| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAdmitted-Finance 00 00 NEAR OFFICERS MESS AIR FORCE JODHPUR RAJASTHAN 342011 UDYAM RJ 22 0000352 08ANTPS4413K1ZD B R | JODHPUR | RAJASTHAN | 342011 | ₹6.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.6 Cr+₹90.7 L (13.6%)Admitted-Finance | ₹7.6 Cr+₹90.7 L (13.6%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHRISTI INFRAENGINEERING PVT. LTD. L2 | R R ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00DESIGN, DRAWING AND DOCUMENTATION | |||||
| 1.01 | Process Design and Drawings | 1 | Lot | 8,28,000 ₹8,28,000 Lowest | 25,00,000 ₹25,00,000 |
| 1.02 | Architectural & Structural Designs and Drawings | 1 | Lot | 8,28,000 ₹8,28,000 Lowest | 22,00,000 ₹22,00,000 |
| 1.03 | Mechanical including Piping and Electricalworks including Instrumentation & Control Designs and Drawings | 1 | Lot | 6,90,000 ₹6,90,000 Lowest | 23,50,000 ₹23,50,000 |
| 1.04 | As built drawings for the STP Plant & SPS | 1 | Lot | 2,76,000 ₹2,76,000 Lowest | 5,00,000 ₹5,00,000 |
| 1.05 | Operation & Maintenance Manual | 1 | Lot | 2,76,000 ₹2,76,000 | 60,000 ₹60,000 Lowest |
| 1.06 | Training Programme and Manual | 1 | Lot | 1,38,000 ₹1,38,000 Lowest | 1,50,000 ₹1,50,000 |
Tender Value
₹6.9 Cr
EMD Value
₹6.9 L
Closing Date
30 Mar 2021, 6:00 pmClosed
EE ADA, Ajmer
ADA, Ajmer
Execution of Balance work of Design, Construction, Supply, Installation, Testing and Commissioning of 3.5 MLD STP (MBBR Technology) and 1 No. SPS at Pushkar and 1 No. SPS at Panchsheel, Ajmer with 5 year o and m on turnkey basis. (Risk and Cost)
2021_ADA_215488_1
NIT No 27/2020-21
Open Tender
Civil Works
Percentage
180 days
ADA
As per tender document.
3 documents required · 3 mandatory
₹1,000
ADA, Ajmer
₹6.9 L
Yes
ADA, Ajmer
21 May 2021
4 Mar 2021
31 Mar 2021
4 Mar 2021
30 Mar 2021
4 Mar 2021
16 Mar 2021
Amount
DESIGN, DRAWING AND DOCUMENTATION
Process Design and Drawings
Architectural & Structural Designs and Drawings
Mechanical including Piping and Electricalworks including Instrumentation & Control Designs and Drawings
As built drawings for the STP Plant & SPS
Operation & Maintenance Manual
Training Programme and Manual
Description of Work / Item(s)
Amount
Unit wise cost of Civil, Mechanical, Electrical, Instrumentation works & miscellaneous works of 3.5 MLD
Inlet Works
Receiving / Inlet Chamber
Civil Works
Mechanical Works
Coarse Screen Before pump House
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Raw Sewage Sump
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Primary Treatment Units
Fine Screen
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Grit Separator Units
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Secondary Treatment Units
Biological Treatment Process Units (MBBR-1, MBBR-2 & Tube Settler)
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Excess Sludge Pumps (SAS Pumps)
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Piping from Blower Room to Diffusers
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Solid Sludge Handling Units
Sludge Sump and Pump
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Chlorination System
Civil Works
Mechanical Works
Electrical & Instrumentation Works
DWPE (Dozing Tanks)
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Centrifuge
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Ancillary Facilities
Office and labouratry Building With Control and PLC Room(M.C.C, Administrative Work Shop & Store)
Civil Works
Secutity Room
Civil Works
Roads
Civil Works
Boundary Wall
Civil Works
Treated Water Discharge Channel/ RCC NP3 Pipe
Civil Works
LandScaping
LandScaping Work
Hotriculture Work (Green Belt Development)
Hotriculture Work
Lighting for Plant Yard and Building
Electrical & Instrumentation Works
D.G. Set
Civil Works
Mechanical Works
1 no. Four Wheeler gor Exclusive use of ADA engineers
Description of Work / Item(s)
Amount
Operation and maintenance of plant of 3.5 MLD STP
Operation and Maintenance of the Plant and Facilities (During First year)
Operation and Maintenance of the Plant and Facilities (During Second year)
Operation and Maintenance of the Plant and Facilities (During Third year)
Operation and Maintenance of the Plant and Facilities (During Fourth year)
Operation and Maintenance of the Plant and Facilities including Training of Line Agency personnels (During Fifth year)
Description of Work / Item(s)
Amount
Unit wise cost of Civil, Mechanical, Electrical, Instrumentation works & miscellaneous works of SPS at Pushkar.
Pumping Station at Pushkar
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Pumping Main at Pushkar SPS to Proposed manhole, 300 mm DI- K9, 300Mtr
Civil Works
Mechanical Works
Electrical & Instrumentation Works
D.G. set
Civil Works
Mechanical Works
Description of Work / Item(s)
Amount
Operation and maintenance of plant of SPS at Pushkar
Operation and Maintenance of the Plant and Facilities (During First year)
Operation and Maintenance of the Plant and Facilities (During Second year)
Operation and Maintenance of the Plant and Facilities (During Third year)
Operation and Maintenance of the Plant and Facilities (During Fourth year)
Operation and Maintenance of the Plant and Facilities including Training of Line Agency personnels (During Fifth year)
Description of Work / Item(s)
Amount
Unit wise cost of Civil, Mechanical, Electrical, Instrumentation works & miscellaneous works of SPS at Panchsheel Ajmer
Pumping Station at Panchsheel Ajmer
Civil Works
Mechanical Works
Electrical & Instrumentation Works
Pumping Main at Ajmer is already laid of 250mm DI - K9, A small strech of 50 Mtr is Required near SPS
Civil Works
Mechanical Works
Electrical & Instrumentation Works
D.G. set
Civil Works
Mechanical Works
Description of Work / Item(s)
Amount
Operation and maintenance of plant of SPS at Panchsheel Ajmer.
Operation and Maintenance of the Plant and Facilities (During First year)
Operation and Maintenance of the Plant and Facilities (During Second year)
Operation and Maintenance of the Plant and Facilities (During Third year)
Operation and Maintenance of the Plant and Facilities (During Fourth year)
Operation and Maintenance of the Plant and Facilities including Training of Line Agency personnels (During Fifth year)
R R ENTERPRISES
SHRISTI INFRAENGINEERING PVT. LTD.
SHRISTI INFRAENGINEERING PVT. LTD.
SHRISTI INFRAENGINEERING PVT. LTD.
R R ENTERPRISES
SHRISTI INFRAENGINEERING PVT. LTD.
SHRISTI INFRAENGINEERING PVT. LTD.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_383996.xls
BOQ • 0.39 MB
TechBid.pdf
Tender Documents • 12.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .