Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.1 LAdmitted-Fee/PreQual/Technical/Finance | -6.30% | ₹28.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹29.9 L+₹1.7 L (6.19%)Admitted-Fee/PreQual/Technical/Finance | -0.50% | ₹29.9 L+₹1.7 L (6.19%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
11 Aug 2026, 4:00 pmClosed
EXEN CRD SMC
EXEN CRD SMC
Macdamisation of inner link road from Main road khayam to imam bargah tangbagh nowpora annd Macdamisation of allied link roads near STP Baba Demb road.
2026_HAUDD_319486_6
ENIT/34/CRD/SMC/DT.04-08-2026
Open Tender
Civil Works
Percentage
15 days
BABA DEMB
REFER TENDER DOCS
2 documents required · 2 mandatory
₹1,100
MUNICIPAL ACCOUNT
₹60,000
19 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 20 | No. | 20 | ₹400 |
| 2 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material upto a lead of 1 kilometer, as per direction of Engineer-in-charge complete. | 15.52 | Cum | 336.3 | ₹5,219.38 |
| 3 | P/L, in position cement concrete of specified grade including curing but excluding the cost of centering & shuttering. All work up to plinth level in 1:4:8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed) all inclusive leads, lifts, loading, un-loading, head load (if any) cost and carriage of material involved complete. | 4.28 | Cum | 5,500 | ₹23,540 |
| 4 | P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to plinth level in grade 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate of 20 mm Nominal size (Crushed) including all leads, lifts, loading, unloading, head load (if any) costs and carriages complete. | 31.05 | Cum | 7,600 | ₹2,35,980 |
| 5 | Centering & Shuttering including strutting propping etc. and removal of the form work for foundation, footings bases of columns blocks etc. complete. | 7.76 | Sqm | 286.35 | ₹2,222.08 |
| 6 | Providing and laying in position hot sealing compound for expansion joints etc. using grade “A” sealing compound complete. | 1,530 | Cum | 3.8 | ₹5,814 |
| 7 | Surface dressing of ground including removing vegetation and inequalities, not exceeding 15cm deep and disposal of the rubbish beyond SMC limits in all kinds of soils including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. | 778.95 | Sqm | 24.12 | ₹18,788.27 |
| 8 | Providing, Laying, Spreading & Compacting graded stone aggregate (size range 53mm to 0.075mm) to wet mix macadam (WMM) specifications including mixing the material with water at OMC mechanical mixer plant carriage of mixed material by Tipper at site with all leads and lifts laying in uniform layers in sub base/ base course on a well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density complete as per technical specification of clause 406.(75mm thick compacted). | 75 | Cum | 1,885.95 | ₹1,41,446.25 |
| 9Providing and applying tack coat using hot straight run bitumen of VG 10 grade including heating the bitumen and spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc and finally brooming the surface as per required specification. (Including cost & carriage of all materials involved upto site of work complete). | |||||
| 9.1 | On WBM surface using tar @0.75kg/sqm. | 1,000 | Sqm | 74.35 | ₹74,350 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_1058506.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .