| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -0.20% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹11,431.68 (0.10%)Admitted-Finance | -0.10% | ₹1.1 Cr+₹11,431.68 (0.10%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹1.4 L (1.20%)Admitted-Finance | +1.00% | ₹1.2 Cr+₹1.4 L (1.20%) | L3 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
22 Jun 2026, 6:30 pmClosed
Executive officer
Nagar palika Parishad Ahraura, mirzapur 231301
Nagar Palika Inter collage ahraura mirzapur ka jirnodhaar
2026_DOLBU_1152044_1
34/Npp-Ahraura/2026-27
Open Tender
Civil Works
Percentage
365 days
Work
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
Eo
₹2.3 L
25 Jun 2026
23 May 2026
23 Jun 2026
23 May 2026
22 Jun 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantaling of building | 1 | Nos | 89,300 | ₹89,300 |
| 2 | Clearing and grubbing road land including oprooting wild vegetation, grass, bushes, shrubs, sapling and trees of girth up to 300mm, removai of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable to be used or auctioned up to a lead of 1000m including removal and disposal of top prganic soil not exceeding 150 mm in thickness as Technical Specification Clause 201 | 308 | sqm | 5.64 | ₹1,737.12 |
| 3 | Excavation in foundation in black cotton /kanker mixed soil including filling lift up to 1.50 m and lead up tto 30 m & including filling, watering and ramming of excavated each in to trenchs or into space between the building and the side of foundation trenchs or plinth and removal and disposal of surplus earth as directed by the Engineer -in-charge up to a distance of 30 m from the foundation trenches including all T&P phowarah and basked etc complete S I N0 252 | 136.36 | m3 | 128 | ₹17,454.08 |
| 4 | cement concrete with 4 cm, gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of all material, labour and T&P etc, required for proper completion S I N0 281 | 41.79 | m3 | 4,900 | ₹2,04,771 |
| 5 | R.C.R.Stone masonary work in 1:4 cementt coarse sand mortar including all material labour t&p etc compt up to plinth | 38.9 | m3 | 3,850 | ₹1,49,765 |
| 6 | E/Work in cutting or embankment in mixed soil /black cotton soil , excavation to be in the from or regular pits not exceeding 0.50 m in depth and earth work in embankment to be in 20 cm layer, including ramming & dressing the surface to required llevels and slopes and also including lift up to 1.50 m and lead up to 30 m The earth cutting to be used in making embankment or to be deposited as spoil by the banks within 30 m distance as directed by Engineer -in -charg S I N0 253 | 177.63 | m3 | 222.27 | ₹39,481.82 |
| 7 | Supply and laying of Local sand filling | 18.88 | m3 | 650 | ₹12,272 |
| 8 | Proving and injecting chemical for pre constructional anti termite treatment and creating chemical barrier around and under the coloumn pits ,wall trenches, base ment excavation,top surface if plinth filling, junction of wall and floor , along the external perimeter of binding ,expansion joints surrounding of pipes and conduit etccomplete( plinth area of the building at ground floor ony shall be measured as per IS 6313 PART II 1981) Aldrine emulsifiable concentrate or any other approved material such as Hepthchlor of Chlordane will be used as per PWD plinth area rate SOR | 193.69 | sqm | 230 | ₹44,548.7 |
| 9 | 1st class brick work in 4:1 fine sand and cement of 1.25 finesness modulus mortar in super structure including supply of all material, labour and tools and plants, required for proper completion of work S I N0 (305) | 2.28 | m3 | 5,617.6 | ₹12,808.13 |
| 10 | 1st class brick work in 4:1 fine sand and cement of 1.25 finesness modulus mortar in super structure including supply of all material, labour and tools and plants, required for proper completion of work S I N0 (305+309+310) | 138.87 | m3 | 6,097.6 | ₹8,46,773.71 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_2158123.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .