Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.1 LQualified Make: KINJAL
Model: SWITCH SOCKET 6 AMP. COMBINED WITH BOX | Make: KINJAL
Model: SWITCH SOCKET 6 AMP. COMBINED WITH BOX | L1 | Qualified MII | |
| 2 | L2₹24.8 L+₹1.8 L (7.74%)Qualified Make: KINJAL
Model: SWITCH SOCKET COMB WITH BOX 16 A 118 CHANDGAM PULWAMA WANI COMPLEX KUMAR MOHALLA CHANDGAM PULWAMA PULWAMA JAMMU KASHMIR 192301 | PULWAMA | JAMMU AND KASHMIR | 192301 | Make: KINJAL
Model: SWITCH SOCKET COMB WITH BOX 16 A | L2 | Qualified MII | |
| 3 | L3₹28.2 L+₹5.2 L (22.5%)Qualified Make: KINJAL
Model: SWITCH SOCKET COMB WITH BOX 16 A 102 3 RAKESH MARG GHAZIABAD GHAZIABAD UTTAR PRADESH 201001 | GHAZIABAD | UTTAR PRADESH | 201001 | Make: KINJAL
Model: SWITCH SOCKET COMB WITH BOX 16 A | L3 | Qualified MII | |
| 4 | Qualified Make: KINJAL
Model: SWITCH SOCKET COMB WITH BOX 16 A NOIDA H N 135 NOIDA SECTOR 53 BIHARI COLONY NOIDA PIN BIHARI COLONY GAUTAM BUDDHA NAGAR UTTAR PRADESH 201307 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201307 | Make: KINJAL
Model: SWITCH SOCKET COMB WITH BOX 16 A | - | Qualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
9 Sept 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Published by the portal on this tender, for queries and grievance redressal.
modular electrical enclosure switch board boxes for modular type accessories (Q3)
Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2)
Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2)
Steel Pipes for Water and Sewage as per IS 3589 (Q3)
Metal Alloy Casting Water Tap with Aerator (V2) (Q3)
Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3)
Wood screws (Q3)
Curtain Pipe
Sider and mounting bracket (Q4)
LED Bulkhead Light (Q3)
Hardwares (Hex Bolt & Spring Channel Nut
Anchor Fastener
Washer
Spring Washer) - BHEL (Q3)
Gland Packaging (Q3)
Emery Cloth (Q3)
Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3)
Non Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854 (Q2)
Non Modular Piano Type Domestic Electrical Sockets ISI Marked To IS 1293 (Q2)
Switch Disconnectors and Fuse Combination Units (Switch Fuse Unit) Conforming To IS/IEC 60947 (Part 3) (Q2)
Putty for use on Window Frames as per IS 419 (Q3)
Ready Mixed Paint
Air Drying
Red Oxide - Zinc Phosphate
Priming as per IS 12744 (Q3)
Wooden Beading Patti (Q4)
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2)
Epoxy Based Zinc Phosphate Primer (two-pack) as per IS 13238 (Q3)
Modular Piano Type Domestic Fan Regulator Conforming To IS 11037 (Q3)
9819105
GEM/2026/B/7972344
Two Packet Bid
Non Modular Piano Type Domestic Electrical Switches ISI
Jammu And Kashmir; Baramulla, Jammu And Kashmir; Srinagar
Total value wise evaluation
PRODUCT
4 documents required · 4 mandatory
3 yrs
50%
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | - | 397pieces | - |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | - | 303pieces | - |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | - | 394pieces | - |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | Srinagar | 320pieces | 15 days |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | Srinagar | 19pieces | 15 days |
| Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) | Srinagar | 1pieces | 15 days |
| Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) | Srinagar | 1pieces | 15 days |
| Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) | Srinagar | 1pieces | 15 days |
| Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) | Srinagar | 1pieces | 15 days |
| Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) | Srinagar | 1pieces | 15 days |
| Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) | Srinagar | 1pieces | 15 days |
| Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) | - | 4pieces | - |
| Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) | Baramulla | 2pieces | 15 days |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 16pieces | 15 days |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 45pieces | 15 days |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 47pieces | 15 days |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 12pieces | 15 days |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 9pieces | 15 days |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 11pieces | 15 days |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 14pieces | 15 days |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 3pieces | 15 days |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 5pieces | 15 days |
| Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) | Srinagar | 3pieces | 15 days |
| Steel Pipes for Water and Sewage as per IS 3589 (Q3) | - | 215meter | - |
| Steel Pipes for Water and Sewage as per IS 3589 (Q3) | - | 294meter | - |
| Steel Pipes for Water and Sewage as per IS 3589 (Q3) | - | 27meter | - |
| Steel Pipes for Water and Sewage as per IS 3589 (Q3) | - | 49meter | - |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 45pieces | 15 days |
| Metal Alloy Casting Water Tap with Aerator (V2) (Q3) | - | 100pieces | - |
| Metal Alloy Casting Water Tap with Aerator (V2) (Q3) | Kupwara | 25pieces | 15 days |
| Metal Alloy Casting Water Tap with Aerator (V2) (Q3) | Srinagar | 31pieces | 15 days |
| Metal Alloy Casting Water Tap with Aerator (V2) (Q3) | Srinagar | 24pieces | 15 days |
| Metal Alloy Casting Water Tap with Aerator (V2) (Q3) | - | 148pieces | - |
| Metal Alloy Casting Water Tap with Aerator (V2) (Q3) | Srinagar | 60pieces | 15 days |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | Srinagar | 35pieces | 15 days |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 40pieces | 15 days |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | - | 300pieces | - |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 5pieces | 15 days |
| Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3) | Srinagar | 55pieces | 15 days |
| Metal Alloy Casting Water Tap with Aerator (V2) (Q3) | Srinagar | 2pieces | 15 days |
| Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) | Srinagar | 13pieces | 15 days |
| Wood screws (Q3) | Srinagar | 5kilogram | 15 days |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | Srinagar | 8pieces | 15 days |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | Srinagar | 13pieces | 15 days |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | Srinagar | 12pieces | 15 days |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | Srinagar | 18pieces | 15 days |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | Srinagar | 10pieces | 15 days |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | Srinagar | 11pieces | 15 days |
| Wood screws (Q3) | Srinagar | 2kilogram | 15 days |
| Wood screws (Q3) | Srinagar | 4kilogram | 15 days |
| Wood screws (Q3) | Srinagar | 2kilogram | 15 days |
| Wood screws (Q3) | Srinagar | 3kilogram | 15 days |
| Wood screws (Q3) | Srinagar | 4kilogram | 15 days |
| modular electrical enclosure switch board boxes for modular type accessories (Q3) | Kupwara | 80pieces | 15 days |
| Metal Alloy Casting Water Tap with Aerator (V2) (Q3) | - | 55pieces | - |
| Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3) | Srinagar | 23pieces | 15 days |
| Curtain Pipe, Sider And Mounting Bracket | Srinagar | 135meter | 15 days |
| LED Bulkhead Light (Q3) | Srinagar | 1pieces | 15 days |
| Metal Alloy Casting Water Tap with Aerator (V2) (Q3) | Kupwara | 13pieces | 15 days |
| LED Bulkhead Light (Q3) | Kupwara | 42pieces | 15 days |
| Hardwares (Hex Bolt & Spring Channel Nut, Anchor Fastener, Washer, Spring Washer) - BHEL | Srinagar | 60pieces | 15 days |
| Gland Packaging (Q3) | Srinagar | 2pieces | 15 days |
| Emery Cloth (Q3) | Srinagar | 19pieces | 15 days |
| Emery Cloth (Q3) | Srinagar | 12pieces | 15 days |
| Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3) | Srinagar | 70pieces | 15 days |
| Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3) | Srinagar | 80pieces | 15 days |
| Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3) | Srinagar | 24pieces | 15 days |
| Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3) | Srinagar | 24pieces | 15 days |
| Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3) | Srinagar | 24pieces | 15 days |
| Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3) | Srinagar | 17pieces | 15 days |
| Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3) | Srinagar | 20pieces | 15 days |
| Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3) | Srinagar | 6pieces | 15 days |
| Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3) | Srinagar | 10pieces | 15 days |
| Non Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854 (Q2) | Srinagar | 92pieces | 15 days |
| Non Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854 (Q2) | Srinagar | 93pieces | 15 days |
| Non Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854 (Q2) | Srinagar | 19pieces | 15 days |
| Wood screws (Q3) | Srinagar | 7kilogram | 15 days |
| Non Modular Piano Type Domestic Electrical Sockets ISI Marked To IS 1293 (Q2) | Srinagar | 45pieces | 15 days |
| Non Modular Piano Type Domestic Electrical Sockets ISI Marked To IS 1293 (Q2) | Srinagar | 68pieces | 15 days |
| Switch Disconnectors and Fuse Combination Units (Switch Fuse Unit) Conforming To IS/IEC 60947 (Part 3) (Q2) | Baramulla | 4pieces | 15 days |
| Switch Disconnectors and Fuse Combination Units (Switch Fuse Unit) Conforming To IS/IEC 60947 (Part 3) (Q2) | - | 7pieces | - |
| Putty for use on Window Frames as per IS 419 (Q3) | - | 440kilogram | - |
| Putty for use on Window Frames as per IS 419 (Q3) | Srinagar | 203kilogram | 15 days |
| Ready Mixed Paint, Air Drying, Red Oxide - Zinc Phosphate, Priming As Per IS 12744 | Srinagar | 6liter | 15 days |
| Putty for use on Window Frames as per IS 419 (Q3) | Srinagar | 73kilogram | 15 days |
| Wooden Beading Patti (Q4) | Srinagar | 95meter | 15 days |
| Wooden Beading Patti (Q4) | Srinagar | 29meter | 15 days |
| XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) | Srinagar | 40meter | 15 days |
| XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) | Srinagar | 40meter | 15 days |
| Epoxy Based Zinc Phosphate Primer (two-pack) as per IS 13238 (Q3) | - | 165liter | - |
| Modular Piano Type Domestic Fan Regulator Conforming To IS 11037 (Q3) | Srinagar | 103pieces | 15 days |
| Curtain Pipe, Sider And Mounting Bracket | - | 213meter | - |
| Non Modular Piano Type Domestic Electrical Sockets ISI Marked To IS 1293 (Q2) | Srinagar | 120pieces | 15 days |
Exempted
Yes
14 Sept 2026
6 Sept 2026
10 Sept 2026
30 days from bid end date (until 9 Oct 2026)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9819105.pdf
GEM_BID • 0.60 MB
drawings_2020-11-19-19-44-25_adf1d47aeff5ffe4cbc3652a8c456041.pdf
GEM_OTHER • 1.02 MB
cable-tray-and-accessories_2020-11-19-19-44-41_c2482b98bfa771a3f651764839256a5b.pdf
GEM_OTHER • 0.80 MB
ad24_fd041ff7-8015-422c-b0271787923606741_sbso133.pdf
GEM_OTHER • 0.62 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .