Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
20 Aug 2026, 11:00 am
Superintending Engineer attached to C.E.(North)
O/O the Chief Engineer (North), Green Park, Malda
Additional flood protection work using Bullah piling for a length of 350 m from the house of Sitaram Choudhury upto the Paschim Ratanpur Primary School under GP Bilaimari, Block Ratua-I, Dist Malda (2nd Call).
2026_IWD_1034483_1
WBIW/SE/CE(N)/NIT-4(e)/2026-27
Open Tender
CIVIL WORKS
Percentage
50 days
Ratua-I, Malda
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹3.8 L
Yes
30 Jul 2026
30 Jul 2026
21 Aug 2026
30 Jul 2026
20 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other
mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and
depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack
measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Beyond 500 metre and upto 1.00 km | - | Cum | 313.79 | - |
| 2 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other
mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and
depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack
measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Beyond 1.00 km and upto 2.00 km | - | Cum | 323.33 | - |
| 3 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other
mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and
depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack
measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Beyond 2.00 km and upto 3.00 km | 1 | Cum | 332.86 | ₹332.53 |
| 4 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other
mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and
depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack
measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Beyond 3.00 km and upto 4.00 km | - | Cum | 343.59 | - |
| 5 | Compacting earthwork in embankment in layers of 25 cm. by power roller or by any other mechanical means, like tractor driven sheep foot roller/ vibrating plate compactor earth rammer etc., (not at OMC) including necessary watering, labour charges, hire charges of all materials, tools & plants etc. and including cost and supply of all materials complete as per direction of the Engineer-in-charge.
(Payment will be made on the basis of Pre-work & Post-work level) | 8,890.65 | Cum | 25.03 | ₹2,22,532.97 |
| 6 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
20 cm av. Diameter | 3,000 | Mtr. | 363.5 | ₹10,90,500 |
| 7 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
20 cm av. Diameter | 2,850 | Mtr. | 141.82 | ₹4,04,187 |
| 8 | Supplying, fitting and fixing with iron nails half split bullah wailing piecesand cross pieces etc. complete with cost of all materials and carriage to site. Width of thinner end above 15 cm.
Jhaw / Eucalyptus. | 300 | Mtr. | 227.63 | ₹68,289 |
| 9 | Supplying Nylon cage netting of size 1.0 metre x 1.0 metre x 0.40 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 5,874 | Each | 83.67 | ₹4,91,477.58 |
| 10 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in H.D.P.E. bags (minimum 15 nos. ) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches up to 50 cms depth, if necessary, or by boat including cost of hire charges of boat with boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than 0.0328 m3.
Size of Nylon crate is 1.0 metre x 1.0 metre x 0.40 metre.
b) Where boats are not necessary. Considering 85% filling of each bags for compacting in the crate for slope pitching as per guideline.
Note: Considering 85% filling of each bag for comapcting in the crate for slope pitching as per guideline. | 5,874 | Each | 596.23 | ₹35,02,255.02 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.96 MB
2911n.pdf
Tender Documents • 1.15 MB
SectionDrawings.pdf
Tender Documents • 1.05 MB
BOQ_2541167.xls
BOQ • 0.28 MB
BarChart.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].