| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-Finance 171 GLOBEL SPACE HUDA GLOBEL SPACE COLONY 125055 | SIRSA | HARYANA | 125055 | L1 | Accepted-Finance L1 | |
| 2 | L2₹2.4 L+₹1,729.20 (0.73%)Accepted-Finance | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | VIKAS CONSTRUCTION COMPANY L1 | SHREE ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | E/w in silt clearance lead upto 6 m & lift upto 1.50 m By Hydrolic excavator (JCB) i/c all cost of material, labour, machine & T&P etc for Proper completion of work | 2,584 | M³ | 38 ₹98,192 Lowest | 40 ₹1,03,360 |
| 2.00 | Dressing of Excavated Silt/Earth i/c all cost labour, T&P & ramming, compaction for Proper completion of work. | 2,584 | M³ | 5.6 ₹14,470.4 Lowest | 6 ₹15,504 |
| 3.00 | E/W in Silt clearance including extra slush and lehal By Hydrolic excavator (JCB) including lift upto 1.5m and lead upto 1/2 km i/c all cost of material, labour, machine & T&P etc for Proper completion of work. | 870 | M³ | 124 ₹1,07,880 | 119 ₹1,03,530 Lowest |
| 4.00 | Cleaning thick bushes & throny jungle without uprooting with disposal | 806 | M² | 4.4 ₹3,546.4 | 4 ₹3,224 Lowest |
| 5.00 | Videography/Photography of silt clearance works in canal and drains before, during and after silt clearance by DRONE as per requirement including supply of Videography/ Photography in Pen Drive and vehicles for movement as per direction of Engineer in charge. | 4.85 | km | 1,650 ₹8,002.5 Lowest | 1,650 ₹8,002.5 Lowest |
| 6.00 | Providing & fixing signboard size 3'x4' with Blue surface, edge & letter color on iron sheet etc. complete | 1 | No | 4,000 ₹4,000 Lowest | 4,200 ₹4,200 |
Tender Value
₹2.4 L
EMD Value
₹5,000
Closing Date
5 Oct 2026, 11:00 amClosed
EE UDEYC, Saharanpur
Office of the EE UDEYC, Saharanpur
Silt Clearance Of Internal Section Of Meghchhapar Dy. From Km 0.000 To Km 4.850 In District Saharanpur
2026_UPIDC_1190937_12
03/EE/UDEYC/2026-27
Open Tender
Civil Works - Canal
Item Rate
25 days
Meghchhapar Dy.
Please refer Tender documents.
2 documents required · 2 mandatory
₹589
₹5,000
Office of the EE UDEYC, Saharanpur
17 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/w in silt clearance lead upto 6 m & lift upto 1.50 m By Hydrolic excavator (JCB) i/c all cost of material, labour, machine & T&P etc for Proper completion of work | 2,584 | M³ | - | - |
| 2 | Dressing of Excavated Silt/Earth i/c all cost labour, T&P & ramming, compaction for Proper completion of work. | 2,584 | M³ | - | - |
| 3 | E/W in Silt clearance including extra slush and lehal By Hydrolic excavator (JCB) including lift upto 1.5m and lead upto 1/2 km i/c all cost of material, labour, machine & T&P etc for Proper completion of work. | 870 | M³ | - | - |
| 4 | Cleaning thick bushes & throny jungle without uprooting with disposal | 806 | M² | - | - |
| 5 | Videography/Photography of silt clearance works in canal and drains before, during and after silt clearance by DRONE as per requirement including supply of Videography/ Photography in Pen Drive and vehicles for movement as per direction of Engineer in charge. | 4.85 | km | - | - |
| 6 | Providing & fixing signboard size 3'x4' with Blue surface, edge & letter color on iron sheet etc. complete | 1 | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.53 MB
03BOOKLATESilt.pdf
Tender Documents • 5.84 MB
BOQ_2245373.xls
BOQ • 0.26 MB
CorrigendumForDate01.pdf
Additional Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .