Tender Value
Refer Docs
EMD Value
₹10,910
Closing Date
7 Oct 2026, 10:00 am
DY.DIRECTOR
Deputy Direcctor, NITK, Surathkal - 575 025
Providing minor civil improvement works at Director Bungalow in NITK Campus
2026_NITK_927268_1
Tender No.33/2026-27/HD
Open Tender
Civil Works
Works
25 days
NITK, Surathkal
As per Tender Document
9 documents required · 9 mandatory
₹0
₹10,910
Yes
22 Sept 2026
22 Sept 2026
8 Oct 2026
22 Sept 2026
7 Oct 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fixing mineral fibre false ceiling tiles at all heights of size 595X595 mm of approved texture, design and pattern. The tiles should have Humidity Resistance (RH) of 99%, Light Reflectance ≥ 85%, ThermalConductivity k = 0.052 - 0.057 w/m K, Fire Performance as per (BS 476 pt - 6 &7)in true horizontal level suspended on interlocking T-Grid of hot dipped all round galvanized iron section of 0.33 mm thick (galvanized @120 gsm) comprising of main T runners of 15x32 mm of length 3000 mm, cross T of size 15x32 mm of length 1200 mm and secondary intermediate cross T of size 15x32 mm of length 600 mm to form grid module of size 600x600 mm suspended from ceiling using galvanized mild steel item (galvanised@80gsm) 50 mm long 8 mm outer diameter M-6 dash fasteners, 6 mm diameter fully threaded hanger rod up to 1000 mm length and L-shape level adjuster of size 85x25x2 mm, spaced at 1200 mm centre to centre along main ‘T’. The system should rest on periphery walls /partitions with the help of GI perimeter wall angle of size24x24X3000 mm made of 0.40 mm thick sheet, to be fixed to the wall with help of plastic rawl plug at 450 mm centre to centre & 40 mm long dry wall S.S. screws. The exposed bottom portion of all T-sections used in false ceiling support system shall be pre-painted with polyester baked paint, for all heights. The work shall be carried out as per specifications, drawings and as per directions of the engineer-in-charge.With 16 mm thick beveled tegular mineral fibre Antimicrobial false ceiling tile confirming to ISO 5 (class 100 ) specifications | 66.76 | Square Meter | 2,814.22 | ₹1,87,877.33 |
| 2 | Providing and laying PU Tactile anti-skid tiles with thickness 9-10 mm in 0.3 X 0.3m sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make,terracoat colour and antiskid patterns, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey or white cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. | 108.18 | Square Meter | 885 | ₹95,739.3 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer -in - charge.Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 0.05 | Cubic Meter | 2,799.39 | ₹139.97 |
| 4 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :. In cement mortar | 0.91 | Square Meter | 2,827.79 | ₹2,573.29 |
| 5 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet | 7.56 | Square Meter | 189.69 | ₹1,434.06 |
| 6 | Providing and fixing UPVC Gutter of sdies step profiled overall size 220mm (8") gutter fixing GI bracket clamp fitiing at 1m intervals with necessaryv slopes on each sides with necessary specials such as own spout clip, gutter outlet, 90 degree inside outside corner, skew tee, equal tee, gutter bracket ec including cost of providing UPVC Gutter including cost of materials, scaffolding, for necessary height, labour tec complete as per the specifications and directions of he engineer in-charge. (Including cost of GI bracket clamps) | 17.85 | Meter | 1,267.32 | ₹22,621.66 |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 2.6 | Cubic Meter | 299.35 | ₹778.31 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.3 | Cubic Meter | 8,388.91 | ₹2,516.67 |
| 9 | Providing and fixing up to floor five level precast cement concrete solid block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.85 | Cubic Meter | 20,572.64 | ₹38,059.38 |
| 10 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.With cement mortar 1:4 (1 cement : 4 fine sand) | 115.91 | Square Meter | 629.51 | ₹72,966.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_974442.xls
BOQ • 0.34 MB
TenDoc33.pdf
Tender Documents • 2.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .