Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-AOC | ₹23.0 L | L1 | Accepted-AOC Financial bid is accepted at the price Rs 2297295.27 the Employer |
| 2 | L2₹23.0 LRejected-Finance N A | NA | NA | 121004 | ₹23.0 L | L2 | Rejected-Finance Being higher rate rejected |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
30 Apr 2026, 12:00 pmClosed
Executive Engineer PD PWD Sitapur
Office of the Executive Engineer PD PWD Sitapur
Construction work of Anganwadi Centre in Saraiyakadipur-02 Development Block Pahla
2026_CEUCZ_1140763_3
1141/E-TENDER/2026-27 DT. 01.04.2026
Open Tender
Civil Works - Buildings
60 days
SITAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3 L
Yes
Office of the Executive Engineer PD PWD Sitapur
8 May 2026
23 Apr 2026
30 Apr 2026
23 Apr 2026
30 Apr 2026
23 Apr 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation for dtructure as per drawing and technical specification including setting out, construction shoring and bracing removal of atumps and other deleterious and disposal upto lead of 50m dressing of sides and bottam and backfilling in trenches with excavated with excavated suitable material | - | Cum. | - | - |
| 2 | Filing of Earth in plinth including supply of necessary quantity of sand from a distance not exceeding 15.0 km. from the site of work and including watering, ramming, dressing etc rate to include cost of all materials, labour and T & P etc required for proper completion of the work. | - | Cum. | - | - |
| 3 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | - | Cum. | - | - |
| 4 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, ramming, dressing etc rate to include cost of all materials, labour and T & P etc required for proper completion of the work. | - | Cum. | - | - |
| 5 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment of soil along external perimeter of building 7.5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/sqm. | - | Sqm. | - | - |
| 6 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Footing foundation excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item. | - | Cum. | - | - |
| 7 | P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and and over lapping & hooks. | - | Qtl. | - | - |
| 8 | Class-150 (Non Modular) brick work in 1:6 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | - | Cum. | - | - |
| 9 | Brick work in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not to be less than 1.5 brick thick. (1:6 cement & coarse sand) (230mm wall) | - | Cum. | - | - |
| 10 | Mild steel or iron work of small sizes and sections such as hold fast etc. ( when not included in an over all rates) wrought to required from including supply of steel and its wastage including cost of bolts, nuts if required for and welding, grinding and making holes as required completion of work fabrication of holes doors, chaukhats nosing. | - | Kg. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
Tendernotice_2.pdf
PDF • 1.66 MB
BOQ_2130267.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid