Loading…
Loading…
Tender Value
₹25.0 L
EMD Value
₹59,000
Closing Date
15 Jun 2026, 12:00 pm
Project Manager
UPPCL Unit-26, Saharanpur
CONSTRUCTION WORK OF ADDITIONAL DORMITORY HALL BUILDING FOR KASTURBA GANDHI BALIKA VIDYALAYA AT SADAR IN DISTRICT MUZAFFARNAGAR UP
2026_UPPRC_1157241_1
06/PCL/PM-26/SRE/2026-27
Open Tender
Civil Works
90 days
Saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹59,000
Yes
5 Jun 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 mabove ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 550 | sqm | 12.17 | ₹6,693.5 | BI01010001010000000000000515BI0100001113 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. | 52.96 | CUM | 122.78 | ₹6,502.43 | BI01010001010000000000000515BI0100001114 |
| 1.03 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 16.74 | CUM | 484.55 | ₹8,111.37 | BI01010001010000000000000515BI0100001115 |
| 1.04 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. | 13.05 | CUM | 1,469.05 | ₹19,171.1 | BI01010001010000000000000515BI0100001116 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 14.48 | CUM | 4,712.03 | ₹68,230.19 | BI01010001010000000000000515BI0100001117 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (M-20)Upto plinth level(i) R.C.C. work in Footing | - | CUM | 6,257.17 | - | BI01010001010000000000000515BI0100001118 |
| 1.07 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (M-20)Upto plinth level(iii) R.C.C. work in Columns | - | CUM | 6,257.17 | - | BI01010001010000000000000515BI0100001119 |
| 1.08 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (M-20)Upto plinth level(ii) R.C.C. work in Beam | - | CUM | 6,257.17 | - | BI01010001010000000000000515BI0100001120 |
| 1.09 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (M-20) GF&FF(iii) R.C.C. work in Columns | - | CUM | 7,507.25 | - | BI01010001010000000000000515BI0100001121 |
| 1.1 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (M-20) GF&FF(i) R.C.C. work in Lintel | - | CUM | 7,958.63 | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.26 MB
BOQ_2168477.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid