Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LQualified OLD QUASSIM MANZIL 1ST FLOOR OPPOSITE CNI CHURCH 18 CHURCH LANE ROAD GOAL GHAR PORT BLAIR SOUTH ANDAMAN ANDAMAN AND NICOBAR ISLANDS 744102 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | ₹3.6 L | L1 | Qualified MSE, Category: OBC |
| 2 | L2₹3.8 L+₹15,000 (4.17%)Qualified 7 A NEAR PS MILL RANCHI TEKARI ROAD DAIRY FARM SOUTH ANDAMAN ANDAMAN NICOBAR 744103 UDYAM AN 01 0001369 35CTAPK1489G1ZO R G | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744103 | ₹3.8 L+₹15,000 (4.17%) | L2 | Qualified MSE, Category: General |
| 3 | L3₹3.8 L+₹20,000 (5.56%)Qualified 1 ANK ENTERPRISES SHOP NO 7 A ATR ROAD SOUTH ANDAMAN SOUTH ANDAMAN ANDAMAN NICOBAR 744105 UDYAM AN 01 0001368 35BEDPA1329A1ZG R S | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744105 | ₹3.8 L+₹20,000 (5.56%) | L3 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
14 Jan 2023, 10:00 amClosed
Making of shed with concrete flooring and fixing of new tiles
Tree cutting and old flooring breaking
4162054
GEM/2022/B/2885421
Two Packet Bid
Making of shed with concrete flooring and fixing of new tiles,Tree cutting and old flooring breakin
30 days
Andaman And Nicobar Islands; South Andamans
Total value wise evaluation
BOQ
1 document required · 1 mandatory
3 yrs
Exempted
14 Jan 2023
4 Jan 2023
14 Jan 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Making of shed with concrete flooring and fixing of new tiles | Making of shed with concrete flooring and fixing of new tiles Material details Angle 50mm 5 mtr X 10 Nos is equal to 50R per mtr 5 point 7 kg per mtr is equal to 285 kg Supporting pipe 75mm 3 point 5 mtr X 8 Nos is equal to 28 R per mtr X 6 point 8 kg per mtr is equal to 190 point 4 kg Parallel Pipe 50 mm 9 mtr X 5 nos is equal to 45R per myt X 5 point 2 kg is equal to 234 kg Port Concrete 06 Nos Floor filling and concrete 3 point 5 mtr X 9 mtr is equal to 31 point 5 mtr sq Cota Tiles Fixing 3 point 5 mtr X 9 mtr is equal to 31 point 5 mtr sq. Roofing sheet 42 mtr sq | 1 | Job | South Andaman | 30 |
| 2 | Tree cutting and old flooring breaking | Tree cutting and old flooring breaking | 1 | Job | South Andaman | 30 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_4162054.pdf
GEM_BID
tree_2022-12-21-10-43-33_fc52cd7aa0d2b17edb5d120e36f45345.pdf
BOQ
shed_2022-08-11-16-00-37_85e2b3aa1f5c6c6aa74edf9298_2022-12-21-10-43-33_78e6944025e4f97cddba92411b247e37.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .