Loading…
Loading…
Tender Value
₹1 Cr
EMD Value
₹75,000
Closing Date
9 Jul 2026, 5:30 pmDue tomorrow
MR SE DURG 3 KUSUM DEWANGAN
CE,DURG
SPECIAL REPAIR WORK OF ROAD, BRIDGE AND CULVERTS ON VARIOUS ROAD UNDER SUB DIVISION NO. 01 BALOD (ZONAL AGENCY)
194172
NIT NO. 195/DURG(Balod)/2026
RESTRICTED TENDER
WORKS
CE
Required Past Technical Experience: As Per NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
5 documents required · 5 mandatory
Public Works Department (PWD)
WORKS
MR SE DURG 3 KUSUM DEWANGAN
RESTRICTED TENDER
PERCENTAGE
A B C D
CE,DURG
DURG,CIRCLE
DIVISION BALOD
120
No
1
7137000
12012023
194172
9 Jul, 2026 5:30:38 PM IST
14 Jul, 2026 11:30:14 AM IST
26 Jun, 2026 7:30:24 PM IST
12052026
NIT NO. 195/DURG(Balod)/2026
SPECIAL REPAIR WORK OF ROAD, BRIDGE AND CULVERTS ON VARIOUS ROAD UNDER SUB DIVISION NO. 01 BALOD (ZONAL AGENCY)
75000.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
10000000.00
2
13 Jul, 2026 5:30:02 PM IST
10000000
AS PER NIT
AS PER NIT
As Per NIT
0.00 INR
06
13d 1h 40m
4910520230005 ,4910520230006 ,4910520230007
5 documents required · 5 mandatory
₹0
₹75,000
26 Jun 2026
26 Jun 2026
14 Jul 2026
26 Jun 2026
9 Jul 2026
26 Jun 2026
13 Jul 2026
GOVERNMENT OF CHHATTISGARH
PUBLIC WORKS DEPARTMENT
DETAILED ESTIMATE FOR SPECIAL REPAIR WORK OF BRIDGE AND CULVERTS ON VARIOUS ROAD UNDER SUB DIVISION NO. 01 BALOD
ESTIMATED COST - Rs. 100.00 Lacs
EXECUTIVE ENGINEER
PUBLIC WORKS DEPARTMENT
DIVISION, BALOD (C.G.)
DETAILED ESTIMATE FOR SPECIAL REPAIR WORK OF BRIDGE AND CULVERTS ON VARIOUS ROAD UNDER SUB DIVISION NO. 01 BALOD
GENERAL ABSTRACT
S.NO. PARTICULAR AMOUNT
1 SPECIAL REPAIR OF BRIDGE AND CULVERTS 10,000,199
TOTAL 10,000,199
Rs. SAY IN LACS 100.00
Sub Engineer Sub Divisional Officer Executive Engineer
PWD Sub Division No. 01 Balod PWD Balod Division Balod
DETAILED ESTIMATE FOR SPECIAL REPAIR WORK OF BRIDGE AND CULVERTS ON VARIOUS ROAD UNDER SUB DIVISION NO. 01 BALOD
S.No. Item No. Sub- head Qty Unit Rate Amount 100.00
1 2.4 R.SOR Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness if required and as per relevant clauses of section-200.
A In area of light jungle 0.35 Hectare 61253.00 21439.00 0.1 6125.00
2 3.9 R.SOR Removal of Unserviceable Soil with Disposal up to 1000 meters including loading and unloading 225.00 cum 83.00 18675.00 90 7470.00
3 2.5 R.SOR Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead up to 1000 meters and as per relevant clauses of section-200 in (road s.o.r.)
(i) Lime / Cement Concrete (A) Lime Concrete, cement concrete grade M-10 and below 90.00 cum 466.00 41940.00 0.00
(B) Cement Concrete Grade M-15 & M-20 85.00 cum 563.00 47855.00 0.00
(iii) Stone Masonry (B)Rubble stone masonry in cement mortar. 330.00 cum 297.00 98010.00 130 38610.00
4 1.5 BR.SOR Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead upto 1000 meters and as per relevant clauses of section-200 in
IX Removing all type of hume pipes and stacking within a lead upto 1000 meters including earthwork and dismantling of masonry works around pipes.
5 2.1 BR.SOR Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)(Bridge S.O.R.)
(i) Ordinary soil A Manual Means Upto 3 m depth 535.00 cum 161.00 86135.00 160 25760.00
6 2.3 BR.SOR Sand Filling in Foundation Trenches as per Drawing & Technical Specification(Bridge S.O.R.) 390.00 cum 1278.00 498420.00 130 166140.00
7 2.6 BR.SOR Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications A) Using batch type concrete mixer with integrated weigher.
8 9.4 R.SOR Providing and laying Reinforced Cement Concrete pipe NP 3 / prestressed concrete pipe. (Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipes, excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . )
9 2.5 (ii) BR.SOR Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specifications and as per clauses of section 1500,1700 and 2100. (ii) Random Rubble Masonry Coursed / uncoursed 66.00 Meter 4844.00 319704.00 20 96880.00
10 4.18 R.SOR Providing and fixing guard stones 200 x 200 x 900 mm made of precast RCC M-20 grade fixed at 300 mm into the ground in P.C.C.1:3:6 blocks of size 400 x 400 x 400 mm and given two coats of paint with white and black bands including excavation. 360.00 each 525.00 189000.00 150 78750.00
11 9.11 R.SOR Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification including trimming of slopes to proper profile and preparation of bed and as per clause 2504. 330.00 cum 2232.00 736560.00 100 223200.00
12 9.10 R.SOR Providing and laying Pitching Stone/Boulder on slopes laid over prepared filter media including boulder apron laid dry in front of toeof embankment complete as per drawing and Technical specifications as per clause 2504. 150.00 cum 2486.00 372900.00 49 121814.00
13 6.15 BR.SOR Replacement of damaged concrete railing (Dismantling the old railing and disposal of dismantled material) 90.00 mtr 2424.00 218160.00 25 60600.00
14 6.18 BR.SOR Repair of R.C.C. railing : Carrying out repair of RCC M-30 railing to bring it to the original shape. 85.00 mtr 145.00 12325.00 25 3625.00
15 6.19 BR.SOR Repair of steel railing: Repair of steel railing to bring it to the original shape ( It is assumed that damage to the steel railing is to the extent of 10 percent. ) 80.00 mtr 368.00 29440.00 16 5888.00
16 4.2 BR.SOR Supplying, fitting and placing HSD (High Strength Deformed Steel) bar reinforcement in super-structure complete as per drawing and technical specifications 8.50 MT 81366.00 691611.00 1.5 122049.00
17 4.60 Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406. 100.00 cum 1606.00 160600.00
18 3.13 Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area Construction of sub-grade with approved material/selected soil having C.B.R. > 8 (unless specified otherwise in the contract) obtained from borrow pits/borrow area with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 105.00 cum 268.00 28140.00
19 4.10 Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 b) For Lower Sub-base with i) Grading-V Material 105.00 cum 1573.00 165165.00
Say Rs. In Lacs 100.00 30.00
Sub Engineer Sub Divisional Officer PWD Sub Division No. 1 Balod Executive Engineer PWD Balod Division Balod
NIT SCHEDULE FOR SPECIAL REPAIR WORK OF BRIDGE AND CULVERTS ON VARIOUS ROAD UNDER SUB DIVISION NO. 01 BALOD
Rate:- As per SOR of ROAD & Bridge in forced from 01-01-2025 with upto date amendments PAC RS. 100.00 Lacs
S.No. Item No. Sub- head Qty Unit Rate Amount 100.00
1 2.4 R.SOR Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness if required and as per relevant clauses of section-200.
A In area of light jungle 0.35 Hectare 61253.00 21439.00 0.1 6125.00
2 3.9 R.SOR Removal of Unserviceable Soil with Disposal up to 1000 meters including loading and unloading 225.00 cum 83.00 18675.00 90 7470.00
3 2.5 R.SOR Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead up to 1000 meters and as per relevant clauses of section-200 in (road s.o.r.)
(i) Lime / Cement Concrete (A) Lime Concrete, cement concrete grade M-10 and below 90.00 cum 466.00 41940.00 0.00
(B) Cement Concrete Grade M-15 & M-20 85.00 cum 563.00 47855.00 0.00
(iii) Stone Masonry (B)Rubble stone masonry in cement mortar. 330.00 cum 297.00 98010.00 130 38610.00
4 1.5 BR.SOR Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead upto 1000 meters and as per relevant clauses of section-200 in
IX Removing all type of hume pipes and stacking within a lead upto 1000 meters including earthwork and dismantling of masonry works around pipes.
5 2.1 BR.SOR Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)(Bridge S.O.R.)
(i) Ordinary soil A Manual Means Upto 3 m depth 535.00 cum 161.00 86135.00 160 25760.00
6 2.3 BR.SOR Sand Filling in Foundation Trenches as per Drawing & Technical Specification(Bridge S.O.R.) 390.00 cum 1278.00 498420.00 130 166140.00
7 2.6 BR.SOR Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications A) Using batch type concrete mixer with integrated weigher.
8 9.4 R.SOR Providing and laying Reinforced Cement Concrete pipe NP 3 / prestressed concrete pipe. (Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipes, excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . )
9 2.5 (ii) BR.SOR Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specifications and as per clauses of section 1500,1700 and 2100. (ii) Random Rubble Masonry Coursed / uncoursed 66.00 Meter 4844.00 319704.00 20 96880.00
10 4.18 R.SOR Providing and fixing guard stones 200 x 200 x 900 mm made of precast RCC M-20 grade fixed at 300 mm into the ground in P.C.C.1:3:6 blocks of size 400 x 400 x 400 mm and given two coats of paint with white and black bands including excavation. 360.00 each 525.00 189000.00 150 78750.00
11 9.11 R.SOR Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification including trimming of slopes to proper profile and preparation of bed and as per clause 2504. 330.00 cum 2232.00 736560.00 100 223200.00
12 9.10 R.SOR Providing and laying Pitching Stone/Boulder on slopes laid over prepared filter media including boulder apron laid dry in front of toeof embankment complete as per drawing and Technical specifications as per clause 2504. 150.00 cum 2486.00 372900.00 49 121814.00
13 6.15 BR.SOR Replacement of damaged concrete railing (Dismantling the old railing and disposal of dismantled material) 90.00 mtr 2424.00 218160.00 25 60600.00
14 6.18 BR.SOR Repair of R.C.C. railing : Carrying out repair of RCC M-30 railing to bring it to the original shape. 85.00 mtr 145.00 12325.00 25 3625.00
15 6.19 BR.SOR Repair of steel railing: Repair of steel railing to bring it to the original shape ( It is assumed that damage to the steel railing is to the extent of 10 percent. ) 80.00 mtr 368.00 29440.00 16 5888.00
16 4.2 BR.SOR Supplying, fitting and placing HSD (High Strength Deformed Steel) bar reinforcement in super-structure complete as per drawing and technical specifications 8.50 MT 81366.00 691611.00 1.5 122049.00
17 4.60 Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406. 100.00 cum 1606.00 160600.00
18 3.13 Construction of sub-grade with Material Obtained from Borrow Pits/Borrow Area Construction of sub-grade with approved material/selected soil having C.B.R. > 8 (unless specified otherwise in the contract) obtained from borrow pits/borrow area with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 105.00 cum 268.00 28140.00
19 4.10 Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 b) For Lower Sub-base with i) Grading-V Material 105.00 cum 1573.00 165165.00
Say Rs. In Lacs 100.00 30.00
Sub Engineer Sub Divisional Officer PWD Sub Division No. 1 Balod Executive Engineer PWD Balod Division Balod
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.14 MB
4333690386027321291_194172_Affidavit.docx
NIT • 0.01 MB
8541000222685748359_194172_BID-CAPACITY-2.docx
NIT • 0.03 MB
2894961867640112434_194172_English notice Less than 1 Crore.docx
NIT • 0.03 MB
3935139444404036203_194172_Guidelines_to_Bidders_EPS_v1.pdf
NIT • 0.13 MB
8297190584689030794_194172_Latest A_ 2.doc
NIT • 0.16 MB
2729536517621980904_194172_Latest NIT APPENDIX 2.doc
NIT • 0.32 MB
6408589469982526278_194172_SR Work of Culvert repair 17042026.xlsx
BOQ • 0.12 MB
Download all tender documents and submit your bid