Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.1 L+₹26,454.20 (6.86%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.3 L+₹43,716.10 (11.3%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.4 L+₹55,434.54 (14.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹4.6 L+₹74,591.03 (19.3%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹7.0 L
EMD Value
₹14,040
Closing Date
8 Jul 2026, 4:00 pmClosed
Er. Mohd Qasim
Executive Engineer PWD R and B Division Billawar
Please refer in BOQ
2026_PWDJK_314313_3
e-NIT No 43 of 2026-27 dated 02-07-2026
Open Tender
Civil Works
Percentage
90 days
Billawar
Please refer Tender documents
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division Billawar
₹14,040
14 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: A) All kinds of soil. | 28.08 | Cum | 256.85 | ₹7,212.35 |
| 2 | Providing and laying in position cement concrete of specified grade excludingthe cost of centring and shuttering - All work upto plinth level. 1:5:10 (1 cement:5 fine sand : 10 graded stone aggregate 40mm nominal size) | 4.68 | Cum | 4,826.5 | ₹22,588.02 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:A)1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) with 20% boulders. | 42.12 | Cum | 4,774.46 | ₹2,01,100.26 |
| 4Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 4.01 | Foundation, Footings, bases of columns etc. for mass concrete. | 187.2 | Sqm | 286.35 | ₹53,604.72 |
| 5 | Supplying, sorting and spreading of (River Bed Material) R.B.M. as per instructions of the Engineer-in-charge including all leads and lifts carriage of material by M.T. (complete job). (LMR) | 136 | Cum | 500 | ₹68,000 |
| 6 | Supplying and stacking at site Graded curshed stone agregate of size 63mm to 45mm | 135 | cum | 1,204.15 | ₹1,62,560.25 |
| 7 | Supplying and stacking at site Stone Screening of size 13.2 mm nominal size (Type A) | 30.38 | cum | 1,204.15 | ₹36,576.06 |
| 8 | Supplying and stacking at site Stone/ crusher Dust. | 10.8 | cum | 770 | ₹8,316 |
| 9 | Laying spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/ vibratory roller 8-10 tonne cpacity in stages to proper grade and camber, applying and brooming requiste type of screening/ binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | 135 | cum | 768.15 | ₹1,03,700.25 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_1017760.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .