Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | -31.21% | ₹6.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.3 L+₹77,401.74 (11.9%)Admitted-Fee/PreQual/Technical/Finance | -23.00% | ₹7.3 L+₹77,401.74 (11.9%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.6 L+₹1.2 L (17.8%)Admitted-Fee/PreQual/Technical/Finance | -19.00% | ₹7.6 L+₹1.2 L (17.8%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.2 L+₹1.7 L (26.7%)Admitted-Fee/PreQual/Technical/Finance | -12.81% | ₹8.2 L+₹1.7 L (26.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.4 L
EMD Value
₹18,860
Closing Date
21 Jul 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISION SMC REGAL LANE LAL CHOWK
Construction of wooden culvert from H/o Ab Majid Bhat upto Masjid Sheikh ul Alam at Dar Mohalla Miskeen Bagh
2026_HAUDD_315318_22
SHORT Term NOTICE INVITING ETENDER No. 10 of 2026-2027 Dated 09.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
Dar Mohalla Miskeen Bagh
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹601
FA/CAO AC NO 0216010200000007
₹18,860
26 Jul 2026
9 Jul 2026
22 Jul 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of Labour for site clearance including removal of weeds, grass and other unwanted material etc complete job | 5 | No | 533 | ₹2,665 |
| 2 | Supply of Kiker wood piles of requires size and shape including all alled accessories complete job as per directions at site including all carriages of material upto site of work | 204 | Cft | 1,150 | ₹2,34,600 |
| 3 | Boring providing driving installing of kiker wood pile complete job as directed at site. | 124.39 | Rm | 150 | ₹18,658.5 |
| 4 | Supply and fixing of Kiker wood in flooring, runners flooring including cost of Screws/ Nails complete job as per directions of engineer incharge at site including all carriages of material upto site of work. | 211.3 | Cft | 1,300 | ₹2,74,690 |
| 5 | Providing & laying stone soiling hand packed tightly including all carriages of material complete upto site of work. | 30.75 | Cum | 850 | ₹26,137.5 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 24.06 | Cum | 5,202.9 | ₹1,25,181.77 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 31.75 | Cum | 6,591.25 | ₹2,09,272.19 |
| 8 | Carriage of Mechenical Transport for stone aggregate and sand | 73.67 | Cum | 700 | ₹51,569 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_1022611.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .