| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹4.5 L (4.08%)Admitted-Finance | ₹1.2 Cr+₹4.5 L (4.08%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MATRIEX SHELTERS L1 | MAHESWARAN J L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning W-0085 P-24 OF SOR-23-24 | 13,382 | m3 | 52.3 ₹6,99,878.6 Lowest | 55 ₹7,36,010 |
| 2.00 | Earthwork open excavation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and depositing the excavated earth within the compound in places shown by departmental officers with an initial lead of 10m and lift of 2m and clearing and leveling etc. complete Upto 2.00m Depth | 537 | m3 | 186.5 ₹1,00,150.5 Lowest | 190 ₹1,02,030 |
| 3.00 | Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 108 | m3 | 1,548 ₹1,67,184 Lowest | 1,550 ₹1,67,400 |
| 4.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 108 | m3 | 4,870 ₹5,25,960 Lowest | 5,000 ₹5,40,000 |
| 5.00 | Supply and fixing of G.I pipe 32mm dia (b class) including cutting and fixing into kerb wall for 30cm depth including fixing weld mesh 7.50cm x5.00cmx10gauge and fixing welding with M.S flat 45x6mm at middle including conveyance etc ., completed | 3,580 | m | 1,200 ₹42,96,000 Lowest | 1,250 ₹44,75,000 |
| 6.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 1,969 | m2 | 453.5 ₹8,92,941.5 Lowest | 470 ₹9,25,430 |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 443 | m3 | 6,226 ₹27,58,118 Lowest | 6,500 ₹28,79,500 |
| 8.00 | Goods and Service Tax @ 18% | 1 | L.S. | 16,99,241.87 ₹16,99,241.87 Lowest | 17,68,566.6 ₹17,68,566.6 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
6 Feb 2024, 3:00 pmClosed
THE COMMISSIONER ATTUR MUNICIPALITY
THE COMMISSIONER ATTUR MUNICIPALITY
Water Bodies rejuvenation at Ayyanarkovil Eri at Ward No ATSNo 4 Block No 0007 in Attur Municipality
2024_MAWS_411231_1
2753/2023/e1
Open Tender
Civil Works - Others
Works
360 days
ATTUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.1 L
ATTUR MUNICIPALITY
12 Feb 2024
20 Jan 2024
6 Feb 2024
20 Jan 2024
6 Feb 2024
20 Jan 2024
30 Jan 2024
Amount
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning W-0085 P-24 OF SOR-23-24
Earthwork open excavation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and depositing the excavated earth within the compound in places shown by departmental officers with an initial lead of 10m and lift of 2m and clearing and leveling etc. complete Upto 2.00m Depth
Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supply and fixing of G.I pipe 32mm dia (b class) including cutting and fixing into kerb wall for 30cm depth including fixing weld mesh 7.50cm x5.00cmx10gauge and fixing welding with M.S flat 45x6mm at middle including conveyance etc ., completed
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Goods and Service Tax @ 18%
MAHESWARAN J
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_489355.xls
BOQ • 0.28 MB
BIDD.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .