| 1 | L1₹15.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹16.0 L+₹10,526 (0.66%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹16.6 L+₹75,176 (4.73%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹16.7 L+₹76,536 (4.82%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹18.9 L+₹3.0 L (18.8%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ELEVEES INFRASTRUCTURE L1 | M/S A. H. Electric Enterprises L5 | FAYAZ AHMAD DAR L3 | ROUF AHMAD SHAH L2 | MS BISMILLAH ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of old installed 25KVA (01No. At Alliepora), 63KVA (05No. At Astan Mohalla Bellow, CRPF Karewa Koil, Hajidarpora, Frestepora Rahmoo and Hakripora) & 100KVA (02No. at Sheikh Mohalla Uthmulla and SOG Colony Litter) and re-Installation, Commissioning of old spared 63KVA at Alliepora, 100KVA at Frestepora Rahmoo & Hakripora including Loading, Unloading, Transportation and return back of spared 01 No. 25KVA from ALliepora and 04No, 63KVA from Astan Mohalla Bellow, CRPF Karewa Koil, Frestepora Rahmoo and Hakripora to Divisional Stores. | 6 | Job | 20,000 ₹1,20,000 | 5,500 ₹33,000 | 11,800 ₹70,800 | 6,000 ₹36,000 | 4,500 ₹27,000 Lowest |
| 2.00 | Supply, Installation, Testing & Commissioning of 11/0.433kV, 3-phase, 100KVA Distribution Transformer with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound, and with LV Cable Box having detachable Aluminium Gland plate. Transformer should have arrangement for vertical Take off at CRPF Karewa Koil, Astan Mohalla Bellow and Hajidarpora | 3 | No | 1,90,000 ₹5,70,000 | 2,00,000 ₹6,00,000 | 1,93,500 ₹5,80,500 | 1,76,000 ₹5,28,000 Lowest | 1,89,000 ₹5,67,000 |
| 3.00 | Supply, Installation, Testing & Commissioning of 11/0.433kV, 3-phase, 200KVA Distribution Transformer with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate. Transformer should have arrangement for vertical Take off at Sheikh Mohalla Uthmullah and SOG Colony Litter | 2 | No | 3,10,000 ₹6,20,000 Lowest | 3,90,000 ₹7,80,000 | 3,32,500 ₹6,65,000 | 3,10,000 ₹6,20,000 Lowest | 3,70,000 ₹7,40,000 |
| 4.00 | Supply, Installation, Testing & commissioning of 9 Mtr. Long Pole (ST-410 SP33) | 2 | No | 17,000 ₹34,000 | 18,000 ₹36,000 | 18,800 ₹37,600 | 17,800 ₹35,600 | 16,500 ₹33,000 Lowest |
| 5.00 | Supply, Installation, Testing & commissioning of 8 Mtr. Long Pole (ST-410 SP15) | 1 | No | 12,500 ₹12,500 | 15,000 ₹15,000 | 13,900 ₹13,900 | 14,000 ₹14,000 | 11,500 ₹11,500 Lowest |
| 6.00 | Supply, Installation, Testing & commissioning of ACSR 0.05 Conductor (50 mm² ACSR Conductor) | 0.1 | Km | 5,000 ₹500 Lowest | 70,000 ₹7,000 | 56,000 ₹5,600 | 75,000 ₹7,500 | 31,000 ₹3,100 |
| 7.00 | Supply, Installation, Testing & commissioning of G I Channel/ Angle/ Flat iron for cross, braces of sizes including clamps and GI Nut Bolts with all accessories | 600 | Kg | 120 ₹72,000 | 139 ₹83,400 | 118 ₹70,800 Lowest | 130 ₹78,000 | 137 ₹82,200 |
| 8.00 | Supply, Installation, Testing & commissioning of Mucki clamps/LT Shackles with insulators | 4 | No | 500 ₹2,000 | 300 ₹1,200 | 255 ₹1,020 Lowest | 300 ₹1,200 | 315 ₹1,260 |
| 9.00 | Supply, Installation, Testing & commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 6 | No | 200 ₹1,200 Lowest | 250 ₹1,500 | 200 ₹1,200 Lowest | 230 ₹1,380 | 275 ₹1,650 |
| 10.00 | Supply, Installation, Testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 2 | Set | 3,200 ₹6,400 Lowest | 3,500 ₹7,000 | 3,500 ₹7,000 | 4,500 ₹9,000 | 3,500 ₹7,000 |
Tender Value
₹19.9 L
EMD Value
₹39,800
Closing Date
31 Aug 2026, 11:00 amClosed
XEN ED PULWAMA
OFFICE OF THE XEN ED PULWAMA
Augmentation of Sub-Stations for critically overloaded DTs for winter preparedness for Sub Division Pulwama, Newa and Rajpora under UT Capex 2026-27
2026_PDD_321043_1
KPDCL/OM/PUL/41 of 2026-27 Dated 14-08-2026.
Open Tender
Electrical Works
Turn-key
60 days
XEN ED PULWAMA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer ED Pulwama
₹39,800
1 Sept 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old installed 25KVA (01No. At Alliepora), 63KVA (05No. At Astan Mohalla Bellow, CRPF Karewa Koil, Hajidarpora, Frestepora Rahmoo and Hakripora) & 100KVA (02No. at Sheikh Mohalla Uthmulla and SOG Colony Litter) and re-Installation, Commissioning of old spared 63KVA at Alliepora, 100KVA at Frestepora Rahmoo & Hakripora including Loading, Unloading, Transportation and return back of spared 01 No. 25KVA from ALliepora and 04No, 63KVA from Astan Mohalla Bellow, CRPF Karewa Koil, Frestepora Rahmoo and Hakripora to Divisional Stores. | 6 | Job | - | - |
| 2 | Supply, Installation, Testing & Commissioning of 11/0.433kV, 3-phase, 100KVA Distribution Transformer with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound, and with LV Cable Box having detachable Aluminium Gland plate. Transformer should have arrangement for vertical Take off at CRPF Karewa Koil, Astan Mohalla Bellow and Hajidarpora | 3 | No | - | - |
| 3 | Supply, Installation, Testing & Commissioning of 11/0.433kV, 3-phase, 200KVA Distribution Transformer with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate. Transformer should have arrangement for vertical Take off at Sheikh Mohalla Uthmullah and SOG Colony Litter | 2 | No | - | - |
| 4 | Supply, Installation, Testing & commissioning of 9 Mtr. Long Pole (ST-410 SP33) | 2 | No | - | - |
| 5 | Supply, Installation, Testing & commissioning of 8 Mtr. Long Pole (ST-410 SP15) | 1 | No | - | - |
| 6 | Supply, Installation, Testing & commissioning of ACSR 0.05 Conductor (50 mm² ACSR Conductor) | 0.1 | Km | - | - |
| 7 | Supply, Installation, Testing & commissioning of G I Channel/ Angle/ Flat iron for cross, braces of sizes including clamps and GI Nut Bolts with all accessories | 600 | Kg | - | - |
| 8 | Supply, Installation, Testing & commissioning of Mucki clamps/LT Shackles with insulators | 4 | No | - | - |
| 9 | Supply, Installation, Testing & commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 6 | No | - | - |
| 10 | Supply, Installation, Testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 2 | Set | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
SBD38.pdf
Tender Documents • 1.68 MB
Annexure41.pdf
Tender Documents • 0.47 MB
Annexure41A.pdf
Tender Documents • 0.39 MB
BOQ_1069402.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .