Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC WARISHPUR PURBA BARDHAMAN | PURBA BARDHAMAN | WEST BENGAL | 712134 | ₹5.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹5.1 L+₹4,591.18 (0.91%)Rejected-Finance | ₹5.1 L+₹4,591.18 (0.91%) | 2 | Rejected-Finance 2 |
| 3 | 3₹5.1 L+₹5,101.32 (1.01%)Rejected-Finance VILL DAURADANGA BHATAR PURBA BARDHAMAN | BHATAR | PURBA BARDHAMAN | WEST BENGAL | ₹5.1 L+₹5,101.32 (1.01%) | 3 | Rejected-Finance 3 |
Tender Value
₹5.1 L
EMD Value
₹10,203
Closing Date
18 Jun 2026, 6:30 pmClosed
EE_DWSD_PHE Dte
Fagupur_108 Shiv Mandir Road
Annual O and Mtc of distribution syste, rising main, sluice valves including operation of sulice valves at BANANABAGRAM PWSS under Durgapur W/S Division, PHE Dte (w.e.f. 01.07.2026 to 30.06.2027)
2026_PHED_1026803_6
01/2026-2027/EE/DWSD/PHE Dte
Open Tender
CIVIL WORKS
Percentage
365 days
Bananabagram
O and Mtc of different PWSS
2 documents required · 2 mandatory
₹10,203
17 Aug 2026
9 Jun 2026
22 Jun 2026
9 Jun 2026
18 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Opening & closing of all the different dia sluive valves (80mm. dia to 350mm. dia.) on different places along the alignment of the rising main and distribution main at different places over the command area daily as and when required for regulating the supply of water and distributing water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap/plug of wash out point or opening the sluice valves including de-jointing flange joints (80mm to 350mm dia.) including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, re-filling the excavated earth, taking out of RCC slab or slab cover and refaxing true to position etc. all complete as per the specification and direction of EIC. (Details of other conditions are enclosed as special conditions of tender) (1 No labour X 659/-(including ESI+EPF+Bonus+10% Agency profit ) X 365 days =365X1 Persons=Man days=365 man day. | 365 | /day/labour | 659 | ₹2,40,535 |
| 2 | Part-B for item 2 to 26 of work portion (Special conditions enclosed) schedule of Part-B uploaded | 1 | Item | 1,87,500 | ₹1,87,500 |
| 3 | 18% GST Rs | - | LS | - | - |
| 4 | 1% WBWF Cess Rs | - | LS | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Notice.pdf
Tender Documents • 1.48 MB
Schedule-Part-B items.pdf
Tender Documents • 0.21 MB
Special Conditions.pdf
Tender Documents • 0.46 MB
WBF_2911.pdf
Tender Documents • 0.53 MB
Annexure.pdf
Tender Documents • 0.68 MB
BOQ_2523022.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .