| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | ₹7.8 L | L1 | Accepted-AOC AOC |
| 2 | L2₹8.0 LRejected-Finance | ₹8.0 L | L2 | Rejected-Finance Highest Rate Rejected |
| 3 | L3₹8.9 LRejected-Finance | ₹8.9 L | L3 | Rejected-Finance Highest Rate Rejected |
| 4 | L4₹9.2 LRejected-Finance | ₹9.2 L | L4 | Rejected-Finance Highest Rate Rejected |
| 5 | L5₹13.3 CrRejected-Finance | ₹13.3 Cr | L5 | Rejected-Finance Highest Rate Rejected |
| Sl No | Description | Qty | Unit | PANACEA TECHNOLOGY L3 | Lalit Kumar Rajani Thekedar L4 | ACURATE CONTRACTOR L1 | M/S G.S. CONSTRUCTION L5 | M/S SHIV SHAKTI CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in ordanary soil including all leads and lifts, labour charges, T& P etc. and disposal of earth as per direction of Engineer-in-charge. | 42.71 | M3 | 189.53 ₹8,094.83 | 184 ₹7,858.64 | 144 ₹6,150.24 | 110 ₹4,698.10 | 60 ₹2,562.60 |
| 2.00 | Cement Concrete (1:3:6) with cement, coarse sand and 20 to 40mm size stone ballast in foundation of VRB by mechanical mixing | 12.83 | M3 | 4,800 ₹61,584 | 5,096 ₹65,381.68 | 4,600 ₹59,018 | 7,000 ₹89,810 | 6,000 ₹76,980 |
| 3.00 | I-class brick work in 1:4 cement mortar up to 3.0 mt lift and 60.0 mt leaad of mix material | 45.29 | M3 | 5,211 ₹2.4 L | 5,030 ₹2.3 L | 4,512 ₹2.0 L | 5,350 ₹2.4 L | 5,900 ₹2.7 L |
| 4.00 | C.C. (1:2:4) cement, coarse sand and 12-20 mm size stone shingle in parapet wall top in coping including all cost of material, labour, T&P required for proper complition of work by manual mixing. | 6.66 | M3 | 6,100 ₹40,626 | 6,005 ₹39,993.30 | 5,300 ₹35,298 | 7,500 ₹49,950 | 7,000 ₹46,620 |
| 5.00 | Centering & Shuttering for R.C.C. work including cost of centring and shuttering up to 3.0mt height | 48.1 | M2 | 510 ₹24,531 | 522 ₹25,108.20 | 412 ₹19,817.20 | 900 ₹43,290 | 300 ₹14,430 |
| 6.00 | Supply of HYSD steel barincluding bending, binding cutting and placing in position including cost of winding wire in R.C.C. Slab | 1,766.08 | Kg. | 77 ₹1.4 L | 76 ₹1.3 L | 66.2 ₹1.2 L | 75,000 ₹13.2 Cr | 58 ₹1.0 L |
| 7.00 | R.C.C 1:1.5:3 in Slab, wearing coat and coping with coarse sand, crushed agg. 12 to 20 mm size & cement including cost of all material labour taxes &carriage upto site of work all lead lifts for proper completion of work with mechanical mixing and used vibrator also | 20.21 | M3 | 8,000 ₹1.6 L | 8,400 ₹1.7 L | 6,900 ₹1.4 L | 8,140 ₹1.6 L | 7,000 ₹1.4 L |
| 8.00 | cement pointing 1:3 (Struck deep) on brick work | 32.46 | M2 | 187.38 ₹6,082.35 | 182 ₹5,907.72 | 135 ₹4,382.10 | 140.5 ₹4,560.63 | 100 ₹3,246 |
| 9.00 | Brick soling with ist class brick laid on edge including preparation of subgrade to prescrived camber, filling joints with local earth the entire surface in bed level waterway of V.R.B. | 191.73 | M2 | 392 ₹75,158.16 | 561 ₹1.1 L | 472 ₹90,496.56 | 515.5 ₹98,836.82 | 450 ₹86,278.50 |
| 10.00 | Earth work in making diversion across branch for diverting traffic etc including cost of all material, labour and T&P etc. required for proper completion of work. | 585.62 | M3 | 129 ₹75,544.98 | 130 ₹76,130.60 | 88 ₹51,534.56 | 180 ₹1.1 L | 70 ₹40,993.40 |
Tender Value
₹9.5 L
EMD Value
₹19,000
Closing Date
21 Aug 2025, 10:30 amClosed
EXECUTIVE ENGNINEER
SHARDA CANAL DIVISION SHAHJAHANPUR
Reconstruction of Damaged VRB at Km. 5.560 of Katra Dy.
2025_UPIDC_1063210_2
02/EE/2025-26
Open Tender
Civil Works - Bridges
SHAHJAHANPUR
02/EE/2025-26
2 documents required · 2 mandatory
₹766
₹19,000
Yes
21 Jan 2026
15 Aug 2025
21 Aug 2025
15 Aug 2025
21 Aug 2025
15 Aug 2025
Amount
Earth work in excavation of foundation in ordanary soil including all leads and lifts, labour charges, T& P etc. and disposal of earth as per direction of Engineer-in-charge.
Cement Concrete (1:3:6) with cement, coarse sand and 20 to 40mm size stone ballast in foundation of VRB by mechanical mixing
I-class brick work in 1:4 cement mortar up to 3.0 mt lift and 60.0 mt leaad of mix material
C.C. (1:2:4) cement, coarse sand and 12-20 mm size stone shingle in parapet wall top in coping including all cost of material, labour, T&P required for proper complition of work by manual mixing.
Centering & Shuttering for R.C.C. work including cost of centring and shuttering up to 3.0mt height
Supply of HYSD steel barincluding bending, binding cutting and placing in position including cost of winding wire in R.C.C. Slab
R.C.C 1:1.5:3 in Slab, wearing coat and coping with coarse sand, crushed agg. 12 to 20 mm size & cement including cost of all material labour taxes &carriage upto site of work all lead lifts for proper completion of work with mechanical mixing and used vibrator also
cement pointing 1:3 (Struck deep) on brick work
Brick soling with ist class brick laid on edge including preparation of subgrade to prescrived camber, filling joints with local earth the entire surface in bed level waterway of V.R.B.
Earth work in making diversion across branch for diverting traffic etc including cost of all material, labour and T&P etc. required for proper completion of work.
Dismantling of old damedge RCC Slab including stacking of dismantled material with in 60.0 mt. distance from site
Dismantling of old damedge B/W, including stacking of dismantled material with in 60.0 mt. distance from site
Dismentling of C.C. including base concrete and including stacking of material with in a distance of 60.0 m.
Readymade coloured cement paint in two coats on new surface with all material, labour, T&P etc.
M/S SHIV SHAKTI CONSTRUCTION COMPANY (BID ID -5451300)
PANACEA TECHNOLOGY (BID ID -5465560)
Lalit Kumar Rajani Thekedar (BID ID -5467651)
M/S G.S. CONSTRUCTION (BID ID -5467500)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf