| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 CrAccepted-AOC K 4 FIVE STAR INDUSTRIAL AREA MIDC BUTIBORI NAGPUR 441 122 | NAGPUR | NAGPUR | MAHARASHTRA | 441122 | ₹2.0 Cr | L-1 | Accepted-AOC L1 Bidder |
| 2 | L-2₹2.0 Cr+₹1.8 L (0.88%)Rejected-AOC PLOT NO 41 SECTOR D BAGRODA INDUSTRIAL AREA BHOPAL MP 462026 | BHOPAL | MADHYA PRADESH | 462026 | ₹2.0 Cr+₹1.8 L (0.88%) | L-2 | Rejected-AOC L2 Bidder |
| 3 | L-3₹2.5 Cr+₹48.3 L (23.8%)Rejected-Finance SP 52 MPPGCL COLONY BIRSINGHPUR DISTT UMARIA 484 552 M P | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | ₹2.5 Cr+₹48.3 L (23.8%) | L-3 | Rejected-Finance L3 Bidder |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
5 Mar 2022, 3:30 pmClosed
ADDL CE(P AND W),SSTPP
ADDL CE(P AND W),SSTPP
Annual Overhauling of Boiler Pressure part of unit 1and2 at 2x600MW, SSTPP, MPPGCL, Dongalia, Distt -Khandwa (M.P).
2021_MPPGC_166858_1
WT - 1515
Open Tender
Miscellaneous Works
Item Rate
60 days
ADDL CE(P AND W), SSTPP
As per NIT
19 documents required · 19 mandatory
₹5,000
Yes
₹2.1 L
Yes
24 Feb 2023
14 Jan 2022
7 Mar 2022
14 Jan 2022
5 Mar 2022
14 Jan 2022
SECTION-A1 Cleaning of Boiler
COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM ( FROM BOILER LIFT TO FD/PA FAN)
INTERNAL CLEANING OF BOILER IN IIND PASS
CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS
CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER
CLEANING OF EMEGENCY COOLING WATER SUPPLY TANK FOR BCW MOTOR
BOTTOM ASH HOPPER CLEANING
SECTION-A2 Preparation of Scaffolding
PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES)
PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER.
PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM TOP TO BOTTOM)
PREPARATION & OPERATION OF SKY CLIMBER IN FURNACE
PREPARATION OF SCAFFOLDING AT WW RING HEADER FOR INSPECTION OF RING HEADER & REFIXING/REPLACEMENT OF STRAINERS & ORIFICES.
Preparation of Scaffolding in Wind BOX
PREPARATION OF SCAFFOLDING IN CAT HOUSE FOR FRONT/REAR S-PANEL BACKSIDE CHECKING, REPAIRING
Preparation of Scaffolding in Bottom Ash Hopper
SECTION-A3 Inspection
INSPECTION OF COMPLTE BOILER PRESSURE PARTS (IST & IIND PASS)
INSPECTION AND REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER
HEADER INSPECTION & INSPECTION OF SPRAY NOZZLE ATTEMPERATOR
INTERNAL INSPECTION & CLEANING OF BOILER DRUM
CLEANING AND REPAIR OF WIND BOX
(i) WITH STEEL
(ii) WITHOUT STEEL
REPLACEMENT OF WIND BOX ROOF
(i) WITH STEEL
(ii) WITHOUT STEEL
SERVICING OF SECONDARY AIR DAMPERS
Dye Penetration Test (DP Test) With Kit
Transportation of Ash, Scraps, Debries and other waste materials ( including loading/unloading)
SECTION-A4 HYDRO JET CLEANING OF COMPLETE BOILER PRESSURE PARTS
DIVISIONAL /PRIMARY SUPERHEATER COILS
PLATEN SUPERHEATER COILS
RE-HEATER COILS
WATER WALL (FRONT, REAR, LEFT & RIGHT)
SECTION-B
ASSISTANCE IN THICKNESS MEASUREMENT OF BOILER TUBES, RADIOGRAPHY, OXIDE SCALE MEASUREMENT & STRESS RELEIVING
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE IN VARIOUS AREAS OF BOILER TUBES.
RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.
EROSION SHIELD
(i) FABRICATION & FIXING OF EROSION SHIELD
(ii)REMOVAL OF EROSION SHIELD
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY & OXIDE SCALE MEASUREMENT /STRESS RELIEVING
WELDING OF HP JOINTS OF BOILER TUBES
WATER WALL TUBES-SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.
REPLACEMENT OF WW BURNER TUBES
DIVISIONAL SUPERHEATERS TUBES
PLATEN SUPERHEATER TUBES
LTSH TUBES
ECONOMISER SUPPORT TUBES
SUPERHEATER /LTSH SUPPORT TUBES
SUPERHEATER STEAM COOLED SPACER TUBES
ROOF TUBES
PENDENT REHEATER FRONT & REAR
REHEATER CROSS OVER TUBES
REHEATER STEAM COOLED TUBES
LOWER/UPPER CORNER TRANSITION TUBES
ECONOMISER TUBES
HYDRASTEP
INSTRUMENT PIPING
WELDING OF FIN
RE-ENFORCEMENT OF WELDED JOINTS
ECONOMISER
REHEATER
DRUM VENT
LTSH/SUPERHEATER
WELDING & REPLACEMENT OF DRAIN JOINTS
WELDING & REPLACEMENT OF TRACING LINE/SAMPLING LINE ( 15 NB TO 30 NB JOINTS)
PAD WELDING OF TUBES OF VARIOUS SIZES
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MMX50MM)
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MMX100 MM)
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MMX150 MM)
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MMX300 MM)
ALIGNMENT OF COILS/TUBES/BLOWERS
ALIGNMENT OF TUBES OF SH DIVISIONAL PANEL
ALIGNMENT OF TUBES OF PLATEN SUPERHEATERS
ALIGNMENT OF COIL OF ECONOMISER (UPPER/MIDDLE/LOWER)
ALIGNMENT OF COIL OF LTSH (UPPER/MIDDLE/LOWER)
ALIGNMENT OF REHEATER COIL (FRONT/REAR)
ALIGNMENT OF WALLBLOWERS/SERVICING OF WALL BLOWERS
ALIGNMENT /SERVICING OF LONG RETRACTABLE SOOT BLOWER
CHECKING AND RECTIFICATION OF EXPANSION INDICATOR IN BOILER AREA
ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PARTS & PREPARATION FOR BOILER LIGHT UP
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (Gr.A+Gr.C)
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (Gr.A)
REAR ARCH
SOOT BLOWER AREA
OTHER LOCATIONS
BURNER MOUTH
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (Gr.C)
PENT HOUSE , DOORS & WINDOWS, MAN HOLE & PEEP HOLE ETC.
DEAD CHAMBER & SCREEN WALL
Flue GAS EROSION PLATE OF LTSH & ECO BEND
COOLING PIPE OF SEAL PLATE
OTHERS AREAS ( LIKE HOPPER HEADER ETC.)
REMOVAL/BREAKING OF DAMAGED REFRACTORY & TRASPORTATION
SECTION -C COMPLETE SERVICING/OVERHAULING OF HP VALVES
GLAND PACKING OF HP VALVES
Upto 25 mm
25 mm to 50 mm
50mm to 100 mm
100 mm to 200 mm
Above 200 mm
COMPLETE SERVICING OF VALVES/NRV (EXCLUDING ACTUATOR):
Upto 25 mm
25 mm to 50 mm
50 mm to 100 mm
100 mm to 200 mm
Above 200 mm
REPLACEMENT OF VALVES/NRV (WELDED TYPE)
Upto 25 mm
25 mm to 50 mm
50 mm to 100 mm
100 mm to 200 mm
SERVICING OF MAIN STEAM STOP VALVES
SECTION -D COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES
BOILER DRUM SV
MAIN STEAM LINES SV
CRH LINES SV
HRH LINES SV
ELECTROMATIC RELIEF VALVE AND PILOT VALVE
CLEANING /REPAIRING OF SAFETY VALVE DRAIN TRAY & LINE
ASSISTANCE IN SAFETY VALVE SETTING
SECTION -E
PREPARATION OF HP TUBE BENDS
REPAIR AND RE-FIXING OF SEAL PLATES/COOLING PIPE OF WATER WALL S-PANEL AT TROUGH SEAL.
REPAIR AND RE-FIXING/LAYING OF REFRACTORY ON COOLING PIPE OF BOTTOM ASH HOPPER.
REPAIR OF PENT HOUSE OF BOILER
Repair of Pent house by patching (without Steel)
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
REPAIRING OF DEAD CHAMBER
Repair of Dead Chamber by patching
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
REPAIRING OF ECONOMISER HOPPERS & CONNECTION JOINT DUCTING & MAKING / STREGHTHEN OF THEIR PLATFORMS
REPAIRING OF ECONOMISER CASING
REPAIRING OF BOTTOM ASH HOPPER LINER & SEAL TROUGH INCLUDING FIXING OF DIPPER PLATE
REPAIRING OF FURNACE ZONE & REST OF THE AREAS
WITH STEEL
WITHOUT STEEL
DISMANTELING , INSTALLATION, FABRICATION OF STRUCTURES & MISC. WORKS I.E. CANOPY, BROKEN STAIR/RAILING/DRAIN COVERING
SERVICING , CLENING & REPAIRING OF SAMPLING LINE COOLERS
SERVICING & REPAIRING OF HANGERS & SUPPORTS
SECTION -F
FIXING OF CORROGATED GI SHEET AT BOILER ROOF & OTHER PLACES
SUPPLY OF CORRUGATED SHEET [Size- 1.2mm (Thk.)X750mm (Width)X2500 mm(LENGTH)]
ECONOMISER INLET NON-RETURN VALVE (NRV) (SIZE-550 MM)
PAINTING OF BOILER BASE STRUCTURES
DISPOSAL OF RUBBISH THERMAL INSULATION
SHIFTING OF ECONOMISER COIL FROM ITS POSITION TO ABOVE ECONOMISER HOPPER LEVEL AND AFTER CHECKING & REPAIRING POSITIONING OF SAME
INSULATION WORK
REMOVAL/APPLICATION OF THERMAL INSULATION IN COMPLETE BOILER FROM BOTTOM ASH HOPPER Tom PENT HOUSE
REMOVAL/APPLICATION OF THERMAL INSULATION IN STEAM AND WATER PIPING
REMOVAL/APPLICATION OF THERMAL INSULATION IN ESP
REMOVAL/APPLICATION OF THERMAL INSULATION IN AIR HEATERS & HOPPERS
COAL MILL, FUEL OIL AND ITS STEAM PIPING INCLUDING HEATERS FILTERS ETC.
FLUE GAS & HOT AIR DUCT
SUPPLY OF NEW PLAIN AL SHEET OF 22 G
SHEETING WORK OVER INSULATION (WHERE INSULATION IS IN GOOD CONDITION)
UNITED ENGINEERING
K K POWER CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .