | ₹6,943.35 |
| 6Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. | |||||
| 6.01 | (a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.
(i) Other Manufacturers not specified | - | M.T. | 68,933.26 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 23.07 MB
2911.pdf
Tender Documents • 2.51 MB
BOQ_2543048.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .