| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr Quoted ₹87.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹88.8 L+₹1.3 L (1.47%)Rejected-Finance | ₹88.8 L+₹1.3 L (1.47%) | L2 | Rejected-Finance L2 is Repsonsive for tender |
Tender Value
₹1.0 Cr
EMD Value
₹62,000
Closing Date
28 Nov 2023, 5:45 pmClosed
Fit Person A/M Thirumoolanathaswamy Temple
Fit Person A/M Thirumoolanathswamy Temple Vallanadu
Repair and Restoration work of Thirumoolanatha swamy Temple, Vallanadu, Srivaikundam Taluk, Thoothukudi District Thirupani Work
2023_HRCE_391144_1
03/2023
Open Tender
Civil Works
Lump-sum
365 days
Vallanadu
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹62,000
Yes
2 Feb 2024
20 Nov 2023
29 Nov 2023
20 Nov 2023
28 Nov 2023
21 Nov 2023
Amount
Clearing the heavy jungle clearance et., complete as directed by departmental officer
Dismantling the existing plain cement concrete including clearing away from the site etc., complete as directed by departmental officer
Earth work excavation for foundation in all aoils and sub-soils and to full depth as may be directed except to rock requiring blasting but including shoring strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well consolidated and depositing the surplus earth within the compound with an initial lead of q0 metres and lift of 2 metres in places as shown by the department officers and clearing levelling the site etc complere complying with standard specification
Cement concrete 1:5:10 (One cement five CS sand and Ten aggregate) using 40mm gauge hard granite broken stone jelly for foundation including cost and conveyance of all materials labour for mixing, laying, compacting, curing, dewatering, side shuttering wherever necessary including curing etc., complete complying with standard specification
Brick work in Lime mortar 1:2 ( One lime two CS sand) using quality of second class country brick 8 3/4" X 4 1/2" X2 3/4" for foundation and basement including curing etc., complete complying with standard specification.
Plastering with Lime mortar 1:4, ( One lime four CS sand) 20mm thick including cost and conveyance of all materials and all labour charges etc complete.
Painting two coats with approved quality of water based exterior emulsion paint including one coat of priming coat in cement plastered wall surfaces in all floor including cost of all materials brushess, etc., scaffolding charges etc., complete complying with standard specification and as directed by the departmental officers.
Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm thick well remmed watered and consolidated as directed by the departmental officers etc., Complete complying with standard specifications.
Supplying and laying Cutstone flooring using cut stone slab 600 x 600mm and not less than 100 mm thick top three line dressed and pointing with Lime mortar 1:5 etc completewith standard specifications..
Scaraping the existing damaged lime plaster including clearing away from the site etc complete as directed by departmental officer
Restoration by providing water wash and appropriate methodology to restore the originalities of the existing cutstone structures inclusive of necessary scaffolding charges, conveyance and all hire charges for all tools and plants and clearing the site after completion of work etc., complete.
Pointing with Lime mortar 1:3 (One Lime and three CS sand) including cost and conveyance of all materials and all labour charges etc complete complying with standard specification.
Scaffolding charges for Vimanams and gopurams with casurina posts coconut of palm trees wherever necessary for main, form work and providing with coconut keeth convering, providing ladder arrangements, country wood plant for working, inspection etc., complete. For 15' height
Providing vargapoochu, over the corewalls of vimanams/ Gopurams, with Lime mortar 1:4 complete including shaping the mukhapathram, mahanasi, koodu all ornamentals works to proper shape by embedding broken bricks of shaped/ chiseled bricks, rough-plastering with CM 1:4 and finishing with final ornamental plastering and nayam threevai including cost and conveyance of all materials, all working in height curing with water etc., complete including all extra for folding and including clearing the debris from the vimanams/ Gopuram 100 sft., superficial area.
Paintingwith Egavaranam good emulsion paints complete for the Vimanas/ paints complete for the Vimanas/ Gopurams inclduding cost and conveyance of all materials, labour charges including painter, working in heights, lifting of material cost of brushes etc., complete, which include all extra for foldings.
Manufacturing, Supplying and fixing of stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick at required locations toa height of 90mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00mm thick as vertical at 900mm centre with 2 Nos of 25mm dia intermediate horizontal stainless steel pipe of 1.60mm thick in between. The vertical pipe has to be welded to the 100 x 100 x 6mm Ms base plate encased in the base concrete for cutting , bending , welding, grinding, polishing, conveyance, electrical charges, etc, complete
Labour charges for Removing the existing old Cutstone members including numbering, wire charges, tools and plants, scaffolding for working in heights etc complete, as directed by departmental officer
Thirumathil
Flooring
Labour charges for palamunai Dressing the old pavukal, Uthiram Floor slab etc., as directed and fixing the same in position with Combination mortar including all labour charges for dressing and fixing in posision as dircted etc complete.,as directed by departmental officer
Dismantling the Existing Damaged Brick work in lime mortar including clearing away from the site etc complete as directed by departmental officer
Labour charges for Refixing the old cutstone members including hire charges for tools and plants, scaffolding for working in heights and fixing in position including cost and conveyance of all materials and all labour charges etc complete. as directed by departmental officer
Painting two coats for old wook with best approved quality synthetic enamel paint including a thourgh scrapping and priming coat with ready mixed primer of approved quality including cost of primer etc. complete in all floors. The rate shall include cost of all materials, taxes brushes scaffolding charges and labour charges for painting etc. complete complying with standard specification. (The make and colour of paint to be used should be gor approved by the departmental officers before use on works)
Supplying fixing of temple type door using teak wood for scantling and planks including cost and conveyance of all materials and all labour charges etc complete.as directed by departmental officer
Painting two coats over new wood work with best approved quality synthetic enamel paint including a priming coat with ready mixed primer of approved quality including cost of primer etc. complete in all floors. The rate shall include cost of all materials, taxes brushed, scaffolding charges and labour charges for painting etc. complete complying with standard specification. (The make and colour of paint to be used should be gor approved by the departmental officers before use on works)
SRINIVASA THEVAR BALAKRISHNAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_466080.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .