Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-Finance BATHINDA | BATHINDA | PUNJAB | 151001 | ₹7.9 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹8.4 LAccepted-Finance | ₹8.4 L | L2 | Accepted-Finance 2nd Lowest Bidder |
Tender Value
₹8.6 L
EMD Value
₹17,162
Closing Date
27 Apr 2026, 12:00 pmClosed
Executive Engineer
Construction Division No. 2 PWD B and R Bathinda
Construction of Retaining Wall and Toe wall at Bajak to Ghudda Road
2026_CEPW_166285_1
C2/72
Open Tender
Civil Works - Buildings
60 days
Bathinda
Please refer tender documents
3 documents required · 3 mandatory
₹5,000
₹17,162
Yes
5 May 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Subhead-1: CONST. OF (8.00 Feet) (2.44 Mtrs) HIGH BRICK WORK RETATINING WALL | - | - | - | - | 1 |
| 2 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. as per CSR 6.6 | - | Cum | - | - | 2 |
| 3 | Cement concrete 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type 10.12 a(ii) | - | Cum | - | - | 3 |
| 4 | First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth as per CSR 11.7 | - | Cum | - | - | 4 |
| 5 | Plain Cement Concrete 1:2:4 complete as per CSR 10.12 | - | Cum | - | - | 5 |
| 6 | 12.5 mm thick cement plaster 1:4 as per technical specification CSR 15.9 | - | Sqm | - | - | 6 |
| 7 | Supplying and Fixing of 4" dia PVC pipe for weep Holes (CSR 21.35) | - | Mtr | - | - | 7 |
| 8 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) as per CSR 9.1 | - | Sqm | - | - | 8 |
| 9 | Subhead-2: CONST. OF (5.5 Feet) (1.68 Mtrs) HIGH BRICK WORK RETATINING WALL | - | - | - | - | 9 |
| 10 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. as per CSR 6.6 | - | Cum | - | - | 10 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
DNIT.pdf
Tender Documents • 9.14 MB
BOQ_337437.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid