Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.9 LAccepted-AOC | ₹34.9 L | L1 | Accepted-AOC Lowest Bid |
| 2 | L2₹37.9 L+₹3.0 L (8.46%)Rejected-Finance 225 NAROT COLONY MODEL TOWN PATHANKOT PB 145001 | PATHANKOT | PUNJAB | 145001 | ₹37.9 L+₹3.0 L (8.46%) | L2 | Rejected-Finance Other than lowest bid |
| 3 | L3₹38.5 L+₹3.5 L (10.1%)Rejected-Finance | ₹38.5 L+₹3.5 L (10.1%) | L3 | Rejected-Finance Other than lowest bid |
| 4 | L4₹38.9 L+₹3.9 L (11.3%)Rejected-Finance | ₹38.9 L+₹3.9 L (11.3%) | L4 | Rejected-Finance Other than lowest bid |
| 5 | L5₹40.0 L+₹5.0 L (14.4%)Rejected-Finance | ₹40.0 L+₹5.0 L (14.4%) | L5 | Rejected-Finance Other than lowest bid |
Tender Value
₹43.4 L
EMD Value
₹87,000
Closing Date
15 Aug 2020, 6:00 pmClosed
GE South Mamun
GE South Mamun Pathankot
PROVN OF OCEMS (ONLINE CONTINUOUS EFFLUENT MONITORING SYSTEM) FOR STP 370KLD and 1800KLD and 2500KLD AT MAMUN MILITARY STATION UNDER GE (SOUTH) MAMUN
2020_MES_363962_1
GE(S)/M-29/2020-21
Open Tender
Miscellaneous Works
Item Rate
180 days
GE South Mamun
Refer Tender Documents
8 documents required · 8 mandatory
₹500
GE South Mamun
₹87,000
Yes
24 Sept 2020
25 Jul 2020
17 Aug 2020
25 Jul 2020
15 Aug 2020
10 Aug 2020
25 Jul 2020 - 31 Jul 2020
Amount
Supply, install, testing & commissioning of ONLINE WATER QUALITY MONITORING ANALYZER microprocessor based (ONLINE CONTINUOUS EFFLUENT MONITORING SYSTEM) all as per CPCB & PPCB norms for MBBR type STP Bana Enclave 2500 KLD, with following specification all as specified and directed, Make: Tethys / forbes Marshal/ Nevco/Emerson Instruments/DREXEL or equivalent approved by GE/PPCB/ CPCB . (a) COD, BOD & TSS measurement by UV -VIS absorbance method. (b) pH measurement by electrochemical method or potentiometric with pH sensor. (c) Digital out put RS 232/ RS 485, USB port and the OCEMS system compatible to PLC automation. (d) Screen ( Colour TFT LCD with LED backlight, (e) Enclosure : Stainless steel with epoxy coating, IP54. (f) Automatic build in cleaning function. user pogrammable Measurement (g) Online auto zero calibration for COD/BOD/TSS with offset correction and manual span calibration. (h) Range :COD : 0-500 mg/l , BOD+E47 : 0-200 mg/l , TSS: 0-1500 mg/l and pH: 0-14. (j) Sample Line up to Analyzer. (k) UPS Inverter with suitable capacity of battery 8 hrs electrical backup (l) 5 Years year Software plan Included in quoted rate with the following scope:- (i) Design, engineering & amp; supply for the quoted system as per the technical specification and as per CPCB/State Pollution Board (PPCB) guidelines. (ii) Power for AC powered hardware where required. (iii) Internet connectivity up to Analyzer. (iv) Lab inspection, report of sample.
Note:- The rate quoted deemed to be inclusive (i) Drain facility near Analyzer, (ii) Necessary arrangement for mounting OD Analyzer , Any Civil/ Structural/ Fabrication , Modem & other connected accessories complete as per site reqd. (iii) Warranty for a period of 5 years from the date of commissioning including minimum one service visit for every four months excluding breakdown calls. The System should comply with the following:- (a) Should provide continuous measurement of data for long period of time, at the monitoring site of interest, without skilled staff being required to perform the analysis. (b) All the major steps in traditional analysis like sample collection, preservation,transportation, sample pre – treatment, calibration, reagent addition and sample analysis procedures should be automated. (c) In case of sudden disturbance in the system, compared to conventional methods the on-line analyzer should provide timely information for taking immediate corrective /preventive steps. (d) Should be capable of operating unattended over prolonged period of time. (e) Should produce analytically valid results with precision and repeatability. (f) Should be robust and rugged, or optimal operation under extreme environmental conditions, while maintaining its calibrated status. (g) Should have data validation facility with features to transmit raw and validated data to central server.’ (h) Should have Remote system access from central server provisioning log file access. (j) Should have provision for Multi-server data transmission from each station without intermediate PC or plant server. (k) Should have provision to send system alarm to central server in case any changes made in configuration or calibration. (l) Should have provision to record all operation information in log file. (m) For each parameter there should be provision for independent analysis, Validation, Calibration & data transmission.
Reporting: The ONLINE CONTINUOUS EFFLUENT MONITORING SYSTEM) supplier/ tenderer have to provide link with central server at CPCB and State PCB (PPCB) with latest software to view the data in graphical / tabular format as per suitability and also to compare the date features. One minute date average must be transmitted / retrieved to servers every 30 minutes. In the event of transmission loss the time stamped data in the data logger memory must be transmitted to fill form the last transmission break with a stamp of time delay. The software should have two way communications, so that data from the system can be seen whenever desired and remote of controller/data logger can be taken to visualize the immediate status of the system.
Data Management: Considering the heterogeneity of real time monitoring systems, real time data should be submitted to CPCB and State PCB (PPCB) as per their requirement by supplier/tenderer. i). The software should give alarm, in case of the concentration of parameter exceeds the prescribed norms by 10% continuously. ii). The supplier should facilitate data transmission on behalf of STP Bana Enclave of GE (S) Mamun. The supplier should ensure at least 85% data availability from the system installed. iii). The supplier shall link with server of PPCB / CPCB for transferring data from the real time system. iv). The supplier shall make provisions to provide data continuously at least 04 locations in State PCB (PPCB), RO/DO of CPCB and to Department as directed directly from the analyzers. v). In case of system requiring pumping of samples, the supplier /tenderer has to ensure that dilution of sample is not possible and in case of any dilution, the system gives alarm. vi). The supplier should regularly cross check the data obtained from real time system with that of the samples collected manually and analyze/test the sample from PBTI (Punjab Biotechnology Incubator) Lab or PPCB Lab as directed and revalidate the factor for interpolation / extrapolation of COD/ BOD values essential for generating better quality data. The supplier / tenderer should take responsibility of establishing co-relation factor.
Supply, install, testing & commissioning of ONLINE WATER QUALITY MONITORING ANALYZER microprocessor based (ONLINE CONTINUOUS EFFLUENT MONITORING SYSTEM) all as per CPCB & PPCB norms for MBBR type STP Bhaskar Enclave 1800 KLD, with following specification all as specified and directed, Make: Tethys / forbes Marshal/ Nevco/Emerson Instruments/DREXEL or equivalent approved by GE/PPCB/ CPCB . (a) COD, BOD & TSS measurement by UV -VIS absorbance method. (b) pH measurement by electrochemical method or potentiometric with pH sensor. (c) Digital out put RS 232/ RS 485, USB port and the OCEMS system compatible to PLC automation. (d) Screen ( Colour TFT LCD with LED backlight, (e) Enclosure : Stainless steel with epoxy coating, IP54. (f) Automatic build in cleaning function. user pogrammable Measurement (g) Online auto zero calibration for COD/BOD/TSS with offset correction and manual span calibration. (h) Range :COD : 0-500 mg/l , BOD+E47: 0-200 mg/l , TSS: 0-1500 mg/l and pH: 0-14. (j) Sample Line up to Analyzer. (k) UPS Inverter with suitable capacity of battery 8 hrs electrical backup (l) 5 Years year Software plan Included in quoted rate with the following scope:- (i) Design, engineering & amp; supply for the quoted system as per the technical specification and as per CPCB/State Pollution Board (PPCB) guidelines. (ii) Power for AC powered hardware where required. (iii) Internet connectivity up to Analyzer. (iv) Lab inspection, report of sample.
Note:- The rate quoted deemed to be inclusive:- (i) Drain facility near Analyzer, (ii) Necessary arrangement for mounting OD Analyzer , Any Civil/ Structural/ Fabrication , Modem & other connected accessories complete as per site reqd. (iii) Warranty for a period of 5 years from the date of commissioning including minimum one service visit for every four months excluding breakdown calls. The System should comply with the following:- (a) Should provide continuous measurement of data for long period of time, at the monitoring site of interest, without skilled staff being required to perform the analysis. (b) All the major steps in traditional analysis like sample collection, preservation,transportation, sample pre – treatment, calibration, reagent addition and sample analysis procedures should be automated. (c) In case of sudden disturbance in the system, compared to conventional methods the on-line analyzer should provide timely information for taking immediate corrective /preventive steps. (d) Should be capable of operating unattended over prolonged period of time. (e) Should produce analytically valid results with precision and repeatability. (f) Should be robust and rugged, or optimal operation under extreme environmental conditions, while maintaining its calibrated status. (g) Should have data validation facility with features to transmit raw and validated data to central server.’ (h) Should have Remote system access from central server provisioning log file access. (j) Should have provision for Multi-server data transmission from each station without intermediate PC or plant server. (k) Should have provision to send system alarm to central server in case any changes made in configuration or calibration. (l) Should have provision to record all operation information in log file. (m) For each parameter there should be provision for independent analysis, Validation, Calibration & data transmission.
Reporting: The ONLINE CONTINUOUS EFFLUENT MONITORING SYSTEM) supplier/ tenderer have to provide link with central server at CPCB and State PCB (PPCB) with latest software to view the data in graphical / tabular format as per suitability and also to compare the date features. One minute date average must be transmitted / retrieved to servers every 30 minutes. In the event of transmission loss the time stamped data in the data logger memory must be transmitted to fill form the last transmission break with a stamp of time delay. The software should have two way communications, so that data from the system can be seen whenever desired and remote of controller/data logger can be taken to visualize the immediate status of the system.
Data Management: Considering the heterogeneity of real time monitoring systems, real time data should be submitted to CPCB and State PCB (PPCB) as per their requirement by supplier/tenderer. i). The software should give alarm, in case of the concentration of parameter exceeds the prescribed norms by 10% continuously. ii). The supplier should facilitate data transmission on behalf of STP Bhaskar Enclave of GE (S) Mamun. The supplier should ensure at least 85% data availability from the system installed. iii). The supplier shall link with server of PPCB / CPCB for transferring data from the real time system. iv). The supplier shall make provisions to provide data continuously at least 04 locations in State PCB (PPCB), RO/DO of CPCB and to Department as directed directly from the analyzers. v). In case of system requiring pumping of samples, the supplier /tenderer has to ensure that dilution of sample is not possible and in case of any dilution, the system gives alarm. vi). The supplier should regularly cross check the data obtained from real time system with that of the samples collected manually and analyze/test the sample from PBTI (Punjab Biotechnology Incubator) Lab or PPCB Lab as directed and revalidate the factor for interpolation / extrapolation of COD/ BOD values essential for generating better quality data. The supplier / tenderer should take responsibility of establishing co-relation factor.
Supply, install, testing & commissioning of ONLINE WATER QUALITY MONITORING ANALYZER microprocessor based (ONLINE CONTINUOUS EFFLUENT MONITORING SYSTEM) all as per CPCB & PPCB norms for MBBR type STP Basantar Enclave 370 KLD, with following specification all as specified and directed, Make: Tethys / forbes Marshal/ Nevco/Emerson Instruments/DREXEL or equivalent approved by GE/PPCB/ CPCB . (a) COD, BOD & TSS measurement by UV -VIS absorbance method. (b) pH measurement by electrochemical method or potentiometric with pH sensor. (c) Digital out put RS 232/ RS 485, USB port and the OCEMS system compatible to PLC automation. (d) Screen ( Colour TFT LCD with LED backlight, (e) Enclosure : Stainless steel with epoxy coating, IP54. (f) Automatic build in cleaning function. user pogrammable Measurement (g) Online auto zero calibration for COD/BOD/TSS with offset correction and manual span calibration. (h) Range :COD : 0-500 mg/l , BOD+E47: 0-200 mg/l , TSS: 0-1500 mg/l and pH: 0-14. (j) Sample Line up to Analyzer. (k) UPS Inverter with suitable capacity of battery 8 hrs electrical backup (l) 5 Years year Software plan Included in quoted rate with the following scope:- (i) Design, engineering & amp; supply for the quoted system as per the technical specification and as per CPCB/State Pollution Board (PPCB) guidelines. (ii) Power for AC powered hardware where required. (iii) Internet connectivity up to Analyzer. (iv) Lab inspection, report of sample.
Note:- The rate quoted deemed to be inclusive:- (i) Drain facility near Analyzer, (ii) Necessary arrangement for mounting OD Analyzer , Any Civil/ Structural/ Fabrication , Modem & other connected accessories complete as per site reqd. (iii) Warranty for a period of 5 years from the date of commissioning including minimum one service visit for every four months excluding breakdown calls. The System should comply with the following:- (a) Should provide continuous measurement of data for long period of time, at the monitoring site of interest, without skilled staff being required to perform the analysis. (b) All the major steps in traditional analysis like sample collection, preservation,transportation, sample pre – treatment, calibration, reagent addition and sample analysis procedures should be automated. (c) In case of sudden disturbance in the system, compared to conventional methods the on-line analyzer should provide timely information for taking immediate corrective /preventive steps. (d) Should be capable of operating unattended over prolonged period of time. (e) Should produce analytically valid results with precision and repeatability. (f) Should be robust and rugged, or optimal operation under extreme environmental conditions, while maintaining its calibrated status. (g) Should have data validation facility with features to transmit raw and validated data to central server.’ (h) Should have Remote system access from central server provisioning log file access. (j) Should have provision for Multi-server data transmission from each station without intermediate PC or plant server. (k) Should have provision to send system alarm to central server in case any changes made in configuration or calibration. (l) Should have provision to record all operation information in log file. (m) For each parameter there should be provision for independent analysis, Validation, Calibration & data transmission.
Reporting: The ONLINE CONTINUOUS EFFLUENT MONITORING SYSTEM) supplier/ tenderer have to provide link with central server at CPCB and State PCB (PPCB) with latest software to view the data in graphical / tabular format as per suitability and also to compare the date features. One minute date average must be transmitted / retrieved to servers every 30 minutes. In the event of transmission loss the time stamped data in the data logger memory must be transmitted to fill form the last transmission break with a stamp of time delay. The software should have two way communications, so that data from the system can be seen whenever desired and remote of controller/data logger can be taken to visualize the immediate status of the system.
Data Management: Considering the heterogeneity of real time monitoring systems, real time data should be submitted to CPCB and State PCB (PPCB) as per their requirement by supplier/tenderer. i). The software should give alarm, in case of the concentration of parameter exceeds the prescribed norms by 10% continuously. ii). The supplier should facilitate data transmission on behalf of STP Basantar Enclave of GE (S) Mamun. The supplier should ensure at least 85% data availability from the system installed. iii). The supplier shall link with server of PPCB / CPCB for transferring data from the real time system. iv). The supplier shall make provisions to provide data continuously at least 04 locations in State PCB (PPCB), RO/DO of CPCB and to Department as directed directly from the analyzers. v). In case of system requiring pumping of samples, the supplier /tenderer has to ensure that dilution of sample is not possible and in case of any dilution, the system gives alarm. vi). The supplier should regularly cross check the data obtained from real time system with that of the samples collected manually and analyze/test the sample from PBTI (Punjab Biotechnology Incubator) Lab or PPCB Lab as directed and revalidate the factor for interpolation / extrapolation of COD/ BOD values essential for generating better quality data. The supplier / tenderer should take responsibility of establishing co-relation factor.
Supply and fixing RCCB with MCB , 10- 32 Amp rating with sensitivity of 30 mA with MCB DB 4 Way suitable for 240 Volts complete all as specified and directed.
M&L for one light point or one six pin switch socket outlet (independent) controlled by one switch complete with 2.5 Sqmm multistranded FRLS PVC insulated unsheathed fire retardent copper conductor cable 1100 volts grade in and including non metallic rigid PVC heavy duty casing capping complete fixed on wall or ceiling etc including 2.5 Sqmm single core FRLS PVC green insulated unsheathed multi stranded copper conductor 1100 Volts grade as earth continuity wire connected to common earth dolly with including sunken type pressed steel terminal boxes of suitable size with 3mm thick bakelite sheet white/coloured top cover complete all as specified and directed.
Description all as per srl item No 5.00 here-in-before but one 3/5 pin, 5 amps socket outlet point on same board complete all as specified and directed.
Supply and fixing Socket outlet 2 in 1, 3 pin, 5 and 15 amp flush type complete all as specified and directed.
Supply and fix Socket outlet 2 in 1, 3 pin, 5A on same board complete all as specified and directed.
M&L for earthing complete with galvanised steel earth electrode 60cmx60cmx6mm buried directly in ground vertically to depth not less than 2.25m below normal ground level with top edge of the earth plate at a depth not less than 1.5m below ground level connected to and including GI earth lead wire 4 mm dia by means of nuts, bolts, check nuts and washer etc, made of GI and connected to test point and earth dolly all as shown in electrical plate No. 3 SSR Part-I 2009 and specified or indicated including excavation and earthwork in any type of soil PCC (1:3:6) Type C1 in chamber, precast RCC 50 mm thick in cement concrete (1:2:4) type B1, reinforced with welded steel wire fabric or XPM (Weight not less than 4.00 Kg/Square metre) with cast iron frame, funnel with wire mesh, 20mm bore medium grade GI watering pipe, lugs, 15mm bore medium grade GI protection pipe, test point etc. complete all as specified and directed. Note:- (i) Item includes the cost of 7.5 metre GI pipe for protection of earth lead. (ii) Item includes the cost of 7.5 metre GI earth lead.
M&L for cleaning the entire equilisation tank -01 No and treated water tank-01No by removing all loose/ sedimented sand, sewage water, sludge, mud, vegetation, grit, ash, rages, fibers and string materials etc disposed off the sludge away from the cantt area using safety protection/devices for working men power while working as per procedure in vouge complete all as specified and directed.
M&L for cleaning the entire filter feed tank -01 No by removing all loose/ sedimented sand, sewage water, sludge, mud, vegetation etc disposed off the sludge away from the cantt area using safety protection/devices for working men power while working as per procedure in vouge complete all as specified and directed.
M&L for stainless steel air grid pipe 25 mm dia Sch 10S with damper and connected accessories with cutting, welding and threading and making holes complete laying on bed of the equalisation and treated water tank complete all as specified and directed.
M & L for stainless steel air grid pipe 50 mm dia Sch 10S with damper and connected accessories with cutting, welding and threading and making holes complete all as specified and directed.
Supplying & fixing for 50 mm dia galvanized steel / MS tubing medium grade with all fittings and fixed to walls or laid in floors complete all as specified and directed.
Supply and fixing cast iron butterfly valve (wafer type) 50 mm bore dia including jointing material such as rubber gaskets, bolts, nuts & washers etc. all as specifed and directed.
Supply and fixing cast iron butterfly valve (wafer type) 80 mm bore dia including jointing material such as rubber gaskets, bolts, nuts & washers etc. all as specifed and directed.
Supply and fixing Monoblock pump set 6-7 LPS @ 12 Mtr suitable for 415 V ,3 phase system, 1400 RPM complete all as specified and directed.
Supply and lay Pipes MS ERW including specials, nominal dia 80 mm as per IS 3589 (1981) thickness not less than 5.0 mm welded to pipe in multiple length / flange end , bend, jointing rubber gasket, bolt and nuts complete all as specified and directed
Supply and fixing of cast iron flanged ends Non Return Valve suitable for 80 mm dia pipes with MS nuts, rubber gasket ,bolts, washers etc, as approved including taking out/ dismantling old unserviceable one and testing complete all as specified and as directed.
S & F for 6.0 Sqmm, 3 core, 1100 Volts, copper conductor flat cable including connecting to motor complete all as specified and directed.
S & F for 5 HP motor stater control panel consist contactor,relay on off switch SPP auto/manual mode ,terminal plate and volt and Amp meter complete all as spd and directed.
Material & labour for plain cement concrete (1:2:4) type B-1 using 20 mm graded stone aggregate as in copping for foundation and thrust block including necessary form work or in any other situation work complete all as specified and directed.
M/S SHRI RAM BUILDERS
Harsh India Enterprises
M/S J N TRADERS
M/s JAIMAA ASSOCIATES
AGGARWAL ASSOCIATES
STANDARD CONSTRUCTION CO
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .