Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-AOC 640 MAIN ROAD BABINA CANTT JHANSI UP 284401 | JHANSI | JHANSI | UP | 284401 | L1 | Accepted-AOC Being a L1 bidder | |
| 2 | L2₹25.8 L+₹57,200 (2.27%)Rejected-Finance | L2 | Rejected-Finance Not being a
lowest
tenderer | |
| 3 | L3₹26.9 L+₹1.7 L (6.81%)Rejected-Finance | L3 | Rejected-Finance Not being a
lowest
tenderer | |
| 4 | L4₹28.8 L+₹3.6 L (14.3%)Rejected-Finance | L4 | Rejected-Finance Not being a
lowest
tenderer | |
| 5 | L5₹29.0 L+₹3.8 L (15.0%)Rejected-Finance | L5 | Rejected-Finance Not being a
lowest
tenderer |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
5 Nov 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE BABINA
GE BABINA CANTT 284401
PERIODICAL SERVICE IN CERTAIN BLDG IN ZONE-6, 9 TO 12 AT BABINA CANTT
2022_MES_556370_1
GE/BAB/TOKEN/46 OF 2022-2023
Open Tender
Civil Works
Item Rate
335 days
GE BABINA
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE BABINA
₹70,000
Yes
15 Nov 2022
7 Oct 2022
7 Nov 2022
7 Oct 2022
5 Nov 2022
22 Oct 2022
Amount
Complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) with sanding pad of appropriate grit to make surface clean,free from dust, loose paint etc by skilled labour complete all as specified and directed.
M & L for Providing and applying minimum 1mm thick wall care putty over prepared surface to achive the surface even and smooth for painting complete all as specified and directed.
M & L for preparation old treated surface of wall and applying one coat of cement base paint complete all as specified and directed.
M & L for preparation old treated surface of wall and applying two coats of cement base paint complete all as specified and directed.
M & L for preparation of New surfaces and applying two coats of cement base paint with primer on New Surface complete all as specified and directed.
Material & Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm complete all as specified and directed. Note- Primer and emmulsion to be carried out through air less spray machine ( Mechanical means)
M & L for applying Two coats of Plastic emulssion paint including primer on surfaces of wall of any description over 10cm width or girth, not otherwise described complete all as specified and directed. Note :- Plastic Emulsion Paint and primer of same manufacturer to be applyed through mechanical means only.
M & L for preparation of surfaces and applying one coat of oil bound distemper with roller on old treated surface of wall etc complete all as specified and directed.
M & L for preparation of surfaces and applying two coat of oil bound distemper with roller on old treated surface of wall etc complete all as specified and directed.
M & L for preparation of surfaces and applying two coat of oil bound distemper with roller on New surface of wall with Primer etc. complete all as specified and directed.
M & L for prepration of old surface of wall and applying one coat of white wash complete all as specified and directed.
M & L for preparation of old treated surface of ceiling and applying one coat of white wash complete all as specified and directed.
M & L for prepration of old treated steel surface of any description exceeding 10cm width or girth and applying one coat of synthetic enamelled paint complete all as specified and directed.
M & L for preparation of old treated wood or wood based surface of any description exceeding 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed.
M & L for taking down cement plaster on brick or concrete surfaces including racking out joints hacking for key scrubbing down with water etc and rendering 15 mm thick in two layers of 10+5mm in CM 1:4 mixed with Pidi Proof 101 LW (+) of Dr fixit or equivalant integral water proofing admixture @ 200ml/bag over two coats of super latex 302 of Dr fixit or equivalant in the ratio (1:4:7) ,( one part super latex, 4 part water and 7 parts of cement) @ 1.50kg of homogenious mixture/sqm in two coats and finish the surface even and smooth without using extra cement) for external walls complete all as specified and directed. Note :-Pidi proof and super latex to be measured and paid separately.
M & L for taking down cement plaster on brick or concrete surfaces including racking out joints hacking for key scrubbing down with water etc and rendering 10 mm thick in CM 1:6 mixed with PD Proof 101 LW (+) of Dr fixit or equivalant integral water proofing admixture @ 200ml/bag over two coats of super latex 302 of Dr fixit or equivalant in the ratio (1:4:7) ,( one part super latex, 4 part water and 7 parts of cement) @ 1.50kg of homogenious mixture/sqm in two coats and finish the surface even and smooth (without using extra cement) for external walls complete all as specified and directed. Note :- PD proof and super latex to be measured and paid separately.
Supply only Pidi proof 101 LW(+)
Supply only super latex 302
Material & Labour for taking down Cement plaster on brick or concrete surfaces including racking out joints, hacking for key scrubbing down with water etc and rendering 15 mm thick in ready mix cement water 1:4 on fair faces of brick masonry or concrete surfaces of walls upto 3 storey height mixed with water proofing compound (ISI Marked) @3% by weight of cement or as per manufacturer instructions, finished even and fair complete all as sepecified and directed after applying one coat of smart care damp guard/block 2K of Make:- Asian paints/Dr. Fixit or equivalent as approved by GE.
Removal of plants/trees/Shrubs from roof tops/sides, external walls of bldg, chajjas, wall junctions, junctions of rain water/CI soil/waste pipe junctions including taking out the roots entered in wall/slab surfaces and making good the disturbed surfaced using PCC (1:2:4) type B-0 or cement mortar (1:2) including repairing the GI/CI/PVc pipe joints which were damged during cutting/taking out process to match with the existing and finishing the disturbed surfaces to match with existing including necessary scaffolding/staging upto a height of 15.00 m from the ground level complete all as specified as directed.
M&L for preparation old treated surface of wall of OH Tank upto height of 12m to 18M and applying two coats of cement base paint includding alkali rasistant primer with roller, including necessary scaffolding/ staging and formwork complete all as specified and directed
M&L preparation of old decorated surfaces and writting letters n.exc 30cm high including back ground n.exc 450mm dia complete all as specified and directed
Notes for all items (i) All materials i.e cement based paint, OBD, Plastic emulsion paint etc required for execution of work shall be dumped in MES store yard before incorporating the Work. Purchage voucher of materils as procured shall also required to be submitted by the contractor to Engineer in Charge. The department will issue day to day materials for incorporation in the work as per site requirement . (ii) Any CI/AC/PVC pipes or pipe fittings damaged during the process of work shall be replaced by new one without any extra cost to the department. (iii) The debris including vegetation plant/trees shall be disposed off to a distance exc 0.5 Km and n.exe 1.00 K m all as directed by engineer -in charge. (iv) For deciding the girth of the plant/tree the height shall be taken at 30 cm above the slab/wall. (v) The labour employed by the contractor for carrying out the work shall be provided with safety equipment and quoted shall be deemed to include the same. (vi) All windows, joineries, mirrors, fittings, doors etc. shall be covered before painting the surfaces and the same shall be cleaned including cleaning of floors as directed by the Engineer-in-Charge, failing which a recovery shall be done from the RAR as decided by Garrison Engineer and the quoted rate is deemed inlusive of these provisions.
M/S PRAKASH RAIKWAR TRADERS AND CO
DEVENDRA ENTERPRISES
M/S Chadha Brothers
M/S GR construction compony
S S CONSTRUCTION COMPANY
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .