Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.0 LAdmitted-Fee/PreQual/Technical/Finance | -30.42% | ₹14.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.5 L+₹54,391.87 (3.89%)Admitted-Fee/PreQual/Technical/Finance | -27.71% | ₹14.5 L+₹54,391.87 (3.89%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.8 L+₹87,709.40 (6.28%)Admitted-Fee/PreQual/Technical/Finance | -26.05% | ₹14.8 L+₹87,709.40 (6.28%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹14.9 L+₹88,913.65 (6.37%)Admitted-Fee/PreQual/Technical/Finance | -25.99% | ₹14.9 L+₹88,913.65 (6.37%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹14.9 L+₹88,913.65 (6.37%)Admitted-Fee/PreQual/Technical/Finance | -25.99% | ₹14.9 L+₹88,913.65 (6.37%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
12 Aug 2026, 6:00 pmClosed
Commissioner
Municipal Council Kishangarh
GSB, WBM AND FILLING WORK IN NAGAR PARISHAD AREA.
2026_DLB_582918_13
10/2026-2027/Vikas
Open Tender
Civil Works
Percentage
Kishangarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Commissioner
₹40,000
Yes
17 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 750 | Cum | 178.5 | ₹1,33,875 |
| 2 | Providing, laying and spreading of granular sub-base by providing coarse graded Material (Table 400-2), spreading in uniform layers with motor grader on prepared surface, mixing BY MIX IN PLACE METHOD with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion. Grading - III Material | 315 | Cum | 1,106 | ₹3,48,390 |
| 3 | Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 700 | Cum | 1,775 | ₹12,42,500 |
| 4 | Supplying and stacking good earth at site of work.
Note: 1) Loading, unloading and carriage to be paid extra as per actual lead. 2) Earth measured in stacks will be reduced by 20% foe payment | 870 | Cum | 324.5 | ₹2,82,315 |
stage.html
html • 0.04 MB
finance_1035624.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_1035624.xls
BOQ • 0.28 MB
Annexure.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .