Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAdmitted-Finance | ₹6.4 L | L1 | Admitted-Finance |
| 2 | L2₹9.7 LAdmitted-Finance RIVER SIDE BHURKUNDA RAMGARH JHARKHAND | RAMGARH | RAMGARH | JHARKHAND | ₹9.7 L | L2 | Admitted-Finance |
| 3 | L3₹9.8 LAdmitted-Finance | ₹9.8 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SUMIT KUMAR ROY L1 | M/S DK ENTERPRISES L2 | M/S ASHWANI ENERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Repairing of 3000 GPM pump including
1. Repairing of casing
2. Repairing of impellers
3. Repairing of shaft
4. Fabrication of split glands
5. Fabrication of neck rings
6. Repairing of bearing housing
7. Fabrication of coupling
8. Repairing of stuffing box
9. Fabrication of coupling guard
10. Fabrication of shaft sleeves
11. Trial run and testing at site | 1 | job | 3,35,000 ₹3.4 L | 6,25,800 ₹6.3 L | 6,26,000 ₹6.3 L |
| 2.00 | Repairing of 1000 GPM pump including
1. Repairing of end covers and middle body
2.Repairing of impellers
3. Repairing of shaft
4. Repairing of guide passages
5. Fabrication of neck rings
6. Fabrication of neck bushes
7. Fabrication of split glands
8. Fabrication of logging rings
9. Fabrication of shaft sleeves
10. Repairing of balance valve
11. Fabrication of bush bearings
12. Trial run and testing at site | 1 | job | 3,05,000 ₹3.0 L | 3,40,000 ₹3.4 L | 3,50,000 ₹3.5 L |
| 3.00 | Total impact of GST for the purpose of CTC | 1 | No. | - | - | - |
Tender Value
₹10.6 L
EMD Value
₹13,300
Closing Date
28 Mar 2026, 3:00 pmClosed
P.E. (EnM)
Office of the Project Officer, Birsa Project, Barka-Sayal Area PIN - 825311
Repair of 3000 GPM Pump Installed at East Quarry and 1000 GPM Pump Installed at Ghandauniya Sump along with trial run and testing at site under Birsa Project.
2026_CCL_356910_1
PE(EnM)/BIRSA/ETENDER/25-26/35
Open Tender
Electrical and Maintenance Works
120 days
Birsa Project
Please refer Tender documents.
2 documents required · 2 mandatory
₹13,300
2 May 2026
17 Mar 2026
30 Mar 2026
18 Mar 2026
28 Mar 2026
18 Mar 2026
18 Mar 2026 - 21 Mar 2026
Repairing of 3000 GPM pump including 1. Repairing of casing 2. Repairing of impellers 3. Repairing of shaft 4. Fabrication of split glands 5. Fabrication of neck rings 6. Repairing of bearing housing 7. Fabrication of coupling 8. Repairing of stuffing box 9. Fabrication of coupling guard 10. Fabrication of shaft sleeves 11. Trial run and testing at site
Repairing of 1000 GPM pump including 1. Repairing of end covers and middle body 2.Repairing of impellers 3. Repairing of shaft 4. Repairing of guide passages 5. Fabrication of neck rings 6. Fabrication of neck bushes 7. Fabrication of split glands 8. Fabrication of logging rings 9. Fabrication of shaft sleeves 10. Repairing of balance valve 11. Fabrication of bush bearings 12. Trial run and testing at site
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.49 MB
BOQ_369769.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid