Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC | L1 | Accepted-AOC Lowest amount Quoted tenderer | |
| 2 | L2₹21.2 L+₹63,352.94 (3.08%)Rejected-AOC | L2 | Rejected-AOC Highest amount Quoted tenderer |
| Sl No | Description | Qty | Unit | Thulasi L1 | RADISHKUMAR L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete Km 0/0-0/432 | 311.04 | Sqm | 6 ₹1,866.24 Lowest | 6 ₹1,866.24 Lowest |
| 2.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher Km 0/0-0/432 | 165.13 | Cum | 2,441 ₹4,03,082.33 Lowest | 2,514 ₹4,15,136.82 |
| 3.00 | Applying Prime coat over WMM surface ( treated with primer) using 7Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification Km 0/0-0/432 | 1,651.25 | Sqm | 84 ₹1,38,705 Lowest | 87 ₹1,43,658.75 |
| 4.00 | Providing and laying Bituminous Macadam with Central Hot Mix Plant 20-30T capacity, using crushed aggregates of grading as per table 500.4 premixed with bituminous binder , transported to site upto lead of 1000m laid over a previously prepared surface Plastic aste Km 0/0-0/432 | 82.56 | Cum | 8,453 ₹6,97,879.68 Lowest | 8,707 ₹7,18,849.92 |
| 5.00 | Applying tack coat over Primer surface using 2.5 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification Km 0/0-0/432 | 1,651.25 | Sqm | 19 ₹31,373.75 Lowest | 20 ₹33,025 |
| 6.00 | BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and onsolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-05 Km 0/0-0/432 | 41.28 | Cum | 10,765 ₹4,44,379.2 Lowest | 11,088 ₹4,57,712.64 |
| 7.00 | Filling gravel for shoulders and berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete | 51.84 | Cum | 464 ₹24,053.76 Lowest | 478 ₹24,779.52 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 3,13,441.19 ₹3,13,441.19 Lowest | 3,23,105.2 ₹3,23,105.2 |
Tender Value
₹20.7 L
EMD Value
₹20,800
Closing Date
24 Dec 2025, 3:00 pmClosed
Block Development Officer(BP),Madhuranthagam Block
Block Development Office, Madhuranthagam Block
Providing BT road in Gendirachery to Vadakku Colony(417m) at Gendirachery Panchayat in Madhuranthagam Block Under 15th SFC (Block Panchayat Untied Grant 40Percent) Fund for the year 2025-26
2025_RDTN_633749_1
Rc.No.1011/2025/A6 AD(Pt) Dated 03.12.2025
Open Tender
Civil Works - Roads
Item Rate
90 days
Gendirachery to vadakku colony
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,800
Yes
9 Jan 2026
18 Dec 2025
24 Dec 2025
18 Dec 2025
24 Dec 2025
18 Dec 2025
Amount
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete Km 0/0-0/432
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Using Paver Finisher Km 0/0-0/432
Applying Prime coat over WMM surface ( treated with primer) using 7Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification Km 0/0-0/432
Providing and laying Bituminous Macadam with Central Hot Mix Plant 20-30T capacity, using crushed aggregates of grading as per table 500.4 premixed with bituminous binder , transported to site upto lead of 1000m laid over a previously prepared surface Plastic aste Km 0/0-0/432
Applying tack coat over Primer surface using 2.5 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification Km 0/0-0/432
BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and onsolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-05 Km 0/0-0/432
Filling gravel for shoulders and berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RADISHKUMAR (BID ID -1544632)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_758273.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_758273.xls
BOQ • 0.32 MB
Technical3.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .