| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate | |
| 2 | L2₹1.6 L+₹831.76 (0.51%)Rejected-Finance | L2 | Rejected-Finance High Rate | |
| 3 | L3₹1.7 L+₹4,892.70 (3.00%)Rejected-Finance | L3 | Rejected-Finance High Rate |
Tender Value
₹1.6 L
EMD Value
₹3,262
Closing Date
24 Jul 2026, 5:00 pmClosed
Assistant Engineer
OFFICE OF THE ASSISTANT ENGINEER, GOPIBALLAVPUR HIGHWAY SUB DIVISION, GOPIBALLAVPUR
Basinda Bridge guard railling repairing, rehabilitation, painting and allied works (at Ch. 6.00 Km) Gopiballavpur - Nayagram Road under Jhargram Highway Division in the district of Jhargram.
2026_WBPWD_5016729_1
WBPWRD/NIT-01/AE/GHSD/26-27
Open Tender
CIVIL WORKS
Percentage
15 days
Gopiballavpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,262
Yes
9 Sept 2026
13 Jul 2026
27 Jul 2026
16 Jul 2026
24 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD. (I) By Manual Means b) In area of thorny jungle | 0.09 | HECT | 60,286 | ₹5,425.74 |
| 2 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 15 | M3 | 166 | ₹2,490 |
| 3 | Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 rnm. true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 rnrn. leaving adequate space between vertical post for expansion, complete as per MoRT&H standard drawing no SD/202 and technical specifications. | 12.4 | MTR | 1,835 | ₹22,754 |
| 4 | Drainage Spouts in Superstructure including providing drip mouldings and also including supplying, fitting and fixing approved type of materials complete as per drawing and Technical specification vide clause no. 2705 of MoRT&H’s Specification for Road & Bridge Works. | 28 | NOS | 783 | ₹21,924 |
| 5 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (a) 25 mm thick plaster | 54.44 | M2 | 151.65 | ₹8,255.83 |
| 6 | Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. (b) M-20 Grade Using concrete mixer. | - | M3 | 5,814.97 | - |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. II. Other than SAIL/ TATA/RINL | - | MTR | 49,365.72 | - |
| 8 | Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint. b) Two Coats | 58.8 | M2 | 99 | ₹5,821.2 |
| 9 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor: (a) One Coat | 666.12 | M2 | 31.4 | ₹20,916.17 |
| 10 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor (Two Coat) a) Normal Acrylic Emulsion | 666.12 | M2 | 67 | ₹44,630.04 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Tendernotice_2.pdf
PDF • 1.27 MB
BOQ_5086423.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .