| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.3 LAccepted-AOC | L1 | Accepted-AOC DUE TO L1 | |
| 2 | L2₹42.0 L+₹1.7 L (4.20%)Rejected-Finance | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹42.7 L+₹2.4 L (5.96%)Rejected-Finance | L3 | Rejected-Finance Due to L3 | |
| 4 | L4₹46.0 L+₹5.7 L (14.2%)Rejected-Finance | L4 | Rejected-Finance Due to L4 | |
| 5 | L5₹46.6 L+₹6.3 L (15.7%)Rejected-Finance | L5 | Rejected-Finance Due to L5 |
Tender Value
Refer Docs
EMD Value
₹97,000
Closing Date
24 Dec 2021, 2:00 pmClosed
SE IWC MIRZAPUR
SE IWC IRRIGATION COLONY,FATHA, MIRZAPUR
RECONSTRUCTION OF WEIR AT LAKHANIYA DARI.
2021_UPIDC_658196_1
NIT09/SE/2021-22
Open Tender
Civil Works - Water Works
Item Rate
180 days
LAKHANIYA DARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹97,000
31 Mar 2022
17 Dec 2021
24 Dec 2021
17 Dec 2021
24 Dec 2021
17 Dec 2021
Amount
Providing & Laying of Plan Cement Concrete in 1:3:6 in foundation with cement ,coarse sand of F.M. more than 2.2 & 25 mm to 40 mm size stone ballest including cost of all materialal , labour & T.&P. etc required for proper completion of work.
Providing & Laying R.C.C. (1:1.5:3) with cement ,coarse sand of F.M. not less than 2.0 and crushed hard stone grit of size 4.75 to 20 mm including cost of all material , labour and T&P. etc required for proper completion of work.
Cutting ,bending ,binding and placing of reinforcement including cost of all material, labour and T&P. etc . required for peoper completion of work.
Centering and shuttering for work including cost of all material ,labour and T&P. etc. required for proper completion of work.
Excavating lime stone ,sand stone or other soft rock by pick axex but not required blasting including lift upto 1.5 m & lead upto 30 m
Supplying & Dumping stone boulder in bed including cost of all material ,labour and T&P. etc. required for proper completion of work.
Dumping loose stone boulder in bed including cost of all material ,labour and T&P. etc. required for proper completion of work.
Cement grouting under pressure excluding cost of cement but including cost of all material ,labour and T&P. etc. required for pressure grouting in existing approach channel at different places to prevent seepage / leakage during running water.
M/S UDBHAV CONSTRACTION
SHREYA CONTRUCTION
RAMPYARE SINGH
M/S LALMANI MAURYA
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .