| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹63.4 LAdmitted-Finance GRAM PUNAI DARU HAZARIBAGH | -24.25% | ₹63.4 L | L1 | Admitted-Finance |
| 2 | L2₹66.5 LAdmitted-Finance BEDOKLA BARKATTA HAZARIBAGH | HAZARIBAGH | HAZARIBAGH | JHARKHAND | -20.50% | ₹66.5 L | L2 | Admitted-Finance |
| 3 | L3₹67.5 LAdmitted-Finance 30 INDUSTRIAL AREA KOKAR RANCHI 834004 JHARKHAND | RANCHI | JHARKHAND | 834004 | -19.31% | ₹67.5 L | L3 | Admitted-Finance |
| 4 | L4₹69.7 LAdmitted-Finance MANGARPATTA PARTANGA CHURCHU HAZARIBAG | HAZARIBAGH | JHARKHAND | 825301 | -16.70% | ₹69.7 L | L4 | Admitted-Finance |
| 5 | L5₹81.1 LAdmitted-Finance DMFT MADHARGAT TATICHHARIYA PRAHAND ANTARGAT KASTURBA GANDHI BALIKA AWASIYA VIDYALAYA TATICHHARIYA | PASHCHIM CHAMPARAN | BIHAR | 845101 | -2.99% | ₹81.1 L | L5 | Admitted-Finance |
Tender Value
₹83.6 L
EMD Value
₹1.7 L
Closing Date
12 May 2026, 5:00 pmClosed
EXECUTIVE ENGINEER, M.I. DIVISION, HAZARIBAG
EXECUTIVE ENGINEER, M.I. DIVISION, HAZARIBAG
Construction of P.C.C. Road from Turkbad Chowk in Village Chuglamo to PWD Road of Village- Gainda, Block- Barkatha, District- Hazaribag
2026_WRD_113611_1
DMFT/MID/HAZARIBAG/F2 - 05/2026 - 27 (Gr. No. - 04)
Open Tender
Civil Works
Percentage
335 days
BARKATHA, HAZARIBAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.7 L
24 Aug 2026
5 May 2026
14 May 2026
5 May 2026
12 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50m. Including all lifts, levellings, ramming the foundation trenches, removing roots of trees,shrubs all complete job as per approved design, building specification and direction of E/I. (5.1.1) BCD | - | M3 | 151.82 | - |
| 2 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. (B.C.D 5.6.3 ) | 1 | M2 | 330.34 | ₹330.01 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
With Grading-IlI Material. (4.01 B (iii) RCD) | 1 | M3 | 1,680.3 | ₹1,678.62 |
| 4 | Providing clean coarse sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials,labour,royalty and taxes all complete job as per building specification and direction of E/I. (Mode of measurement compacted volume).(5.1.10 BCD) | 1 | M3 | 589.51 | ₹588.92 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (5.3.1.2) BCD | 1 | M3 | 4,598.23 | ₹4,593.63 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) (5.3.1.1) BCD | - | M3 | 4,961.73 | - |
| 7 | Separation membrance of impermeable plastic sheeting 125 micron thick. M-072 R.C.D. | - | M2 | 13 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns etc. for mass concrete. 5.3.17.1 BCD | - | M2 | 194.5 | - |
| 9 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume).(5.1.7) BCD | 1 | M3 | 55.28 | ₹55.22 |
| 10 | Cost of carriage of materials :
Cement | 1 | MT | 523.9 | ₹523.38 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
TENDER_DOCUMENTS_05_04.pdf
Tender Documents • 15.00 MB
BOQ_153503.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].